Leach Highway
Leach Highway | |
---|---|
Leach Highway in Melville | |
General information | |
Type | Highway |
Length | 23 km (14 mi) |
Route number(s) |
|
Major junctions | |
East end | Airport Drive, Perth Airport |
| |
West end | High Street (State Route 7), Palmyra |
Location(s) | |
Major suburbs | Welshpool, Wilson, Rossmoyne, Winthrop, Melville |
Highway system | |
Leach Highway is a 23-kilometre (14 mi) east-west arterial highway in the southern suburbs of Perth, Western Australia, primarily linking Kewdale and Perth Airport with the city of Fremantle.
It is allocated State Route 7 and is a dual carriageway for its entire length. Leach Highway varies in width between four and six lanes, with speed limits of 70 and 80 km/h (43 and 50 mph).
Route description
Leach Highway is one of the state's most important heavy vehicle routes. It links the major industrial areas of
Although the Leach Highway's western terminus is at Carrington Street in Palmyra, High Street continues for a further 1.5 km (0.9 mi) into Fremantle, and connects it to the Stirling Highway.
History
Leach Highway is named for J. D. "Digby" Leach, former Commissioner of
It was soon extended eastward from High Road through to Manning Road, utilising the old timber
In the early 1980s the highway was extended further eastward, first to Hardey Road and, soon thereafter, to the new Beechboro-Gosnells Highway (now called Tonkin Highway) which remains as the highway's present eastern terminus.
Also around that time a number of intersections were built to coincide with new roads being built around Leach Highway. A parclo interchange was constructed at the newly extended Kwinana Freeway, and an intersection was constructed for the new Centenary Avenue in Wilson to improve access to the Western Australian Institute of Technology (WAIT), now called Curtin University. New at-grade intersections were built at Murdoch Drive and Winthrop Drive to service the new suburbs of Bateman and Winthrop.
Although not strictly Leach Highway, in 1985 Stirling Highway was extended southwards from its then terminus at Canning Highway to a new terminus at High Street (an extension of Leach Highway). This marked the final piece of an improved freight link between the Port of Fremantle and Perth's major industrial areas around Kewdale.
Apart from minor modifications, the Leach Highway remained largely unchanged until 2005/2006 when work on projects at Kwinana Freeway and Orrong Road commenced.
Orrong Road interchange
In November 2005, the state government announced plans for the construction of a $21 million diamond interchange at the intersection of Leach Highway and Orrong Road in Welshpool. Orrong Road, which is a continuation of Graham Farmer Freeway has experienced an increase in traffic by approximately 40% since the freeway was completed in 2000. The new bridge brought Leach Highway over Orrong Road, allowing, at the time, free-flowing traffic from Welshpool Road to Abernethy Road. The intersection was formerly Perth's worst blackspot. Approximately 70,000 vehicles, including substantial numbers of trucks, use the intersection daily. Funding for the project was made available through the sale of land reserved for the Fremantle Eastern Bypass. The interchange was completed in July 2007.[4]
Bull Creek railway station
Gateway WA
As part of the Gateway WA project, which commenced in 2013 and was completed in March 2016, Leach Highway was upgraded
Future upgrades
Welshpool Road interchange
In February 2018, then Federal Opposition transport and infrastructure spokesman Anthony Albanese pledged to put $46.5 million toward upgrading the Leach Highway and Welshpool Road to a grade-separated interchange if Labor won the upcoming Federal election.[6] The intersection is considered to be one of Perth's most congested, with a high number of crashes occurring.[7] The cost of the upgrade was at the time estimated to cost $93 million[8]
In 2021, construction on site has started, continuing into 2023. The initial plan was to construct an overpass of Leach Highway over Welshpool Road, with a roundabout-interchange constructed below the overpass. It also included upgrading the bridge over the railway line leading to Armadale and also improving pedestrian access via sidewalks. Currently, the overpass has been constructed and more minor modifications will continue into 2023.
Major interchanges and exits
As Leach Highway is not limited access, a large number of the roads that Leach Highway are connected to are not controlled. Major intersections are at-grade and controlled. Exceptions are the Albany Highway, Orrong Road and Abernethy Road, which are grade separated in favour of Leach Highway. The first two are diamond interchanges, while the latter is a single-point urban interchange (SPUI). Although also grade-separated, the Centenary Avenue interchange is controlled by traffic lights on the westbound side of the highway.
