Guaanzhuang station
Guaanzhuang side platforms ) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | BT06 | ||||||||||
History | |||||||||||
Opened | December 27, 2003 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Guaanzhuang[1] Location in Beijing |
Guaanzhuang stationChaoyang District.
In future, it will be a transfer station with Line 22 (Pinggu line) which is currently under construction.
History
Guaanzhuang station opened on December 27, 2003. The installation of
Name conflict
This station had the same English name as
a station on Line 15, also part of the Beijing Subway system. In Chinese this is not a problem as the station on Line 15 is called 关庄 and one on the Batong Line is called 管庄, but the government policy in China is to create English names from the pinyin
transliteration of Chinese language, but without the tone markers; thus 关庄 (Guānzhuāng) and 管庄 (Guǎnzhuāng) are both rendered as Guanzhuang, making them look identical.
In December 2019, the 管庄 (Guǎnzhuāng) station on Batong line changed spelling to Guaanzhuang.[1]
Station layout
The station has 2 elevated
side platforms
.
Exits
There are 6 exits, lettered A1, A2, A3, A4, B1, and B2. Exits B1 and B2 are accessible.
References
- ^ a b c "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
- ^ (Chinese) 13号线、八通线加装屏蔽门工程试点站已于近日开工. Beijing Subway. Retrieved September 15, 2012.
- ^ (Chinese) 八通线、13号线试点站屏蔽门安装主体工程完工. Beijing Subway. September 28, 2012. Retrieved November 8, 2012.
External links
- Media related to Guaanzhuang Station at Wikimedia Commons