S Line (Utah Transit Authority)

Route map:
Source: Wikipedia, the free encyclopedia.

S Line
standard gauge
ElectrificationOverhead line750 V DC
Operating speed25 mph (40 km/h)[4]
Route diagram

 701   703   704 
Central Pointe
maintenance connector
South Salt Lake
300 East
500 East
700 East
Utah 71.svg SR-71 / 700 East
Sugarmont
Fairmont

The S Line, or S-Line (formerly known as Sugar House Streetcar), is a public transit streetcar line in northeastern Salt Lake County, Utah, in the United States, that connects the business district of the Sugar House neighborhood of Salt Lake City with the neighboring city of South Salt Lake, as well as the Utah Transit Authority's (UTA) TRAX light rail system.[6] It is a joint project between UTA, Salt Lake City, and South Salt Lake.[7][4] It opened for service on December 8, 2013.[3] It is operated by UTA and is UTA's first streetcar line.[4]

Description

While fairly similar to UTA's TRAX

at-grade road crossings do not have barrier arms that stop vehicular traffic. Instead many streetcar crossings have traffic lights, while several are controlled by stop signs. Accordingly, the streetcars may be required to slow down or even stop prior to crossing roadways. (These road crossing also include crosswalks that parallel the tracks, and pedestrian traffic lights as well.) The fare for the S Line is the same as for TRAX[9] and the same methods of payment (including the FAREPAY card) are accepted.[10]

The S Line utilizes the same

Siemens S70 US cars used by the TRAX Red and Green lines. The decision to use the same car model resulted in substantial savings as it allows UTA to use the same maintenance facilities used for TRAX.[11] However, Mayor Becker suggested that as the S Line evolves (Phase 2 and beyond) the cars used could move "toward a more traditional streetcar design."[12] The cars used for the S Line have a silver and white color scheme,[11] as opposed the red, white, and blue color scheme used by the rest of UTA's vehicles (buses, TRAX trains, and the FrontRunner train). Since the S Line is intended for shorter trips than TRAX it has more standing room and space for bicycles.[12] Each car has a capacity of 60 people.[10] Daily ridership was anticipated to be initially about 2,000 by the year 2030.[13] According to UTA, actual average weekday ridership stands at 1,335 per day.[14]

Most of the corridor for Phase 1 of the S Line includes a

History

The rail line

abandoned the rail line in 2005.[15]

Transportation Investment Generating Economic Recovery
(TIGER) funding. The project was granted $26 million TIGER II funding on October 20, 2010. Construction began on May 9, 2012.

In late August 2013, UTA announced that the streetcar would be called the S Line According to UTA, "The S Line was named in honor of the streetcar’s two founding cities, Salt Lake and South Salt Lake, as well as the Sugar House neighborhood it calls home."

Mayor Ralph Becker stated, "The name both unites the communities, but also the corridor."[4]

The line opened for regular service on December 8, 2013, but free rides were offered the day prior (with a food donation).[3]

Phase 1 of the S Line runs along the old D&RGW line (which lies between 2100 South and

Central Pointe TRAX Station in South Salt Lake to the commercial district of the Sugar House neighborhood of Salt Lake City near Highland Drive (specifically the site of the old Granite Furniture Building or "Granite Block").[17][18] The streetcar plan was developed from an earlier proposal for a heritage trolley line which was begun in 2002. The original idea was reported in the Deseret News on May 16, 2003. However, at that time rail service was not projected to reach Sugar House before the year 2030.[19]

Since most of Phase 1 was built within the existing railway right-of-way, very minimal additional property acquisition was necessary. The integration of the S Line at Central Pointe Station required the addition of a second passenger platform (a side platform) to be built just southeast of the existing island platform for the TRAX lines. Transfer between the two modes of transportation only requires a short walk between the two platforms, but the S Line platform is only accessible from the southern end of the TRAX platform.

