Sibiu–Bacău Motorway
A13 motorway | ||
---|---|---|
Route information | ||
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România | ||
Length | 0 km (0 mi; 0 ft) 68 km (42 mi) under construction 282 km (175 mi) (planned length) | |
Major junctions | ||
From | A 1 near Boița | |
A 3 near Făgăraș A 3 near Brașov | ||
To | A 7 near Răcăciuni | |
Location | ||
Country | Romania | |
Highway system | ||
|
The Sibiu–Brașov–Bacău Motorway (
History and status
Boița – Făgăraș – Brașov sections
From Boița (junction with A1), it will follow the
east of Făgăraș, with which it intersects until west of Brașov, where there's another junction with A3. The Făgăraș – Brașov section will be shared with A3 motorway.This 120 km (75 mi) long section was initially planned as an
The feasibility study and the technical project for the Boița – Făgăraș section (68.05 km (42.28 mi)) were approved in December 2021 and January 2022, respectively.[6] The total value of the investment was estimated at 7.5 billion RON.[6]
On 5 May 2023, the auction of the lot 4 (16.26 km (10.10 mi)) of the Boița - Făgăraș section of the motorway was won by the Turkish association Makyol - Yapi. The total term length is 48 months, (12 months for the project stage and 36 months for the execution stage).[7]
On 20 September 2023, the contract for the design and execution of the lot 3 (17.61 km (10.94 mi)) was signed with the same association Makyol - Yapi.[8]
Brașov – Răcăciuni section
From Brașov, the motorway will cross through the plains of the
This 162 km (101 mi) long section is also the most difficult section to build, as it crosses the Carpathians, with an estimated construction cost of over €2 billion.[11] The contract for the feasibility study and the technical project of this section of the motorway was signed in May 2020,[12] but the inability of Search Corporation (with whom the contract was signed) to cover the costs of geotechnical studies resulted in a termination of the contract in June 2022.[13]
See also
References
- ^ a b http://media.hotnews.ro/media_server1/document-2014-10-1-18214311-0-sinteza-oficiala-masterplanului-general-transport.pdf [bare URL PDF]
- ^ "Studii de Fezabilitate Drum Expres Sibiu–Făgăraş" (in Romanian). Archived from the original on 30 December 2013. Retrieved 20 December 2013.
- ^ "Trans-European Transport Networks - Priority Project 7". European Commission. Archived from the original on 7 January 2014. Retrieved 2 January 2014.
- ^ "Guvernul a scos autostrada Sibiu-Piteşti de pe harta investiţiilor în infrastructură pe următorii cinci ani" (in Romanian). Retrieved 28 December 2013.
- ^ "Când se face autostrada Sibiu – Brașov. Până în august se reface studiul de fezabilitate".
- ^ a b "Cum avansează proiectul Autostrăzii Sibiu – Făgăraş" (in Romanian). adevarul.ro. 27 January 2022. Retrieved 30 January 2022.
- ^ "Autostrada Sibiu - Făgăraș: Primul câștigător, asocierea Makyol - Yapi, pe tronsonul 4". Economica.net (in Romanian). 2023-05-05. Retrieved 2023-05-09.
- ^ "Încă un lot atribuit aceluiași constructor din Turcia cu care s-au semnat deja primele două tronsoane" [Another lot assigned to the same constructor from Turkey with which the first two lots have already been signed]. hotnews.ro. 22 September 2023.
- ^ Ivancea: CNAIR a ales pentru autostrada A13 Bacău-Brașov varianta cea mai scurtă, ieftină şi prietenoasă cu mediul
- ^ Ivancea propune CNAIR două variante de traseu pentru autostrada A13 Bacău – Brașov
- ^ Licitaţie atribuită pentru autostrada Braşov-Bacău
- ^ CNAIR a semnat vineri contractul pentru studiul de fezabilitate și proiectul tehnic
- ^ "Lovitură pentru A13! Search Corporation a cerut rezilierea contractului pentru proiectarea Autostrăzii Brașov-Bacău". Ziarul de Bacău (in Romanian). 2022-06-16. Retrieved 2022-07-24.