Yanqing railway station
Yanqing 延庆 Yanqing District, Beijing China | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Line(s) |
| ||||||||||
Platforms | 3 (1 island platform, 2 side platforms) | ||||||||||
Other information | |||||||||||
Station code |
| ||||||||||
History | |||||||||||
Opened | 29 November 1983 (old station hall) 1 December 2020[1] (new station hall) | ||||||||||
Services | |||||||||||
|
Yanqing railway station (simplified Chinese: 延庆站; traditional Chinese: 延慶站; pinyin: Yánqìng zhàn) is the terminus of the Yanqing branch of the Line S2 of the Beijing Suburban Railway. Yanqing railway station was used as a freight station since 1983, and in 2003 it closed due to the fall of shipments. In 2008, the station finished its first renovation and resumed passenger services. From 2019, a new station hall began construction for the coming Winter Olympics. Since 1 December 2020, The new station hall as well as Yanqing branch of Beijing–Zhangjiakou intercity railway begin serve the station.[1]
Design
Yanqing railway station has been expanded for several major events hosted by
Services and Structure
The station contains a concourse, an integrated service center, ticket vending machines, a convenience store and two check-in gates. Outside the new station hall is Yanqing integrated transportation hub include a visitors service center, a bus terminus, charging stations, and parking lots for vehicles and sharing bicycles. In December 2020, 5 pairs of high-speed trains and 3 pairs of Line S2 trains serve here.[5]
Mezzanine | Business floor (not yet open) | ||
1F | side platform, open left doors | ||
Platform 4 | Badaling Great Wall )→
|
||
Platform 3 | Badaling Great Wall )→
|
||
island platform | |||
Platform 2 | Badaling Great Wall )→
| ||
Platform 1 | Badaling Great Wall )→
| ||
side platform,open right doors | |||
Integrated service center, security check, washrooms, waiting hall, Check-in Gate 1 (for intercity train), Check-in Gate 2 (for S2), north square (Yanqing public transportation hub), | |||
GF | underpass, exit, visitors service center, bus terminus, taxi stands |
References
- ^ a b "京张高铁延庆支线今晨通车 清河到延庆只用26分钟". 2020-12-01.
- ^ "千龙网--千龙原创--[新活法·精彩故事]延庆8000农民变身园林工". Archived from the original on 2015-09-25. Retrieved 2015-10-13.
- ^ "京张高铁今年全线开工 计划在2019年完工_新闻_腾讯网".
- ^ Yanqing transportation bureau. "Introduction to the Yanqing integrated transportation hub (Interchange center)".
- ^ "【S2线延庆站12月1日恢复运营】你怀念的,总会重逢". 2020-11-30.