Cibitung–Cilincing Toll Road

Source: Wikipedia, the free encyclopedia.
Cibitung-Cilincing Toll Road
Map
Route information
Maintained by PT Cibitung Tanjung Priok Port Tollways (CTP)
Length34 km (21 mi)
Existed2021–present
Major junctions
Southeast endCibitung
Major intersections
Northwest endCilincing
Location
Country
DKI Jakarta
Major cities
Highway system

Cibitung-Cilincing Toll Road is a 34-kilometre-long (21 mi) toll road which extends from Cibitung, West Java, to

Cawang area.[2][3]

History

The toll road consists of four sections. Construction of this toll road has been delayed by eight years due to land acquisition problems. The toll road was expected to be operational by 2019.[4][5] The first section of the toll road has been operating since 31 July 2021,[6] followed by the inaugurations of sections 2 and 3 on 20 September 2022.[7]

Sections

Section

Route

Length

Inauguration Date

Section 1 Cibitung–Telaga Asih 2.96 km (1.84 mi) 31 July 2021
Section 2 Telaga Asih–Tambelang 9.41 km (5.85 mi) 20 September 2022
Section 3 Tambelang–Mekarjaya 13.09 km (8.13 mi)
Section 4 Mekarjaya–Cilincing 8.56 km (5.32 mi) 1 April 2023

Exits

Marunda Toll Gate
ProvinceLocationkmmiExitNameDestinationsNotes
West JavaWest Cikarang, Bekasi Regency0.00.0 Cimanggis–Cibitung Toll Road (Under construction)
0.00.00Cibitung Interchange
2.21.42Telaga Asih Toll Gate
  • Cibitung
  • Telaga Asih
North Tambun, Bekasi Regency12.27.612Gabus Toll Gate
  • North Tambun
  • Tambelang
Small vehicles only
Tarumajaya, Bekasi Regency27.016.827Tarumajaya Toll Gate
  • Tarumajaya
  • Babelan
  • Marunda
28.617.8Marunda Toll Gate
Soekarno-Hatta International Airport

  • Southbound
  • Cakung
  • Bintara
  • Jagorawi Toll Road
  • 1.000 mi = 1.609 km; 1.000 km = 0.621 mi

    See also

    • Trans-Java toll road

    References

    1. ^ "Waskita Pastikan Tol Cibitung-Cilincing Beroperasi Tahun Depan". Kompas. Retrieved October 2, 2018.
    2. ^ "Economy in brief: Cibitung-Cilincing toll-road project to start 2016". The Jakarta Post. Retrieved October 2, 2018.
    3. ^ "Pelindo II to Buy 45% of Cibitung-Cilincing Toll Road". Jakarta Globe. Retrieved October 2, 2018.
    4. ^ "Waskita Karya Kempit 55% Saham Jalan Tol Cibitung-Cilincing". CNN Indonesia. Retrieved October 2, 2018.
    5. ^ "Agar Arus Logistik Lancar, Truk Butuh jalan Tol Baru". Industri.Bisnis.Com. Retrieved October 2, 2018.
    6. ^ "BEROPERASI & BELUM BERTARIF, SEKSI 1 TOL CIBITUNG - CILINCING RUAS CIBITUNG - TELAGA ASIH". bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 31 July 2022. Retrieved 13 October 2022.
    7. ^ "Tingkatkan Mobilitas Logistik, Presiden Jokowi Resmikan Jalan Tol Cibitung-Cilincing dan Tol Serpong-Balaraja Seksi 1" [Improving Logistics Mobility, President Jokowi Inaugurates Cibitung-Cilincing Toll Road and Serpong-Balaraja Toll Road Section 1]. bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 21 September 2022. Retrieved 28 September 2022.

    External links