China Railways HXD3

Source: Wikipedia, the free encyclopedia.
HXD3
和谐3型电力机车
People's Republic of China

The HXD3 (

CNR Dalian Locomotives
.

The locomotive is designed for hauling 5,000t freight trains on main lines. It was jointly developed by CNR Dalian Locomotives and Toshiba.

The first prototype (SSJ3-0001) was rolled out from Dalian and underwent testing on the loop track of Beijing CARS in 2004.

Dalian commenced mass production of the locomotive in 2004 with an order of 60 pieces by the

Ministry of Railways
(MOR). The first mass-produced locomotive was rolled out in 2006. MOR later increased the order from 60 to 240, than to 640, and finally to 1040 locomotives.

Most locomotives were allocated on

Jingguang Railway
on freight schedules.

Gallery

  • HXD3-0001
    HXD3-0001
  • HXD3-0484 in Hengshui Railway Station
    HXD3-0484 in Hengshui Railway Station
  • HXD3-0480
    HXD3-0480

External links