Road–Railway Bridge, Novi Sad

Coordinates: 45°15′41″N 19°51′35″E / 45.261480°N 19.859655°E / 45.261480; 19.859655
Source: Wikipedia, the free encyclopedia.
Road–Railway Bridge
Boško Perošević Bridge

Друмско-железнички мост
Drumsko-železnički most
Мост Бошка Перошевића
Most Boška Peroševića
tracks
1
Track gauge1,435 mm (4 ft 8+12 in)
ElectrifiedYes
History
Opened29 May 2000; 23 years ago (2000-05-29)
Closed1 September 2018; 5 years ago (2018-09-01) (Replaced by New Žeželj Bridge)
Location
Map

The Road–Railway Bridge (Serbian: Друмско-железнички мост, romanizedDrumsko-železnički most) or Boško Perošević Bridge (Serbian: Most Boška Peroševića) was a bridge on the Danube river in Novi Sad, Serbia.

Name

On the proposal of Slobodan Milošević, at the time President of Yugoslavia, the bridge was named after assassinated Serbian politician and the Chairman of the Executive Council of Vojvodina Boško Perošević.[1]

Location

The bridge was constructed next to the location of the old Žeželj Bridge, at the end of Venizelosova street from the side of Novi Sad, connecting to Reljkovićeva street at Petrovaradin.

History

On 29 May 2000, one year after the NATO bombing of Yugoslavia and demolition of all three large bridges over Danube in Novi Sad, the Road–Railway Bridge was opened upstream from the Žeželj Bridge.[1]

The bridge was designed to be a temporary one-lane railway and road bridge, after the demolition of nearby Žeželj Bridge during the 1999 NATO bombing of Yugoslavia.[2]

In October 2018, following the completion of new Žeželj Bridge, dismantling of Boško Perošević Bridge began.[3] As of March 2019, the first phase of bridge dismantling was finished.[4]

Gallery

  • Train on the bridge, September 2006
    Train on the bridge, September 2006
  • Road–Railway Bridge, April 2009
    Road–Railway Bridge, April 2009
  • Road–Railway Bridge, August 2010
    Road–Railway Bridge, August 2010
  • Road–Railway Bridge with water piers, September 2012
    Road–Railway Bridge with water piers, September 2012

See also

References

  1. ^ a b Opranović, B.; Stajić, M. (29 May 2000). "Za obnovu nagrađen februarskom platom" (in Serbian). Retrieved 7 April 2018.
  2. ^ Tucakov, Joza (17 November 2010). "Novi Sad i njegovi rušeni mostovi". b92.net (in Serbian). Politika. Retrieved 7 April 2018.
  3. ^ "Počelo rasklapanje mosta: Umesto 4 godine, odslužio punoletstvo". b92.net (in Serbian). 021.rs. 7 October 2018. Retrieved 7 October 2018.
  4. ^ Polić, Drago (March 2019). "Demontaža privremenog mosta u Novom Sadu koji je potrajao 18 godina". gradnja.rs (in Serbian). Retrieved 29 March 2019.

External links