JS Harusame
History | |
---|---|
![]() | |
Name |
|
Namesake | Harusame (1959) |
Ordered | 1992 |
Builder | Mitsui, Tamano |
Laid down | 11 August 1994 |
Launched | 16 October 1995 |
Commissioned | 24 March 1997 |
Homeport | Sasebo |
Identification |
|
Status | Active |
General characteristics | |
Class and type | Murasame-class destroyer |
Displacement |
|
Length | 151 m (495 ft 5 in) |
Beam | 17.4 m (57 ft 1 in) |
Draft | 5.2 m (17 ft 1 in) |
Propulsion | |
Speed | 30 knots (56 km/h; 35 mph) |
Complement | 165 |
Sensors and processing systems | |
Electronic warfare & decoys | |
Armament |
|
Aircraft carried | 1 × SH-60J/K anti-submarine helicopter |
JS Harusame (DD-102) is the second ship of Murasame-class destroyers. She was commissioned on 24 March 1997.[1]
Design
The hull design was completely renovated from first-generation destroyers. In addition to increasing the size in order to reduce the underwater radiation noise, both
The engine arrangement is COGAG as same as Asagiri class, but a pair of engines are updated to Spey SM1C. And the remaining one pair are replaced by LM2500, same as Kongō class.[2]
Construction and career
Harusame was
From 17 to 29 September and 15 October to 23 October 2019, Japan-Australia joint training (Japan-Australia Trident) was held in the sea and airspace from the south of Kanto to the west of Kyushu via the area around Okinawa. In addition to Harusame the escort vessels JS Teruzuki, JS Asahi, JS Atago, the supply ship JS Mashū and P-1 patrol aircraft or P-3C patrol aircraft and submarines, and ships from the Royal Australian Navy participated.[3] On 24 November, the same year, she departed from Sasebo for the Gulf of Aden off the coast of Somalia as the 35th Expeditionary Piracy Action Water Corps. Due to the fact that some members of the ship completed their mission in late May 2020 and developed symptoms of suspected acute cholecystitis or acute cholangitis on their way back to Japan, they planned to return to Japan on 20 June, one day earlier. The vessel returned to port on 19 June.[4][5]
On 22 May 2022, Harusame departed Sasebo for the Gulf of Aden as the 42nd Deployment Surface for Counter Piracy Enforcement. The vessel relieved JS Samidare.[6]
Gallery
-
JS Harusame off Hawaii on 2 August 1998.
-
JS Harusame underway on 23 March 2006.
-
JS Harusame refueling with JS Tokiwa on 29 October 2006.
-
JS Harusame at Yokosuka on 1 January 2009.
-
JS Harusame at Yokosuka 7 August 2010.
-
JS Harusame underway on 23 June 2011.
-
JS Harusame at the Sagami Bay, Japan on 11 October 2012.
Citations
- ^ "DD-101 Murasame Class". www.globalsecurity.org. Retrieved 1 November 2020.
- ^ a b Abe 2000, pp. 152–157.
- ^ "日豪共同訓練(日豪トライデント)の実施について" (PDF) (Press release) (in Japanese). Japan Maritime Self-Defence Force. Retrieved 25 October 2022.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 9 June 2020. Retrieved 1 November 2020.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Archived copy" (PDF). Archived from the original (PDF) on 19 June 2020. Retrieved 1 November 2020.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Chinese Carrier Strike Group Now Operating in East China Sea". 23 May 2022.
References
- Abe, Yasuo (July 2000). "History of JMSDF Destroyers". Ships of the World (in Japanese) (571). Kaijinn-sha. NAID 40002155847.
- Saunders, Stephen. IHS Jane's Fighting Ships 2013-2014. Jane's Information Group (2003). ISBN 0710630484
- Heihachiro Fujiki (August 2003). "Development of multi-purpose DDs for "8-8 escort flotilla". Ships of the World (in Japanese) (614). Kaijinn-sha: 94–99.