Rudbar Lorestan Dam
Rudbar Lorestan Dam | ||
---|---|---|
Annual generation 986 GWh (est.)[1] | |
Rudbar Lorestan Dam (
Lorestan Province with an installed electricity generating capability of 450 MW. It was scheduled to become operational in 2013.[2] Finally, the dam was completed on September 15, 2016.[3] The hydroelectric plant consisting of two 225-MW vertical Francis turbine-generator units has begun operating on May 31, 2017.[4]