Although years in development, the S Line is the first streetcar line to operate in the state of Utah in over 50 years.[11] The initial length of the S Line (Phase 1) was about 2 miles (3.2 km).[4][20] A two-block section of the S Line, between 300 and 500 East, was double-tracked in early 2019 at a cost of $5.9 million to address frequency needs spurred by growing ridership.[21]

Double-tracking

When the S Line opened in December 2013, the line was almost entirely single-tracked, with passing tracks at the 500 East stop where the two cars typically operating on the line could pass each other. This layout enabled 20 minute frequencies on the line. In June 2017 it was announced that Salt Lake County would provide $4.5 million, and the federal government would provide $1.9 million through its Congestion Mitigation and Air Quality Improvement program, to double-track the portion of the S Line from just west of the 300 East stop, through to just east of the 500 East stop, enabling improved 15 minute frequencies on the line. Construction began in June 2018, and was completed in April 2019.[14]

Future plans

S-Line Extension Project

In November 2023, UTA announced that construction on a 1000 foot extension to a new station on Simpson Avenue and Highland Drive.[22] Alongside the extension, double tracking from the 500 East Stop would be extended to just before the 700 East Stop. Construction is set to begin in Spring of 2024, with service beginning around Fall 2025.[23]

Future Extensions

The S Line was planned to be constructed in two phases. As part of a Phase 2, the S Line would extend beyond the

Westminster College. Although there was substantial opposition to this recommended route for Phase 2,[27] the objections were not focused on the initial section of Phase 2 along Highland Drive, but rather the section further north. Many are opposed the route continuing north along 1100 East and would rather see the streetcar continue east along 2100 South.[28] Notwithstanding, city leaders have repeatedly indicated that many of the objections arise because of a lack of understanding regarding the differences between the S Line (streetcar) and TRAX (light rail).[29]
There still remains the possibility of further extensions beyond Phase 2, but none have yet to be specifically identified for official discussion.

Route

The S Line is designated as UTA Route 720.

South Salt Lake

The S Line begins at the

500 East
stop at 2234 South 500 East.

Sugar House (Salt Lake City)

After crossing 500 East, the streetcar leaves South Salt Lake and enters the Sugar House neighborhood of Salt Lake City. The two S Line tracks then merge back to a single set. Continuing east, but now slightly to the north, it crosses 600 East and arrives at the

which is located immediately west of the south end of McClelland Street (1040 East) at 2216 S McClelland Street. The Fairmont stop is also located just north of Fairmont Park and southwest of the Granit Block. Fairmont stop is the last eastbound stop for Phase 1 of the S Line.

From McClelland Street, Sugarmont Drive continues due east to Highland Drive at 1130 East and 2225 South (being one-way, westbound only, between 1100 East and Highland Drive). There is a proposal to realign this section of Sugarmont Drive to curve to the north to connect with Highland Drive at the west end of Wilmington Avenue (about 2190 South).[30] Whether Sugarmont Drive is realigned or not, as part of Phase 2, the S Line will continue east along that street until the streetcar turns north along Highland Drive. Heading north, but slightly to the west, the S Line will run through the commercial district along Highland Drive until it reaches 2100 South. (At about 2150 South, Highland Drive curves from its north-northwest direction to head almost due north.) At East 2100 South, Highland Drive becomes South 1100 East. Heading north along 1100 East, the streetcar will pass by the ends of the following streets: the east end of Hollywood Drive (1970 South), the west end of a section of Ramona Avenue (1930 South), the east end of a section of Ramona Avenue (1910 South), the west end of a section of Westminster Avenue (1880 South), and the west end of East Garfield Avenue (1835 South). North of Ramona Avenue the streetcar leaves the commercial district and 1100 East has intermittent residential housing on both sides of the street. Continuing north along South 1100 East, the S Line will cross Blaine Avenue (1735 South) before reaching the northern border of the Sugar House neighborhood and the end of Phase 2 immediately south of 1700 South. Phase 2 will provide indirect service to Westminster College, the campus of which is just east of the end of this route. (The campus of Westminster College occupies the entire area between 1200 East and 1300 East from 1700 South to 1850 South.)

