Stuttgart–Wendlingen high-speed railway

Source: Wikipedia, the free encyclopedia.
Stuttgart–Wendlingen high-speed railway
Overview
Native nameNeubaustrecke Stuttgart–Wendlingen
Line number4813
standard gauge
Electrification15 kV/16.7 Hz AC overhead catenary
Operating speed250 km/h (155 mph)
Maximum incline2.8%[2]
Route map

0.0
Stuttgart Hbf
(new deep level station)
0.4
Filder Tunnel (9.468 m)
0.7
Stuttgart Stadtbahn
Stuttgart Stadtbahn
9.9
South portal of Filder Tunnel
0.0 10.4
10.9
1.8 00.0
Filder Station
1.9 00,0
3.1 13.1
Plieningen
(junction)
19.3
20.7
21.3
25.2
Source: German railway atlas[3]

The Stuttgart–Wendlingen high-speed railway is an under construction German high-speed line being built as part of the

Paris-Bratislava corridor
as defined by the European Union.

The line will connect the new Filder station via the Airport Loop, and another line will connect to the existing airport station.

The design speed of the approximately 25.2 km line is mostly 250 km/h (155 mph). As of 2023, it is planned to enter in commercial service in December 2025 (one year delay compared to the expectation from 2017).[4][5][6]

Route

The line runs from Stuttgart station to the south through the 9,468 metre long Filder Tunnel and surface southwest of Stuttgart-Plieningen near Stuttgart Airport and the A8 autobahn. It then runs to the east parallel with the A8 on its north side for about 10 kilometres to the Denkendorf service area. Between Denkendorf and Neuhausen the line runs under the A 8 in a 768 m long Denkendorf Tunnel and then runs parallel with it on its south side to the southeast. On the western abutment of the Neckar Bridge at Wendlingen the line becomes the proposed Wendlingen–Ulm high-speed line.

  • Airport and exhibition centre to Airport loop line, Airport curve and S-Bahn line
    Airport and exhibition centre to Airport loop line, Airport curve and S-Bahn line
  • Schematic track plan in the airport area
    Schematic track plan in the airport area
  • A8 north of Echterdingen looking west: here the new line runs parallel with the autobahn.
    Echterdingen
    looking west: here the new line runs parallel with the autobahn.
  • Prepared subgrade and overpasses near the Stuttgart Trade Fair.
    Prepared
    Stuttgart Trade Fair
    .
  • Exit of the Filder Tunnel with subsequent parallel location to the A8.
    Exit of the Filder Tunnel with subsequent parallel location to the A8.

References

  1. ^ DB Projekt GmbH Stuttgart 21 (ed.): Umgestaltung des Bahnknotens Stuttgart: Ausbau- und Neubaustrecke Stuttgart – Augsburg. Bereich Stuttgart–Wendlingen mit Flughafenanbindung. Planfeststellungsabschnitt 1.2 Fildertunnel. Bau-km 0.432 – km 10,030
    Übersichtshöhenplan Gleisplanung, km 0,432 ... 2,191
    . Plan of November 2001, released on 10 December 2001, Anlage 2.6 of the zoning decision, sheet 1 of 4, plan established by order of the Federal Railway Office, Karlsruhe/Stuttgart branch.
  2. ^ H. Dieterle (1998). "Stuttgart 21 – Ein Jahrhundertprojekt auf dem Weg zur Realisierung" (PDF). Tiefbau (in German) (9): 614–620. Retrieved 6 January 2017.[dead link] Alt URL
  3. .
  4. ^ "Bahnprojekts Stuttgart-Ulm, Projektstatus" (Railway project Stuttgart-Ulm, Project status) on the official website of the project. Accessed on 28 April 2023.
  5. ^ Michael Kröger (29 November 2017). "Stuttgart 21 wird wohl eine Milliarde Euro teurer – und ein Jahr später fertig". Der Spiegel (in German). Retrieved 6 January 2018.
  6. ^ Claus Hecking; Gerald Traufetter (12 December 2017). "Woche der Wahrheit für Stuttgart 21". Der Spiegel (in German). Retrieved 6 January 2018.