Bommanahalli metro station

Coordinates: 12°54′38″N 77°37′36″E / 12.91066°N 77.62657°E / 12.91066; 77.62657
Source: Wikipedia, the free encyclopedia.

Bommanahalli
Elevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningNovember 2024; 5 months' time (November 2024) (TBC)
Electrified750 V DC third rail (TBC)
Services
Preceding station Namma Metro Following station
Central Silk Board Yellow Line
(Operational around November 2024)
Hongasandra
towards Bommasandra
Location
Map

Bommanahalli (also known as Roopena Agrahara) is an upcoming elevated metro station on the north–south corridor of the Yellow Line of Namma Metro in Bangalore, India.

As per latest reports, the

Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [1][2][3][4][5]

Station layout

Station Layout (TBC)

Bommanahalli track layout (TBC)
P1
P2
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is Hongasandra
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Central Silk Board Change at the next station for Blue Line
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

  1. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  2. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  3. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  4. ISSN 0971-8257
    . Retrieved 11 November 2023.
  5. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.

External links