Robin Hood Line
Robin Hood Line | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Owner | Network Rail | ||
Locale | Nottinghamshire Derbyshire East Midlands | ||
Termini |
| ||
Stations | 13 | ||
Service | |||
Type | Heavy rail | ||
System | National Rail | ||
Operator(s) | East Midlands Railway | ||
Rolling stock | Class 158 Express Sprinter
standard gauge | ||
|
Robin Hood Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Robin Hood Line is a railway line running from Nottingham to Worksop, Nottinghamshire, in England. The stations between Shirebrook and Whitwell (inclusive) are in the county of Derbyshire.
Passenger services are operated by East Midlands Railway. The line in its present form opened to passengers in stages between 1993 and 1998. Following the Beeching cuts of the 1960s, the line had been freight-only. The cuts had left Mansfield as one of the largest towns in Britain without a railway station.
History
The majority of the current Robin Hood Line re-uses the former Midland Railway (MR) route from Nottingham to Worksop. However, due to rationalisation leading to track removal in order to save the costs of maintaining the tunnel north of Annesley, the through route was severed in the 1970s.[2]
Northwards from Nottingham, the freight-only line remained intact as far as Newstead, where it had served the now closed Newstead Colliery.[2]
Southwards from Worksop, the line followed the old MR route as far as Sutton-in-Ashfield. Between Sutton-in-Ashfield and Kirkby-in-Ashfield, the line was diverted in 1972 to take the former Great Northern Railway (GNR) route through the area.[3] This allowed British Rail to sell land right in the centre of Kirkby-in-Ashfield whilst keeping a freight route through the town. After crossing the town on the GNR route, the line re-joined the old MR route to Pye Bridge, near Ironville but the connection between Kirkby-in-Ashfield and Newstead was closed and the tunnel filled in.[2]
When plans for the Robin Hood Line were drawn up, it was vital in the interest of keeping costs down to make as much use of the existing infrastructure as possible so, rather than trying to buy back the land to rebuild the line through the centre of Kirkby-in-Ashfield, the existing GNR diversion was kept and a new single track stretch of railway built to re-create the missing link between Kirkby-in-Ashfield and Newstead.[2]
North of Newstead, at Annesley, both the Great Central Railway (GCR) and the Midland Railway had driven tunnels through the picturesque Robin Hood Hills but, since both lines closed, both tunnels had been filled in.[3] The GCR's tunnel had been at a lower level than the MR's and so was much longer. It therefore proved cheaper to re-excavate the MR's tunnel, which was found to be in excellent condition.[2]
The new service from
In 2004, the section between Bulwell and Hucknall has been converted from double track to single track to allow space for the new Nottingham Express Transit tramway; this follows the route as far north as Hucknall and opened in March 2004.[4]
Service
As of March 2020, the Robin Hood Line operates a Monday to Saturday service between 05:40 and 22:20. During the day, trains run at half-hourly intervals between Nottingham and Mansfield Woodhouse, with one service an hour continuing to Worksop, and the full journey taking 67 minutes.[5]
A Sunday service began on 7 December 2008, with ten trains running between Nottingham and Mansfield Woodhouse between 09:15 and 22:30. Four of those continued to Worksop.[6] The Sunday service was funded by Derbyshire County Council and Nottinghamshire County Council. An understanding was made with the Department for Transport that, if the patronage reached an agreed threshold after two years, it would consider taking over the service and incorporate it within the East Midlands Trains franchise. However, this service was not a commercial success north of Mansfield Woodhouse, and Nottinghamshire County Council decided to reduce its funding and prioritise running a reduced Sunday service from 22 May 2011. The service runs eight times each Sunday between Nottingham and Mansfield Woodhouse and return.[5]
Proposed extension
Just north of Shirebrook station is a junction with a freight branch line that was used for coal traffic to High Marnham power station via Warsop, Edwinstowe and Ollerton. Following closure of the power station the line is disused but has been kept open and fully maintained as a test track for driver training.[7] In mid-2009
There are also plans to reinstate passenger trains over the freight-only line from
References
- ^ a b "Robin Hood line history". BBC Nottingham. Archived from the original on 2 December 2017. Retrieved 19 April 2011.
- ^ a b c d e Sisson, Robin (March 2007). "Return to Robin Hood". Today's Railways UK. Vol. 63. Sheffield: Platform 5 Publishing Ltd. pp. 48–55.
- ^ a b
Anderson, P. Howard (1985). Forgotten Railways. Vol. II The East Midlands (2nd ed.). Newton Abbott: David St John Thomas. p. 206. ISBN 0-946537-20-8.
- ^ David 2017, pp. 159–160.
- ^ a b "Train Timetable: Nottingham to Worksop" (PDF). East Midlands Trains. December 2019. Archived from the original (PDF) on 17 March 2020. Retrieved 17 March 2020.
- ^ "Robin Hood Line Sunday Service". Nottinghamshire County Council. December 2008. Archived from the original on 11 October 2008.
- ^ "Hope for Robin Hood branch line". BBC. 9 August 2009. Archived from the original on 17 March 2020. Retrieved 21 February 2010.
- ^ Matthews, Kieran (1 March 2016). "Talks begin to extend Robin Hood rail line and build new stations". Notts TV. Archived from the original on 25 June 2016. Retrieved 17 March 2020.
- ^ David 2017, p. 159.
- ^ "Transport Links: Nottinghamshire, volume 663, column 564WH". Hansard. 23 July 2019.
- ^ Sandeman 2020.
- ^ "National Infrastructure Strategy" (PDF). GOV.UK. HM Treasury. November 2020. p. 41. Retrieved 4 August 2021.
Bibliography
- David, Gareth (2017). Railway Renaissance: Britain's Railways After Beeching. Pen and Sword Transport. ISBN 978-1-4738-6200-5.
- Millar, John (15–28 February 1995). Kelly, Peter (ed.). "Robin Hood marches north". ISSN 0953-4563.
- "Robin Hood Line bridges the final 15-mile gap". OCLC 49953699.
- Sandeman, Kit (24 February 2020). "Plan to reopen Maid Marian train line takes step forward". Nottingham Post.