Calgary Central Library
Calgary Central Library | |
---|---|
Alternative names | New Central Library |
General information | |
Type | Public library |
Location | 800 3rd Street SE Calgary, Alberta |
Coordinates | 51°02′43″N 114°03′18″W / 51.0453°N 114.0549°W |
Construction started | 2013 |
Completed | November 1, 2018 |
Cost | $245 million (CAD) |
Owner | Calgary Public Library |
Technical details | |
Floor count | 4 |
Floor area | 22,000 m2 (240,000 sq ft) |
Design and construction | |
Architecture firm | Snøhetta DIALOG |
Developer | Calgary Municipal Land Corporation |
Structural engineer | Entuitive |
Services engineer | SMP Engineering |
Main contractor | Stuart Olson |
Website | |
https://calgarylibrary.ca/ |
The Calgary Central Library, also known as the Calgary New Central Library (NCL), is a public library in Calgary, Alberta, Canada, and the flagship branch of the Calgary Public Library system. The building is located in the Downtown East Village neighborhood and opened on November 1, 2018, replacing an earlier central branch built in the 1960s in Downtown Calgary.
The four-
Planning for a new library began in 2004 and was finalized in 2011. Construction began in 2013 with the encapsulation of an existing CTrain light rail tunnel portal; above-ground construction of the library itself began in September 2015.
Location
The Calgary Central Library is located along 3rd Street SE between 7th and 9th avenues in the
Planning and funding
Planning began in 2004 for a new central library branch in Downtown Calgary to replace the previous structure which had been in use since 1964. The City of Calgary, working with the
Funding for the Calgary Central Library project was budgeted at $245 million, with $175 million contributed by the City of Calgary, $70 million from the Calgary Municipal Land Corporation, a city-owned
Design and amenities
The Calgary Central Library's design was unveiled to the public in September 2014 by architects
The exterior of the Calgary Central Library is wrapped in a textured façade, with translucent fritted glass panels used to shield private study areas and clear glass to make public areas viewable from the outside.[8][9]
The 22,000-square-metre (240,000 sq ft) interior is centered around a four-storey central
The library features several sustainable design features, such as triple-pane windows to save energy on climate control and finishings made of low volatile organic compound materials.[11]
One notable absence from the new library is a connection to Calgary's
Calgary mayor Naheed Nenshi described the library as a "new icon for the city" at the public unveiling of the final design in 2014.[12]
Construction and opening
The first stage of construction was the $25 million encapsulation of a 135-metre (443 ft) section of light rail used by Calgary Transit's Red Line, which emerges from a tunnel under the site.[14] The light rail encapsulation began in May 2014 and was completed in September 2015, allowing for construction of the above ground portion of the Central Library to begin.[15][16]
The Calgary Central Library was opened to the public on November 1, 2018, with Canadian astronaut
Reception
Prior to the Central Library's completion, the design was listed as one of Architectural Digest's twelve most anticipated buildings of 2018.[20][21] The design won a 2020 Architecture Award from the American Institute of Architects,[22] a 2020 American Institute of Architects New York Design Award for outstanding architectural design by American Institute of Architects New York members,[23] and American Institute of Architects, American Library Association and Library Leadership and Management Association 2019 AIA/ALA Library Building Award.[24]
The Society for Experiential Graphic Designs awarded the Central Library with the Global Design Merit Award 2019 for Pathfinding, noting the simple, friendly approach to colours and shapes which provides information to patrons.[25] The Central Library would also win the Canadian Consulting Engineers Award of Excellence and CISC Alberta Steel Design Award for Building Communities, the Association of Consulting Engineering Companies 2019 CCE Award of Excellence, Canadian Architect Award of Merit, and Azure Magazine's Best Canadian Architecture of the Decade.[26][27]
References
- ^ a b c Markusoff, Jason (September 3, 2014). "Design for 'stunning' new central library unveiled". Calgary Herald. Archived from the original on March 10, 2018. Retrieved May 17, 2016.
- ^ a b "New downtown library will not get Plus 15 link to City Hall". CBC News. July 15, 2014. Retrieved May 17, 2016.
