Pont Briwet refers to the road and railway bridges that cross the River Dwyryd, near Penrhyndeudraeth, Gwynedd in North Wales. The first bridge was a Victorian road and railway viaduct that was constructed entirely from timber by the Cambrian Railways company.[1] Although it was recognised as being a Grade II listed structure, a result of it being an increasingly rare example of a surviving 19th-century wooden road and railway viaduct, the condition of the bridge had deteriorated over time and by the 21st century was posing regular and considerable inconvenience to both road and rail traffic.
Due to the operational impact of the old bridge, it was decided to build a replacement structure alongside as a joint project between the
The new Pont Briwet crosses the Dwyryd on the same alignment as the original structure but it is both stronger and wider to accommodate larger vehicles and traffic volume. It also accommodates a combined cycle path and pedestrian walkway, as well as carrying multiple utilities, such as water and electricity, across its structure. Progress on the new bridge's construction was subject to several delays, the impact of which having been compounded by the necessity of the old structure's closure prior to its completion. It was initially opened only to rail traffic during September 2014; during July 2015, the new bridge was opened to road traffic as well.
History
Victorian bridge
- Origins
Prior to the construction of Pont Briwet, the issue of traversing the estuaries at
The company's selected route, which became commonly known as the
During February 1866, the construction of the bridge was dealt a major setback when the contractor responsible for building it, Thomas Savin, was declared
- Design
The original Pont Briwet was a timber pile viaduct, which were a commonplace feature of coastal railways during this era, being relatively cheap and flexible structures in comparison to the common alternatives.[3][2] It accommodated both a single track for rail traffic as well as a single lane of roadway for a toll road. Although the bridge was decked with timber planks, the road carriageway was waterproofed with a metalled surface.[3] The deck was carried upon 22 equal spans, which were evenly spaced at intervals of 5.8 metres. The bridge was furnished with substantial battered abutments, composed of rough blocks of slate that were in excess of 40 metres in terms of length.[3]
The piers of the bridge comprised either four or five timber
- Operational life
During 1932, the bridge was extensively rebuilt by the Great Western Railway (GWR) company, into which Cambrian Railways had been amalgamated during the 1920s. During this work, half of the wooden piles were replaced with new creosoted pitch pine; it is believed that in excess of 183 tonnes of timber were removed during the replacement process.[3] Additional changes made to the structure also included alterations to the cross members and bracings. As a consequence of this work, the overall width of the bridge was increased to 8.5 m (28 ft).[3]
A less popular practice of Pont Briwet was the toll that was in place for road vehicles.
Reportedly, the bridge and line benefited heavily from the freight traffic generated after the establishment of Cooke's explosives factory near Penrhyndeudraeth during 1872.[2]
By 2010, a speed limit of 20 mph (32 km/h) had been imposed on all trains crossing the bridge. Additionally, in terms of road vehicles, the structure could only accommodate single-file traffic, serving both directions of traffic by alternating between the two.
Replacement
Pont Briwet (2) | |
---|---|
A4085 | |
Crosses | River Dwyryd |
Locale | Penrhyndeudraeth, Gwynedd North Wales |
Characteristics | |
Pier construction | concrete, steel |
Width | 18 m (59 ft) (completed) |
Piers in water | 6 |
History | |
Opened | 2014 (rail) 2015 (road) |
Replaces | Victorian wooden viaduct |
Location | |
- Planning
During July 2010, the
The new Pont Briwet would carry the single-track railway plus a two-lane carriageway and a 2.5 m (8 ft 2 in) combined cycleway and footpath. The road's speed limit would be raised to 40 mph (64 km/h) and toll charges abolished.[10][11] Although the road and rail bridges share the same pillars, like the original viaduct, the superstructures of the new crossings would be separate. Planners also said that, apart from a four-week period in which work would be undertaken to relocate electrical cabling, the old viaduct would remain open throughout the works.[12]
- Design and Construction
During March 2013, work commenced upon the construction of the new bridge.
The 'design and build' contract was awarded to Hochtief and Hewson Consulting acted as their lead consultant for the multi-disciplinary design team. The design of the replacement bridge features the extensive use of the innovative precasting technique which accelerated the construction activities and minimised the disruption to surrounding watercourse.[citation needed]
- Completion
On 1 September 2014, the new rail viaduct was opened for services between Harlech and Pwllheli.[19] However, work continued into the following year on the accompanying roadway; progress on its construction had been delayed by difficulty in the relocation of electricity cables and a water main that previously crossed the old bridge. After two years of work and some significant delays, the road crossing was finally opened to traffic in the summer of 2015.[20][21]
See also
- List of bridges in Wales
- River Mawddach
- Traeth Mawr, The Cob embankment was once another privatised road and rail crossing near Porthmadog
- Ffestiniog Railway
References
Citations
- ^ Baugham, P. E. (1980). A Regional History of the Railways of Great Britain. Vol. XI. London.
- ^ a b c d e f "Pont Briwet." walesher1974.org, GAT Project No. 2144. Report No. 894. October 2010.
- ^ a b c d e f g h i j k l m n “Pont Briwet (1867), site of.” ‘’ engineering-timelines.com’’, Retrieved: 6 June 2018.
- ^ a b c "Pont Briwet, near Penrhyndeudraeth." historypoints.org, Retrieved: 6 June 2018.
- ^ a b "New £20m road and rail bridge plan for Penrhyndeudraeth". BBC Wales News. 12 July 2010. Retrieved 13 July 2010.
- ^ "New Gwynedd Bridge Shortens Path by 10 Miles!" walescoastpath.gov.uk, Retrieved: 6 June 2018.
- ^ "Pont Briwet Road and Rail Bridge." gov.wales.uk, Last updated: 17 May 2016.
- ^ "Pont Briwet, Penrhyndeudraeth." rba.ltd.uk, 31 October 2017.
- ^ "Pont Briwet demolition plans approved by Snowdonia National Park". BBC News. 22 February 2012.
- British Broadcasting Corporation. 15 March 2013. Retrieved 20 January 2014.
- ^ "Wales." notolls.org.uk, Retrieved: 6 June 2018.
- British Broadcasting Corporation. 15 April 2013. Retrieved 20 January 2014.
- ^ "The design and construction of the Pont Briwet Viaduct, UK." Institute of Civil Engineers, Volume 171, Issue 2. June 2018. pp. 80-90.
- ^ "Pont Briwet bridge replacement contract awarded." Rail Technology Magazine, 19 March 13.
- ^ "Railway line closed after work destabilises rail and road crossing in North Wales". Daily Post. 6 November 2013.
- ^ Crump, Eyrl. "Pont Briwet: Buses to replace vital railway link until summer 2014." Daily Post, 31 March 2014.
- British Broadcasting Corporation. 13 January 2014. Retrieved 20 January 2014.
- ^ Milner, Chris (1 January 2014). "Bridge fiasco could close Porthmadog line until 2015". The Railway Magazine. Mortons Media Group. Archived from the original on 18 January 2014. Retrieved 20 January 2014.
- Gwynedd County Council. Archived from the originalon 8 September 2014. Retrieved 8 September 2014.
- North Wales Daily Post. 13 July 2015. Retrieved 19 July 2015.
- ^ Smith, Nicola. "Video: New £20m Pont Briwet bridge officially opens to cars." BBC News, 13 July 2015.