EMD F125

Source: Wikipedia, the free encyclopedia.

EMD F125
Factor of adh.
4.014
Brakeforce47,200 lbf (210 kN) from 20 mph (32 km/h) to 1 mph (1.6 km/h)
Career
OperatorsMetrolink (California)
Number in class40
Numbers903–942
NicknamesSpirit
[2]

The EMD F125 "Spirit" is a four-axle passenger

Caterpillar C175-20 V20 diesel engine rated at 4,700 hp (3,500 kW). The locomotive is capable of traveling at a maximum in-service speed of 125 mph (201 km/h) pulling consists of up to 10 cars. It was EMD's first new passenger locomotive for the North American market in 15 years, with the most recent predecessor passenger locomotive being the EMD DE30AC and DM30AC built for the Long Island Rail Road. So far, Metrolink
is the only customer of the F125.

Features of the F125 include

History

Upland, CA
, December 2023.

The Los Angeles commuter rail agency Metrolink was the launch customer for the EMD F125, with an order for 40.[3] The cost of the base order of 10 units with an option of additional 10 was estimated at $150 million, with delivery commencing in 2016.[4][5] The base order was signed on May 31, 2013, for 10 locomotives with an option for additional 10, which has since been exercised.[6][7] Additional orders were exercised as funding became available. They replaced the EMD F59PH and F59PHI.

The first locomotive began testing in the first quarter of 2016 and was shown to the public on July 18, 2016, at Los Angeles Union Station during a special event,[8][9] and had its first mainline run on June 10, 2017.

The bulk of the order was expected to be delivered by April 2017, but major problems with the locomotives had prevented their full acceptance by Metrolink.[10][11] In November 2018, Metrolink announced that only five locomotives had been accepted, and the project was two years behind schedule.[12] As of 2022, all F125 locomotives had been delivered to Metrolink and placed in service.[citation needed]

The F125 competes with other Tier 4 compliant locomotives, such as the Siemens Charger series and the MPI MPXpress MP54AC. Both the F125 and MP54AC have struggled to find customers, unlike the Charger series, which has sold more than 350 units including large orders from Amtrak and Via Rail.

References

  1. Caterpillar
    . 2014. Retrieved May 4, 2021.
  2. ^ a b "Locomotive Capacities and Specifications". EMD. Retrieved June 16, 2017.
  3. ^ "EMD reenters passenger market". Trains. April 2016. p. 18.
  4. ^ Bowen, Douglas John (December 20, 2012). "EMD gets Metrolink Tier 4 locomotive order". Railway Age. Retrieved May 27, 2016.
  5. ^ "Metrolink to buy newest, cleanest locomotives" (Press release). Los Angeles: Metrolink. December 18, 2012. Archived from the original on December 21, 2012. Retrieved December 22, 2012.
  6. ^ "Metrolink orders EMD passenger locomotives". Railway Gazette International. June 1, 2013.
  7. ^ "Metrolink receives critical funding commitments for low-emission Tier 4 locomotives" (Press release). Los Angeles: Metrolink. February 10, 2014. Archived from the original on September 6, 2017. Retrieved August 1, 2014.
  8. ^ Templeton, Dan (July 19, 2016). "Metrolink F125 locomotive unveiled in Los Angeles". International Railway Journal. Retrieved December 4, 2017.
  9. ^ "First Metrolink F125 locomotive unveiled in Los Angeles". Railway Age. July 19, 2016. Archived from the original on November 4, 2019.
  10. ^ Jeon, Yena (January 24, 2014). "F125 Tier-4 EMD Status Report". Metrolink. Retrieved May 27, 2016.
  11. ^ "First Metrolink Tier 4 locomotive completed" (Press release). Los Angeles: Metrolink. January 29, 2016. Archived from the original on July 7, 2017. Retrieved February 1, 2016.
  12. ^ "Tier 4 Locomotive Update and Delivery Status". June 8, 2020. Retrieved June 29, 2020.

External links