International Container Transshipment Terminal, Kochi

Source: Wikipedia, the free encyclopedia.

International Container Transshipment Terminal
Kochi, Kerala
StatusIn operation
Coordinates09°58′54″N 76°15′09″E / 9.98167°N 76.25250°E / 9.98167; 76.25250
Built byDP World
Opened11 February 2011
Technical details
Cost 3200 crore
No of Super-Post Panamax/Megamax Crane6
No of Rubber Tyred Gantry Crane19
Maximum Draft14.5 m
Quay Length600 m
Terminal Area40 ha
Depth Alongside16 m
Container Yard2500 TEU ground slots
Capacity1 Million TEU's
Rail Tracks2
WebsiteDP World Cochin

The Kochi International Container Transshipment Terminal (ICTT), locally known as the Vallarpadam Terminal, is the first

transshipment terminal in India and the first container terminal to operate in a SEZ.[1][2] It is part of the Cochin Port in Kochi, Ernakulam district, Kerala
.

Being constructed in three stages, the first phase of the terminal was commissioned on 11 Feb 2011.[3] This can handle cargo up to one million TEUs (twenty-foot equivalent units) per annum.[3] On completion of the third phase, the terminal will be able to handle 5.5 million Twenty-foot equivalent units (TEUs) of cargo per annum.[3] The terminal is operated by the Dubai Ports World (DPW), which will operate it for 30-years after which the control will come back to the Cochin Port Trust.[4]

History

Container Transshipment Terminal, Kochi first came to the mind of Dr. Babu Paul IAS, He proposed this project to K Karunakaran but the central government was not interested in this project. On 16 February 2005,

Cochin Port Trust (CoPT) to construct, develop and operate an International Container Transshipment Terminal (ICTT) – An India Gateway Terminal – at Vallarpadam
.

The project was, formally, launched with the laying of the foundation stone by

Cochin Port to the new terminal upon its completion. The DP World
has been granted a 38-year concession for the exclusive operation and management of the site.

Overview

Vallarpadam Terminal is the first in the country to operate in a special economic zone.

  • In the first phase there will be 600 m Quay length and a draft of more than 15 m, when the terminal may handle 1 million TEUs
  • In the second phase the capacity will be enhanced to 3 million TEUs.
  • In the third phase the terminal may handle even up to 5.5 million TEUs.

The total cost of the project is estimated at 3200 crore.

DP World has estimated that the total initial investment required will be approximately US$20 million which includes the immediate provision of four RTGs and two Mobile Harbour Cranes to the Terminal -to improve yard handling, truck turnaround time and quayside operations.

Strategically, located on the main east–west global shipping lines and offering draft of about 16 m,

southern India,[5] as also offering an alternative to Sri Lanka and Singapore
for containers being transshipped for the Indian market.

Location

The terminal is located in the Vallarpadam island in Kochi.

Vallarpadam Church

Opening

On 11 February 2011 the terminal was inaugurated by Manmohan Singh, the Prime Minister of India.[citation needed]

See also

References

  1. ^ "DP World Kochi poised to grow its capacity". Gulf News. 8 February 2016. Retrieved 16 October 2017.
  2. ^ "Tenders for consultants for Colachel port by March". India Today. 17 February 2016. Retrieved 16 October 2017.
  3. ^ a b c "PM inaugurates container terminal in Kerala". The New Indian Express. PTI. 11 February 2011. Archived from the original on 3 March 2014. Retrieved 24 May 2013.
  4. ^ "PM to open Vallarpadam terminal on Feb 11". The New Indian Express. PTI. 6 February 2011. Archived from the original on 3 March 2014. Retrieved 24 May 2013.
  5. ^ "DP World awards Vallarpadam terminal civil works to Simplex". The Economic Times. Retrieved 25 January 2023.