Tangshan railway station

Coordinates: 39°37′27″N 118°6′46″E / 39.62417°N 118.11278°E / 39.62417; 118.11278
Source: Wikipedia, the free encyclopedia.

Tangshan

唐山
China Railway Corporation
Line(s)
Platforms7
History
Opened11 November 1994 (1994-11-11)[1]

Tangshan railway station (

.

History

Construction of Tangshan railway station started on 17 March 1993, and opened to passenger services on 11 November 1994.[1] The original Tangshan railway station was renamed Tangshan South.[2]

On 26 November 2013, a new station building was put into use.[3]

See also

References

  1. ^ a b "唐山火车站:回眸百年沧桑 憧憬辉煌未来". 22 April 2011. Archived from the original on 5 August 2019. Retrieved 14 May 2022. 位于唐山新华西道西端的新客运站唐山站,于1993年3月17日开工兴建,由铁路和地方投资4190.4万元,1994年4月29日完成全部站房建设,总建筑面积10185平方米,同年11月11日随着京山压改工程开通同时启动办理客运业务
  2. ^ "唐山南站:百年老站见证城市变迁_河北新闻网". Hebei News. 19 April 2018. Retrieved 14 May 2022.
  3. ^ "唐山新火车站正式投用 总投资14.6亿元" (in Chinese). 2 December 2013. Retrieved 14 May 2022.
Preceding station China Railway Following station
Lutai
towards Tianjin
Tianjin–Shanhaiguan railway Qian'an
towards Shanhaiguan
Preceding station China Railway High-speed China Railway High-speed Following station
Binhai North
towards Tianjin West
Tianjin–Qinhuangdao high-speed railway Luanhe
towards Qinhuangdao

39°37′27″N 118°6′46″E / 39.62417°N 118.11278°E / 39.62417; 118.11278