Holmestrandsporten
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
---|---|
Electrified | 15 kV 16.7 Hz AC |
Operating speed | 250 km/h (160 mph) |
The Holmestrandsporten Tunnel (Holmestrandsporten) is a 12,300-meter (7.6 mi) long
double track railway tunnel which runs through Holmestrandfjellet in Holmestrand and Tønsberg in Vestfold, Norway.[2] It was opened for traffic on Monday 28 November 2016.[3]
Located on the Vestfold Line, the tunnel was built as part of the 14.3-kilometer (8.9 mi) double-track high-speed segment from Holm to Nykirke.[4] The new Holmestrand Station is located inside the mountain in the middle of the tunnel.[5] The total cost of the project was estimated to be 6.6 billion Norwegian Kroner upon completion.[6] The new tunnel reduces traveling time on the Vestfold Line by five minutes.
References
- ^ Broms, Jan (28 February 2014). "Tunnelen ved Nykirke skal hete Holmestrandsporten" [The tunnel by Nykirke will be named Holmestrandsporten]. Gjengangeren (in Norwegian). Horten, Norway. Retrieved 11 January 2015.
- ^ Holmestrandsporten: Endelig fullt gjennomslag fra nettsidene til Jernbaneverket
- ^ NRK. "Åpnet 14 km jernbane til 6,6 milliarder". NRK. Retrieved 28 November 2016.
- ^ Anne Mette Storvik (22 June 2016). "Holm-Nykirke: Åpner for trafikk 28. november". Jernbaneverket. Retrieved 1 October 2016.
- Norwegian National Rail Administration. Archived from the originalon 24 April 2015. Retrieved 10 January 2015.
- ^ NRK. "Åpnet 14 km jernbane til 6,6 milliarder". NRK. Retrieved 28 November 2016.
Wikimedia Commons has media related to Holmestrandsporten Tunnel.