Streetcar schedule

On weekdays the first eastbound S Line streetcar (to the

Central Pointe Station at 5:12 am and the first westbound car (to the Central Pointe Station) leaves the Fairmont stop at 5:27 am. The last eastbound streetcar leaves Central Pointe Station at 11:27 pm and the last westbound car leaves Fairmont stop at 11:42 pm.[Note 5]

On Saturdays and Sundays, the first eastbound S Line streetcar leaves the Central Pointe Station at 6:02 am and the first westbound car leaves the Fairmont stop at 6:17 am. The last eastbound streetcar leaves Fairmont at 11:47 pm and the last westbound streetcar leaves Fairmont at 11:32 pm.

S Line streetcars run every fifteen minutes every weekday (except holidays when there is no service), and thirty minutes on weekends like the TRAX system, and take about twelve minutes to run the length of the route (of Phase 1).[31]

Stops

Just as UTA calls the vehicles used on this route "streetcars" instead of "trains," the line has "stops" instead of "stations."[1] The difference is mainly in the size of the facilities. Each platform is only 59 feet (18 m) long, just long enough to fit a single Siemens S70US car.[3] Each passenger platform includes a small canopy (not much larger than a standard small bus stop shelter), a ticket vending machine and an electronic card reader (used for charging fares with UTA contactless transit passes or a contactless credit/debit cards by "tapping on" or "tapping off").[32]

Western Terminus
Central Pointe station, the western end of the S Line.
Eastern Terminus
Fairmont station, the eastern end of the S Line
S Line (South Salt Lake–Sugar House)
Stop name Municipality Opening
year
Connections Park and
Ride lot
Notes
Central Pointe
South Salt Lake 2013  701   703   704 
Bus transport 17, 21
57 S Line passenger platform is southeast of (and is only accessible from) the TRAX platform
South Salt Lake City

(Main Street)
Bus transport 200* No
300 East
500 East
Bus transport 205*
700 East
Sugar House, Salt Lake City
Sugarmont
[Note 3]
Bus transport 209*
Fairmont
[Note 4]
Bus transport 213*
*Except for Central Pointe Station, none of the stops have any direct bus connections at the stop itself, but several have bus stops on nearby streets.

See also

Notes

  1. ^ The distinction between the terms streetcar (or tram) and light rail is often blurred and the Wikipedia articles on both terms provide substantial discussion on the matter. In the United States, streetcars are included in (but mostly considered a subcategory of) what is referred to as light rail. However, light rail is distinguished from the term commuter rail.
  2. South Salt Lake City
    stop platform would connect, the secondary tracks only extend to just beyond the edges of the State Street right-of-way and do not connect to anything, yet. Furthermore, it appear that there is sufficient space along most, if not all, of the Phase 1 section to add a second set of tracks and additional passenger platforms, as necessary.
  3. ^ a b The Sugarmont stop was previously called 900 East in the planning stages of the Sugar House Streetcar
  4. ^ a b The Fairmont stop was previously called McClelland in the planning stages of the Sugar House Streetcar
  5. ^ Streetcar schedule is current as of Change Day, April 13, 2014