LGA | Location | km | mi | Destinations | Notes |
---|---|---|---|---|---|
Airport Drive northeastbound to Perth Airport terminals T1/T2 | |||||
Cloverdale, Kewdale boundary | 1.40 | 0.87 | Abernethy Road (State Route 55) – Belmont, Hazelmere | Single-point urban interchange, also handles Tonkin northbound to Leach westbound traffic prior to merging to avoid the need for weaving. | |
Belmont–Canning boundary | Kewdale, Welshpool boundary | 3.3 | 2.1 | Orrong Road (State Route 8) – Perth, Burswood, Kalamunda | Signalised diamond interchange. |
Canning | Welshpool | 4.4 | 2.7 | Welshpool Road – East Victoria Park, East Cannington | Roundabout interchange. |
Bentley | 6.1 | 3.8 | Albany Highway (State Route 30) – Perth, Victoria Park, Cannington, Albany | Signalised diamond interchange. | |
Bentley, Wilson boundary | 6.7 | 4.2 | Manning Road (State Route 26) – Manning, Waterford, Cannington | ||
Wilson | 7.8 | 4.8 | Bungaree Road | ||
8.6 | 5.3 | Centenary Avenue – parclo interchange , Leach eastbound free flowing while Leach westbound has a signalised intersection with the Centenary Avenue onramp. All three other ramps are uncontrolled, meeting to the north at a signalised intersection with a bus lane priority arrangement in place. | |||
Canning River | 8.8– 9.1 | 5.5– 5.7 | Shelley Bridge | ||
Canning | Shelley | 10.1 | 6.3 | Barbican Street West west / Vahland Avenue south – Willetton, Leeming | |
Riverton, Shelley, Willetton tripoint | 11.7 | 7.3 | High Road (State Route 27) – Parkwood, Lynwood | ||
Rossmoyne, Willetton boundary | 12.4 | 7.7 | Karel Avenue – Bull Creek, Leeming, Jandakot Airport | ||
Canning–Melville boundary | Rossmoyne, Bull Creek boundary | 13.0 | 8.1 | Webb Street | |
Melville | Brentwood, Bull Creek boundary | 13.8 | 8.6 | Bull Creek Drive | |
Brentwood– Joondalup, Rockingham | National Route 1 eastern concurrency terminus; modified Parclo interchange with Leach westbound to Kwinana northbound and Leach eastbound to Kwinana southbound looped: access to Bull Creek railway station | ||||
Brentwood–Bateman boundary | 15.0 | 9.3 | Moolyeen Road – Mount Pleasant, Applecross | ||
Booragoon–Winthrop tripoint | 15.3 | 9.5 | Murdoch Drive – Murdoch, Murdoch University | ||
Booragoon–Winthrop boundary | 16.0 | 9.9 | Riseley Street – Ardross | ||
17.0 | 10.6 | Winthrop Drive – Kardinya | |||
Myaree–Winthrop boundary | 17.3 | 10.7 | Norma Road | No right turn from Norma Road to Leach Highway westbound | |
Myaree–Winthrop–Willagee tripoint | 17.9 | 11.1 | North Lake Road – Alfred Cove, Kardinya, Cockburn Central | ||
Melville–Palmyra–Willagee boundary | 20.0 | 12.4 | Stock Road (National Route 1) – Attadale, O'Connor, Rockingham | National Route 1 western concurrency terminus | |
Melville–Fremantle boundary | Palmyra–Fremantle boundary | 21.4 | 13.3 | Carrington Street – Bicton, White Gum Valley, Hamilton Hill | Leach Highway westbound terminus, continues as High Street (State Route 7) to Fremantle |
|
See also
- Highways in Australia
- Highways in Western Australia
- Freeways in Australia
- Freeways in Western Australia
References
- ^ "High Street Upgrading Study" (PDF). Estill and Associates. Retrieved 13 September 2014.
- ^ Australian TransportSeptember 1978 page 30
- ^ a b Lester Durbin (October 2004), "History of Riverton Bridge" (PDF), Wilson Residents & Ratepayers' Association Newsletter, Wilson Residents & Ratepayers' Association, p. 3, retrieved 13 September 2014
- ^ Wyatt, Ben. "Ben Wyatt's Newsletter 2007" (PDF). Archived from the original (PDF) on 16 December 2018. Retrieved 16 December 2018.
- ^ a b "Gateway WA - Project Master Plan" (PDF). Gateway Vision. April 2012. Retrieved 13 September 2014.
- ^ Corlett, Aaron (23 February 2018). "Anthony Albanese pledges $46.5m for Leach Highway-Welshpool Road overpass if Labor elected". Canning Times. Community News. Retrieved 16 December 2018.
- ^ "Leach Highway & Welshpool Road Intersection Upgrade".
- ^ "Leach Highway (Welshpool Road) Interchange" (PDF). Australian Government. Archived from the original (PDF) on 16 December 2018. Retrieved 16 December 2018.
Further reading
- Edmonds, Leigh (1997). The vital link: a history of Main Roads Western Australia 1926-1996. Nedlands, Western Australia: University of Western Australia Press. ISBN 1-875560-87-4.
- StreetSmart Perth 2003 Street Directory. Midland, Western Australia: Department of Land Administration and West Australian Newspapers Ltd. 2002. ISBN 0-909699-87-9.
- Main Roads WA, Gateway WA Project Master Plan, Page 7