- ^ Livesey, Graham. "Music of the Spheres: Studio Bell, home of the National Music Centre, Calgary, Alberta". Canadian Architect. Retrieved September 28, 2023.
- ^ "New library to be built in East Village". CBC News. July 26, 2011. Retrieved May 17, 2016.
- ^ Markusoff, Jason (July 20, 2011). "Where the library isn't going". Calgary Herald. Retrieved May 17, 2016.
- ^ "Project Team and Partners". YYC New Central Library. Calgary Municipal Land Corporation. Archived from the original on May 18, 2016. Retrieved May 17, 2016.
- ^ Markusoff, Jason (September 12, 2013). "Chinese state-owned CNOOC makes largest-ever donation to Calgary Public Library". Calgary Herald. Archived from the original on September 23, 2015. Retrieved May 17, 2016.
- ^ a b "Calgary's New Central Library and Library Plaza". Snøhetta. Retrieved May 17, 2016.
- ^ Rosenfield, Karissa (September 24, 2014). "Snøhetta Unveils Final Design for Calgary's New Central Library". ArchDaily. Retrieved May 17, 2016.
- ^ "Experience the NCL". YYC New Central Library. Calgary Municipal Land Corporation. Archived from the original on May 18, 2016. Retrieved May 17, 2016.
- ^ "New Central Library Newsletter: Fall 2015" (PDF). Calgary Municipal Land Corporation. 2015. Archived from the original (PDF) on January 10, 2018. Retrieved May 17, 2016.
- ^ "Calgary's new central library to be an icon for the city, says Nenshi". CBC News. September 23, 2014. Retrieved May 17, 2016.
- ^ "Project". YYC New Central Library. Calgary Municipal Land Corporation. Archived from the original on May 18, 2016. Retrieved May 17, 2016.
- ^ "Calgary LRT line to be enclosed for central library construction". CBC News. May 7, 2014. Retrieved May 17, 2016.
- ^ "Calgary's new central library will start to rise". CBC News. September 30, 2015. Retrieved May 17, 2016.
- ^ "New Central Library". Calgary Municipal Land Corporation. Retrieved May 30, 2016.
- ^ Ferguson, Eva (November 1, 2018). "'Spectacular': A look inside Calgary's New Central Library on opening day". Calgary Herald. Retrieved November 1, 2018.
- ^ Pike, Helen (November 7, 2018). "Calgary's 'just amazing' Central Library attracts more than 50,000 visitors in 4 days". CBC News. Retrieved November 7, 2018.
- ^ Kaufmann, Bill (November 1, 2018). "'We'll come here regularly': New Central Library makes grand first impression on visitors". Calgary Herald. Retrieved November 1, 2018.
- ^ Rumbolt, Ryan (December 29, 2017). "One Canadian project made Architectural Digest's most anticipated buildings of 2018". CBC News. Retrieved July 24, 2020.
- ^ Mafi, Nick (December 22, 2017). "The 12 Most Anticipated Buildings of 2018". architecturaldigest.com. Architectural Digest. Retrieved July 24, 2020.
- ^ "2020 AIA Awards - Architecture: Calgary Central Library". aia.org. American Institute of Architects. Retrieved July 24, 2020.
- ^ "Calgary Central Library". aiany.org. American Institute of Architects New York. Retrieved July 24, 2020.
- ^ "2019 AIA/ALA Library Building Awards: Calgary's New Central Library". aia.org. American Institute of Architects. Retrieved July 24, 2020.
- ^ "Calgary Central Library: Merit Award 2019". segd.org. Society for Experiential Graphic Designs. March 26, 2019. Retrieved July 24, 2020.
- ^ "Calgary New Central Library". entuitive.com. Entuitive. Retrieved July 24, 2020.
- ^ "Awards and Mentions". calgarylibrary.ca. Calgary Public Library. Retrieved July 24, 2020.
External links
- Official website
- Dialog Design Project Details
- "Calgary Central Public Library". Emporis. Archived from the original on July 24, 2020.