Srinagar Hydroelectric Project
This article needs additional citations for verification. (June 2015) |
Srinagar Hydro electric Power Project in,
Bharat Heavy Electricals
supplied the major equipments.
Power generation capacity
Its installed capacity is of 330 MW (4x82.5 MW).
Unit Number | Capacity ( MW ) |
Date of Commissioning | Status |
---|---|---|---|
1 | 82.5 | 23 April 2015 | COD.[1] |
2 | 82.5 | 21 June 2015 | COD |
3 | 82.5 | 2 May 2015 | COD |
4 | 82.5 | 21 June 2015 | COD |
TOTAL | 330 |
References
- ^ "BHEL commissions 4th 82.5 MW at Uttarakhand hydel project | NetIndian". Netindian.in. 11 June 2015. Retrieved 27 June 2015.