Dandong–Dalian intercity railway
Dandong–Dalian intercity railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC (Overhead line) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 250 km/h (160 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Dandong–Dalian intercity railway (simplified Chinese: 丹大城际铁路; traditional Chinese: 丹大城際鐵路; pinyin: Dān-Dà Chéngjì Tiělù) is a high-speed line operated by China Railway High-speed within the Liaodong Peninsula of Liaoning province, connecting the coastal cities of Dandong and Dalian.
Overview
Dandong–Dalian intercity railway is broken down into three segments:
electrified railway. The construction period was estimated to take about three and a half years[2] and was started on 17 March 2010. It started operation on 17 December 2015.[3]
History
Planning phase
- 21 April 2009 – Liaoning Provincial Government and the Ministry of Railways signed the "On the strengthening of Liaoning railway construction Minutes", which set a railway design speed of 250 km/h (160 mph) along a double track line electrified railway for passengers and freight.
- 28 June 2009 – Ministry of Railways jointly with the provincial government reported to the National Development and Reform Commission about their studies on this project.[4]
- 19–21 December 2009 – Ministry of Railways held preliminary design review meeting, formally adopting the project preliminary design review.
Construction phase
- 17 March 2010 – Dandong – Zhuanghe section started.[5]
- 2 December 2010 – First bridge girder erection in the Donggang, Liaoning, area, well north of the town of Wolong with several large bridges completed.[6]
Operation phase
- 17 December 2015 – Start operation.
References
- ^ 大连到丹东一个半小时 丹大快速铁路计划工期三年半 (in Chinese). Dalian Daily. Archived from the original on 1 February 2012. Retrieved 7 July 2011.
- ^ 丹大快速铁路开工进入倒计时 (in Chinese). Dalian Daily. Archived from the original on 8 July 2012. Retrieved 28 December 2009.
- ^ 丹大快铁开通运营 1小时生活圈又大了 (in Chinese). 沈阳网. Archived from the original on 4 March 2016. Retrieved 20 December 2015.
- ^ 丹大客运专线年底前开工 1小时45分到达大连 (in Chinese).[permanent dead link]
- ^ 沈丹铁路客运专线和丹大快速铁路正式开建 (in Chinese).
- ^ 丹大快速铁路昨日“上梁” (in Chinese). Archived from the original on 8 June 2015. Retrieved 6 January 2015.