Allington Quarry Waste Management Facility

Coordinates: 51°17′34″N 0°29′28″E / 51.2928°N 0.4912°E / 51.2928; 0.4912
Source: Wikipedia, the free encyclopedia.

Allington Quarry Waste Management Facility
Allington Quarry Waste Management Facility in March 2006
Map
Official nameAllington Quarry Waste
Management Facility
CountryEngland
LocationAylesford
Kent
Coordinates51°17′34″N 0°29′28″E / 51.2928°N 0.4912°E / 51.2928; 0.4912
StatusOperational
Commission date2007
Operator(s)Kent Enviropower
Thermal power station
Primary fuelWaste
Power generation
Nameplate capacity
  • 40 MW
External links
CommonsRelated media on Commons

grid reference TQ738578

The Allington Quarry Waste Management Facility is an integrated

incinerator is owned by FCC Environment as Kent Enviropower. The facility, which has involved an investment of over £150 Million, is able to process 500,000 tonnes per annum of waste and has the ability to produce 40MW of power. The facility takes non-hazardous waste from households and businesses in Kent and the surrounding area for recycling and energy recovery
. Materials separated by householders are sorted and sent for recycling, with the remainder being used to generate electricity to power the facility and for the local supply network.

Built in a former

ragstone quarry, the site includes one 80 metres (260 ft) high chimney, and covers an area of 84 acres (34 ha), of which 67 acres (27 ha) will eventually become parkland, and permanently employs around 100 people.[1]

Under a 25-year contract with

Dartford, Gravesham and Swale councils will be processed each year.[1] The centre is a major waste facility and will contribute to Kent meeting its LATS obligations for the diversion of waste from landfill. The incinerator employs fluidized bed
incineration technology and has been in commercial operation since December 2008.