Stabekk Station
Stabekk | |
---|---|
General information | |
Location | Gamle Drammensvei 36 Stabekk, Bærum Norway |
Coordinates | 59°54′29″N 10°36′25″E / 59.90806°N 10.60694°E |
Elevation | 20.5 m (67 ft) |
Owned by | Bane NOR |
Operated by | Vy |
Line(s) | Drammen Line |
Distance | 8.99 km (5.59 mi) |
Platforms | 1 island platform |
Tracks | 3 |
Connections | Bus: Ruter |
Construction | |
Parking | 120 places |
Accessible | Yes |
Architect | Paul Due |
Other information | |
Fare zone | 1 |
History | |
Opened | 29 May 1884 |
Rebuilt | 1904 14 December 2014 |
Electrified | 30 August 1922 |
Passengers | |
2008 | 600 (daily) |
Location | |
Stabekk Station (
The station opened on 29 May 1884, twelve years after the line was completed. The station building, designed by
. Stabekk was staffed until 1982.History
The Drammen Line past the site of Blommenholm Station opened as a
Private dwellings grew up in the Stabekk area starting in the 1860s and by the 1880s it had grown sufficiently substantial that it could support a train station.[3] By then Høvik Station had opened between Stabekk and Sandvika.[4] The first station at Stabekk was austere with only a simple station building and platform.[2] It was taken into use on 29 May 1884.[4] In 1901 there were 87,655 passengers and in 1911 there were 130,462 passengers traveling to and from Stabekk Station, excluding all commuters with a month pass.[5]
A new station building was erected and completed in 1904,[6] costing 41,000 Norwegian krone (NOK).[5] About twenty people work at the station during the 1910s.[7] The line from Sandvika to Oslo was substantially upgraded between 1917 and 1922. From 27 February 1917 a passing loop was built at Høvik and standard gauge traffic was carried out on the northern track. A southern track was then built, which was used by narrow gauge trains. However, both were dual gauge. All–standard gauge operations commenced on 9 February 1920, although the dual gauge was not removed until 1922. Electric traction started operation on 30 August 1922.[8] An interlocking system was installed on 6 October 1924.[4] Stabekk Station was staffed until 1 December 1982. The line past the station received centralized traffic control and automatic train stop on 3 December 1992.[1]
The opening of the Bærum Tunnel, the second phase of the Asker Line, 26 August 2011, meant that express and regional trains bypassed Stabekk Station all together and run directly from Lysaker to Sandvika. Subsequently, the segment of the Drammen Line between Lysaker and Sandvika was upgrades. To carry out efficient construction work, the segment of track was closed and all trains diverted via the Bærum Tunnel from 7 April 2013 to 13 December 2014.[9]
The work on Stabekk Station was awarded to Implenia and cost NOK 59.5 million. The upgrades include building a new and higher platform, demolishing the old and constructing a new underpass and construction of elevators in connection to the underpass.[10] The upgrades freed up track capacity allowing the number of trains to increase from two to four per direction per hour.[11]
Facilities
Høvik Station is situated on the Drammen Line, 8.99 kilometers (5.59 mi) from Oslo Central Station at an elevation of 20.5 meters (67 ft).[4] The station features three tracks. Access to the trains takes place via an island platform, which has access to two of the tracks. The third track runs closest to the station building. Access to the island platform takes place through an underpass which is equipped with stairs and an elevator. The platforms are 220 meters (720 ft) long and 76 centimeters (30 in) tall, providing universally accessibility. The platform has under-soil heating.[10]
The station building, situated on the north side of the tracks, was designed by Paul Due. The brick structure features a mix of Romance and Gothic styles in the gable and windows in Art Nouveau. The station building is no longer used in conjunction with rail operations and instead used as a dormitory. It is listed as a heritage site.[6] Next to the station building there is parking for 120 cars.[12]
Service
In addition there are two Flytoget trains pr. hour to Oslo Airport Gardermoen.
The station had about 600 passengers per day in 2008.[14]
References
- ^ a b Bjerke & Holom: 189
- ^ a b Sars & Nordheim: 38
- ^ Sars & Nordheim: 41
- ^ a b c d Bjerke & Holom: 192
- ^ a b Sars & Nordheim: 42
- ^ a b Hartmann: 126
- ^ Sars & Nordheim: 46
- ^ Bjerke & Holom: 196
- Norwegian National Rail Administration. Archived from the originalon 2 May 2014. Retrieved 1 May 2014.
- ^ a b "Oppgraderer Stabekk stasjon" (in Norwegian). Byggfakta. 20 March 2014. Retrieved 2 May 2014.
- ^ Svenningssen, Jens (27 April 2014). "Stasjon i ny drakt". Budstikka (in Norwegian). Retrieved 2 May 2014.
- Norwegian National Rail Administration. Retrieved 2 May 2014.
- Norwegian National Rail Administration. 3 December 2012.
- Norwegian National Rail Administration. 1 March 2012. pp. 6–8.
Bibliography
- Bjerke, Thor; Holom, Finn (2004). Banedata 2004 (in Norwegian). Hamar / Oslo: Norsk Jernbanemuseum / Norsk Jernbaneklubb. ISBN 82-90286-28-7.
- Hartmann, Eivind; Mangset, Øistein; Reisegg, Øyvind (1997). Neste stasjon (in Norwegian). Gyldendal. ISBN 82-05-25294-7.
- Sars, Michael; Nordheim, Reidar (1974). Stabekk – En historikk (in Norwegian). Bærum: Vestre Stabekk Vel.
Preceding station | Following station | |||
---|---|---|---|---|
Høvik Strand |
Drammen Line | Lysaker Myra | ||
Preceding station | Regional trains | Following station | ||
— | FLY2 | Stabekk–Oslo Airport | Lysaker | |
Preceding station | Local trains | Following station | ||
Høvik | L1 | Spikkestad–Oslo S–Lillestrøm | Lysaker | |
— | L2 | Stabekk–Oslo S–Ski |