Koman Hydroelectric Power Station

Coordinates: 42°06′23″N 19°49′37″E / 42.10639°N 19.82694°E / 42.10639; 19.82694
Source: Wikipedia, the free encyclopedia.
Komani Hydroelectric Power Station
MW

The

Drin River was built. The dam is near the settlement of Koman, northern Albania. It is the second of three dams on the Drin River; the Fierza Hydroelectric Power Station upstream, and the Vau i Dejës Hydroelectric Power Station downstream. The dam, 130m tall, was completed in 1985 and the reservoir was filled with water at full capacity in 1986.[1]

Completed in 1986, the power station consists of four turbines of

MW each, totalling the installed capacity to 600 MW.[2]