EMD GM6C
This article relies largely or entirely on a single source. (August 2016) |
EMD GM6C | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||
|
The GM6C was a solitary testbed
Motives
At the time, high oil prices had a number of large US railroads contemplating electrification of their most heavily used lines, while the only major US railroad with freight-hauling electrification, the
Circumstances changed after the GM6C and GM10B locomotives were developed; oil prices declined, which wiped out the interest freight railroads had in electrification, while diesel locomotive power and adhesion were improved.
Meanwhile, the bankruptcy of Penn Central led to the division of the railroad's physical plant between Amtrak, which inherited much of the electrified region, and Conrail. Increased access charges on the part of Amtrak led to Conrail ceasing electric operations in 1982, dismantling the electrification on its lines and avoiding Amtrak-owned rails.[citation needed] The two locomotives were now surplus to requirements and were returned to EMD, remaining in the LaGrange plant's yard until scrapping in the mid-1980s.
The BC Rail GF6C locomotives used similar technology to the GM6C but had a wide-nose cab and carbody.
References
- ISSN 1049-5622