Ramwadi metro station
The topic of this article may not meet Wikipedia's general notability guideline. (March 2024) |
Ramwadi | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Elevated, Double track | |||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | RUC | ||||||||||
History | |||||||||||
Opened | 6 March 2024 | ||||||||||
Electrified | 25 kV 50 Hz AC overhead catenary | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Ramwadi is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It is connected to Rainbow Bus Rapid Transit System. The station was opened on 6 March 2024 as an extension of Pune Metro Phase I.[1] Aqua Line operates between Vanaz and Ramwadi stations.[2][3]
Station layout
Bund Garden track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Train Terminates Here | |
Platform 2 Westbound |
Towards ← Vanaz next station is Kalyani Nagar | |
Side platform | Doors will open on the left | ||
L3 |
Entry/Exit
This section is empty. You can help by adding to it. (March 2024) |
See also
References
- ^ "PM Modi inaugurates Pune Metro route extension; these three new stations will be operational from today". The Indian Express. 6 March 2024. Retrieved 7 March 2024.
- ISSN 0971-8257. Retrieved 7 March 2024.
- ^ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times. Retrieved 4 August 2023.