References

  1. ^
    MediaNews Group
    . Retrieved September 17, 2013.
  2. MediaNews Group
    . Retrieved February 5, 2014.
  3. ^ a b c d "Salt Lake City welcomes S-Line". Railway Gazette International. Sutton, London: Railway Gazette Group. December 9, 2013. Retrieved December 14, 2013.
  4. ^ a b c d e f g Vo-Duc, Viviane (September 5, 2013). "New streetcar S-line set to open Dec. 8 in Sugar House". Deseret News. Salt Lake City: Deseret Digital Media. Retrieved September 17, 2013.
  5. ^ a b "STB Finance Docket No. 34170" (PDF). Surface Transportation Board. May 17, 2002. p. 1. Retrieved August 21, 2009.
  6. ^ "A Western Streetcar System in Salt Lake". Forbes. June 2013. Archived from the original on June 30, 2013. Retrieved June 27, 2013. Construction began last year, and its developers hope the line can go into use late this year.
  7. ^ "Sugar House Streetcar: Background Information". shstreetcar.com. Retrieved April 3, 2013.
  8. ^ "Sugar House Streetcar FAQs" (PDF). shstreetcar.com. Salt Lake City. p. 1. Retrieved April 21, 2012.
  9. ^ "Sugar House Streetcar Unveiled". KUTV. Salt Lake City: Sinclair Broadcast Group. September 6, 2013. Retrieved September 19, 2013.
  10. ^ a b c "SUGAR HOUSE STREETCAR UNVEILED". ABC 4 Utah News. Salt Lake City: Nexstar Media Group. September 5, 2013. Retrieved September 18, 2013. The new streetcar is called the Silver Line.
  11. ^ a b c d e "S Line to open in Sugar House on Dec. 8". rideuta.com. Utah Transit Authority. September 5, 2013. Retrieved February 5, 2014.
  12. ^ a b Evans, Whittney (September 5, 2013). "Officials Announce Sugar House Streetcar Name and Design". Salt Lake City: KUER. Retrieved September 20, 2013. Our expectation is that as this system expands, which we are obviously fully anticipating, that we will be moving toward a more traditional streetcar design.
  13. ^ "Sugar House Streetcar Project: Environmental Assessment" (PDF). UTA. November 2010. Retrieved December 6, 2016.
  14. ^ a b Wanek-Libman, Mischa (April 10, 2019). "UTA completes S-Line double track project". Mass Transit (magazine). Retrieved July 4, 2022.
  15. ^ "STB Docket No. AB-33 (Sub-No. 195X)" (PDF). Surface Transportation Board. June 16, 2005. p. 1. Retrieved August 21, 2009.
  16. ^ Robinson, Jeff (October 20, 2010). "Streetcar Line Gets Massive Boost from DOT". KCPW. Retrieved October 21, 2010.
  17. ^ Page, Jared (October 20, 2010). "Salt Lake City receives $26 million for Sugar House streetcar project". Deseret News. Salt Lake City: Deseret Digital Media. Retrieved October 28, 2010.
  18. ^ "Sugar House Streetcar" (PDF). rideuta.com. Utah Transit Authority. May 17, 2012. Retrieved April 22, 2013.
  19. ^ Speckman, Stephen (May 16, 2003). "Man dreams of Sugar House trolley: But it's wishful thinking, some critics believe". Deseret News. Salt Lake City: Deseret Digital Media. Retrieved December 22, 2010.
  20. ^ "Worldwide Review [regular news section]". Tramways & Urban Transit. UK: LRTA Publishing. July 2012. p. 276.
  21. ^ Davidson, Lee (April 5, 2019). "UTA celebrates completion of double track for Sugar House streetcar, and hails new development it has attracted". The Salt Lake Tribune. Retrieved April 10, 2019.
  22. ^ "S-Line Extension Project". www.rideuta.com. Retrieved December 7, 2023.
  23. ^ rideuta (November 2023). "S-LINE EXTENSION FACT SHEET". rideuta.com.
  24. ^ "Sugar House Streetcar: Phase 2". shstreetcar.com. Retrieved April 3, 2013.
  25. ^ "Alignments for Consideration" (PDF). shstreetcar.com. Redevelopment Agency of Salt Lake City. Retrieved December 6, 2012.
  26. ^ "Sugar House Streetcar FAQs" (PDF). shstreetcar.com. Salt Lake City. p. 2. Retrieved April 21, 2012.
  27. ^ Park, Shara; Adams, Andrew (April 24, 2013). "Hundreds of residents sound off on proposed streetcar route". ksl.com. Salt Lake City: Deseret Digital Media. Retrieved April 24, 2013.
  28. ^ Nelson, Paul (May 6, 2013). "Business owners worry about pending Sugar House streetcar route". ksl.com. Salt Lake City: Deseret Digital Media. Retrieved May 7, 2013.
  29. MediaNews Group
    . Retrieved May 7, 2013.
  30. ^ "Environmental Re-evaluation Documentation" (PDF). rideuta.com. Utah Transit Authority. December 20, 2011. p. 21. Retrieved April 21, 2013.
  31. ^ "Streetcar S-line" (PDF). rideuta.com. Utah Transit Authority. April 13, 2014. Archived from the original (PDF) on April 7, 2014. Retrieved April 4, 2014.
  32. ^ "Utah Transit Authority". January 29, 2016. Archived from the original on January 29, 2016. Retrieved November 14, 2019.

External links

KML is from Wikidata