Khashm el-Girba Dam
Khashm el-Girba Dam | |
---|---|
Kaplan-type | |
Installed capacity | 10 MW (13,000 hp) |
The Khashm el-Girba Dam is a
The dam is equipped with canal headworks, located on its left bank, which divert water into a canal. When water levels in the reservoir are low, three pumps move water into the canal.
The main portion of the dam is an earthen embankment; the spillway and irrigation headworks sections are concrete gravity.
See also
References
- ^ "Sediment case study template_Khashm El Girba.indd". Archived from the original on 2020-10-30. Retrieved 2020-10-26.
- ^ Ahmad, Siyam. "Assessment of The Current State of The Nile Basin Reservoir Sedimentation Problems" (PDF). Nile Basin Capacity Building Network. p. A3. Archived from the original (PDF) on 9 October 2010. Retrieved 16 February 2013.
- ^ "Khashm Algirba Dam". Sudanese Hydro Generation Co Ltd. Archived from the original on 11 April 2013. Retrieved 16 February 2013.
- ^ "Khashm El Girba Hydro Power Station Rehabilitation (2002-04)". Heavy Engineering Ltd. Retrieved 16 February 2013.