Govindpuri railway station
Govindpuri Junction Kanpur South | |||||
---|---|---|---|---|---|
Howrah Kanpur→Jhansi | |||||
Platforms | 3 (present,10 under construction) | ||||
Tracks | 22 | ||||
Construction | |||||
Structure type | Railway station | ||||
Parking | Available | ||||
Bicycle facilities | Available | ||||
Other information | |||||
Status | Active | ||||
Station code | GOY | ||||
Zone(s) | kanpur central | ||||
Division(s) | kanpur central | ||||
Fare zone | North Central Railways | ||||
History | |||||
Opened | 1921 | ||||
Rebuilt | 2016 | ||||
Electrified | 2002 | ||||
Previous names | Indian Branch Railway Company Northern Railway | ||||
Passengers | |||||
650000 | |||||
Services | |||||
ATM
| |||||
|
Govindpuri Junction or Kanpur South is a railway station in
Strictly speaking by definition, it is the junction where Jhansi/Banda line is separated from Delhi–Howrah Line; however, it is not granted junction status yet due to which it has two station codes, GOV and GOY. There are ten platforms under construction to reduce load from Kanpur Central so that 256 more trains that can't be handled by other stations due to the lack of tracks and platforms will given to kanpur central as it is being rebuilt to cater 1200 trains per day and currently it is catering 611 trains.
Location
It is located near Govind Nagar locality in Kanpur South. A pair of rail overbridge is also there (bearing the same name), which remains congested throughout the day.
History
Due to proximity to Juhi yard, the station was called Juhi till the 1970s.
Trains
- Mahoba-Kanpur Passenger
Trains with no stops
- Shatabdi Exp.
- Rajdhani Exp.
- Duronto Exp.
Future development
However, in next two years, things will change it will become the first halt station in India which will directly turn into Terminal station. Kanpur South The new terminal will help decongest
The station is ongoing construction of a new waiting room, a new ticketing room, new platforms and overbridge. The Reservation Room has been constructed and now in use and the older one will be dismantled. The new Platform No. 1 is also under construction which be longer and slightly before than earlier one leaving an extra loop line between Platform no. 1 and Platform no. 2. The older Platform No. 1 will be dismantled.
The width of Platform No. 2 and Platform No. 3 is also been increased.
There are plans to run some express and passengers trains from Govindpuri.[clarification needed]
Trains towards Jhansi, Mahoba, Banda/Chitrakoot, Etawah and Tundla will be managed by Kanpur South.[3][failed verification]
See also
- Kanpur Central
- Kanpur Anwarganj
- Lucknow–Kanpur Suburban Railway
References
- ^ "Govindpuri railway station in Kanpur to have all-women staff from today". 8 March 2018.
- ^ "Old Mailing List Archive Index". IRFCA.org. Retrieved 1 September 2022.
- ^ "Yahoo Search - Web Search".