Chengshousi station
Coordinates | 39°50′45″N 116°26′51″E / 39.8459°N 116.4475°E | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 10 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2012 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Chengshousi station
Station layout
The station has an underground island platform.
Exits
There are 4 exits, lettered A, B, C1, and C2. Exit A is accessible.
References
- ^ "Jpg格式线路图下载 | 北京地铁官方网站".
- ^ "北京造价网". Archived from the original on 2014-11-01. Retrieved 2013-01-03.
- ^ "北京分钟寺到石榴庄公交线路,北京石榴庄到分钟寺公交线路,公交车,公交站点查询,北京分钟寺到石榴庄怎么走,乘几路车,北京石榴庄到分钟寺怎么走,乘几路车". Archived from the original on 2014-04-16. Retrieved 2012-11-21.
- ^ "四条地铁新线12月28日同步开通(图)_网易新闻中心". Archived from the original on 2016-03-04. Retrieved 2012-11-21.