South Humberside Main Line

Source: Wikipedia, the free encyclopedia.

South Humberside Main Line
standard gauge
Route map

(Click to expand)

The South Humberside Main Line runs from Doncaster on the East Coast Main Line to Thorne where it diverges from the Sheffield to Hull Line. It then runs eastwards to Scunthorpe and the Humber ports of Immingham and Grimsby, with the coastal resort of Cleethorpes as terminus.

Route

From Doncaster the line forms a joint route with the Sheffield–Hull line to

Grimsby railway station. The route then passes Grimsby Docks railway station which is open only during daylight hours, towards Grimsby Docks, and then on to New Clee railway station running along the humber bank/sea wall to Cleethorpes railway station
.

Scunthorpe Railway Station

Passenger Services

The population in station catchments of the line is 470,000.[1]

The

Barton Line
branch.

Northern operate a service between Scunthorpe and Sheffield, calling at intermediate stations.

The Barton Line forms a branch to this line from Ulceby Junction, to

Barton upon Humber
. Passenger services on the line were provided by EMR.

Service patterns

  • One train per hour Northern Rail, Sheffield-Doncaster-Scunthorpe.[1]
  • One train per hour TransPennine Express service, Manchester Airport–Doncaster–Cleethorpes.[1]
  • One train per two hours East Midlands service, Barton-on-Humber–Cleethorpes.[1]
  • One train per two hours East Midlands service, Nottingham–Lincoln–Grimsby Town.[1]

Freight

Imported Coal transported from Immingham passes through Melton Ross

The South Humberside Main Line is one of eight national Seven Day Railway Routes, which target the routes with the strongest business case for investment.[2] The port of Immingham is located at the end of the South Humberside Main Line from Doncaster. This generates around one fifth of the total UK freight tonnage with potential for significantly more.[3] This line is therefore a very important route for freight and extra capacity is needed to allow rail to grow with the port. Humber International Terminal stage 2 was completed in 2006 which has doubled the amount of coal the port can handle.[4]

The route from Doncaster to Immingham via Scunthorpe is a key artery for rail freight services conveying approximately 20% of the total rail freight volume moved in the UK, it includes:[5]

  • Steel to/from Scunthorpe Steelworks which is normally 10 trains per day
  • Waste to Scunthorpe Roxby Gullet which is normally 6 trains per day
  • Coal from Immingham to various Power Stations in the Aire and Trent Valley which is normally 40 trains per day
  • Petroleum from Humber and Lindsey Oil Refineries which is normally 8 trains per day
  • Petrochemical traffic from Immingham to Preston and Stalybridge which is normally 2 trains per day
  • Steel from Immingham to Avesta Works Sheffield (Outokumpu) which is normally 2 trains per day*

Services on the Doncaster to Goole/Hull via Thorne line, which normally amount to eight trains per day, are also affected by these trains.

Totals: 68 freight trains per day, journey each way = 136 paths

There are three tracks between Brocklesby and Wrawby, two in the Doncaster direction and one in the Immingham direction.[3] The line speed also restricts capacity, between Ulceby and Doncaster the line speed is predominantly 55 mph, with Wrawby Junction only 30 mph. The line speed between Immingham and Ulceby is mainly 30 mph. Loaded freight trains generally run at 60 mph on other lines, with some modern unloaded trains being capable of 75 mph.[3]

History

The line was initially part of the Manchester, Sheffield and Lincolnshire Railway until the company changed name to the Great Central Railway in 1897. In 1916 the section of route between Wrawby and Brocklesby was quadrupled to cope with the growing amount of freight traffic heading for the docks at Immingham and Grimsby.

In April 2019, a level crossing over the line at Suggitt's Lane in Cleethorpes was closed due to safety concerns. In 2022, Suggitt's Lane Bridge was opened, replacing the level crossing.[6]

Incidents

  • In February 2013, a spoil heap (from the now closed Hatfield Colliery) that was weakened by rainfall, caused a landslip and pushed the lines and trackbed up into the air. The line was closed for five months, with trains being diverted through Brigg and Market Rasen before it was re-opened in July 2013.[7]
  • 7 August 2015 a freight train derailed at Foreign Ore junction, Santon near Scunthorpe closing the line.[8] A train previously derailed in this area in 2008.[9]

References

  1. ^ a b c d e "Rail North –North of England Electrification Strategy" (PDF). Systra. September 2014. Retrieved 4 March 2015.
  2. ^ "Seven Day Railway: better weekend services for passengers" (PDF). ATOC. Retrieved 12 July 2013.
  3. ^ a b c "Rail freight's Super 16". Freight on Rail. Retrieved 31 January 2013.
  4. . Retrieved 31 January 2013.
  5. ^ "Update on rail repair – Hatfield & Stainforth – 17 May 2013". Network Rail. 17 May 2013. Archived from the original on 14 July 2014. Retrieved 12 July 2013.
  6. ^ "New £3.6m bridge opens at Suggitt's Lane in Cleethorpes". North-East Lincolnshire Council. 18 March 2022. Retrieved 22 March 2022.
  7. ^ "Rail line reopens after landslip". BBC News. 8 July 2013. Retrieved 26 April 2018.
  8. ^ "UPDATE: Train derailed near Scunthorpe - lines blocked". Scunthorpe Telegraph. 7 August 2015. Retrieved 7 August 2015.
  9. ^ "Derailment at Santon near Foreign Ore Branch Junction, Scunthorpe". Rail Accident Investigation Branch. 10 December 2014. Retrieved 7 August 2015.

External links