North Line, Chennai Suburban
Southern Railway (India) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Daily ridership | 120,000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 210 kilometres (130 mi) (82 km Suburban and 128 km MEMU) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | Broad Gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 90 km/h (maximum service speed) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The North Line of the
Sections
Chennai Central MMC - Gummidipoondi
- Suburban trains; runs on two dedicated 3rd and 4th lines between Chennai Central - Athipattu (0 - 22 km) .
- Suburban trains; runs on two main lines from Athipattu to Gummidipoondi (22 km - 46 km).
Problems in the north line
Commuters on the Chennai Central-Gummidipoondi suburban line are concerned about irregular train services, poor maintenance and lack of amenities such as drinking water, public convenience and security in the stations.[citation needed] They feel that the services and amenities provided on the Chennai Central-Thiruvallur-Arakkonam and the Chennai Beach-Tambaram-Chengalpattu sections are much better.
Trains are scheduled to transit between Gummidipoondi and Chennai Central in 80 minutes, but trains they usually take 120 minutes to cover the 46 kilometres (29 mi). It is common for trains to wait for clearance at signals between Ennore-Chennai Central.[3] All the trains are always late by 20 to 30 minutes.
Gummidipoondi - Sulurpeta (AP)
- Suburban trains; runs on two main lines.
Sulurpeta(AP) - Bitragunta (AP)
- MEMU trains run between Chennai Central MMC and Nellore to be extended to Bitragunta.
- Passenger trains run between Chennai Central MMC and Bitragunta via Nellore.
Expansion
The third and fourth lines in the route is being laid at a cost of ₹ 2,750 million. The memorandum of understanding (MoU) for exchange of land between the Southern Railways and Chennai Port Trust was signed in 2015 to commission the third and fourth lines. The fourth line between Chennai Beach and Athipattu costs ₹ 1200 million running to a length of 22.1 km. The third line between Athipattu and Korukkupet was commissioned at a cost of ₹ 1,550 million, running for a length of 18 km and the fourth line in the section between Tiruvottiyur and Ennore for a length of 7 km was commissioned on 24 June 2017. The third line between Chennai Beach and Korukkupet will run for a length of 4.1 km at a cost of ₹ 1,420 million and is expected to be completed by March 2018.[2]
References
- ^ Ayyappan, V. (7 May 2013). "Trains late, people backtrack". The Times of India. Chennai. Archived from the original on 6 June 2013. Retrieved 12 May 2012.
- ^ a b Srikanth, R. (27 June 2017). "Poor public transport leaves them on slow lane". The Hindu. Chennai. Retrieved 2 July 2017.
- ^ "Suburban railway stations need more facilities". The Hindu. 7 March 2011. Archived from the original on 10 March 2011.