Nowergup railway depot

Coordinates: 31°39′31″S 115°43′40″E / 31.6586°S 115.7277°E / -31.6586; 115.7277
Source: Wikipedia, the free encyclopedia.

Nowergup railway depot
Location
Location
Mandurah
lines

Nowergup railway depot is a

Transperth depot in the suburb of Nowergup, Western Australia. It is situated in the median of the Mitchell Freeway between the Lukin Drive and Hester Avenue
interchanges.

History

Nowergup depot was built to service the

Alstom Transport as part of its contract to maintain the B-series trains.[1]

The depot was completed on 17 May 2004 and officially opened on 13 June 2004 by

Joondalup line beyond its then terminus of Clarkson. The line has since been extended to Butler with the track duplicated.[5]

The depot is currently the base for

Mandurah lines. It is capable of holding 47 of the 3-car trains.[6]

References

  1. ^ Railcar contract seals railway commitment Archived 18 January 2022 at the Wayback Machine Minister for Planning & Infrastructure 12 May 2002
  2. ^ Nowergup Railcar Depot Public Transport Authority
  3. ^ First railcars arrive at new Nowergup train depot Archived 10 February 2023 at the Wayback Machine Minister for planning & Infrastructure 13 June 2004
  4. ^ Metro Rail on track on time ABC News 13 June 2004
  5. ^ "Perth's Joondalup Railway to be Extended". Railway-Technology.com. 30 November 2009.
  6. ^ Brookfield Rail and PTA in talks Echo Newspapers 9 January 2015