Hangzhou East railway station
Hangzhoudong 杭州东 China Railway Corporation | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Line(s) |
| |||||||||||||||||
Other information | ||||||||||||||||||
Station code |
| |||||||||||||||||
Classification | Top Class station | |||||||||||||||||
History | ||||||||||||||||||
Opened | 1992 (original) | |||||||||||||||||
Closed | 2010 (original) | |||||||||||||||||
Rebuilt | 1 July 2013 | |||||||||||||||||
|
Hangzhoudong (Hangzhou East) railway station (
Shanghai-Kunming railway, it has been rebuilt as a high-speed rail
hub, which became operational on 1 July 2013.
History
The old station opened in 1992,[2] located on Tiancheng Road. It was closed on 20 January 2010,[3] and demolished.[4] Its train services were moved to Hangzhou railway station and Hangzhou South railway station.[3]
A new station was built on the site. It officially opened on 1 July 2013, in conjunction with the opening of the
Shanghai–Hangzhou Passenger Railway. It has 30 railway tracks, and stations for Hangzhou Metro lines 1 and 4.[5] A coach station and bus terminals are also part of the new transit hub.[4]
Metro station
Lines 1 & 4
Track layout | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
B3
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Hangzhou East railway station is served by a station of the same name on
Line 4 of Hangzhou Metro. This station offers paired cross-platform interchange
for passengers riding between 4 directions of the two lines.
Line 6 & 19
The metro station for Line 6 and Line 19 is a separated station called "East Railway Station (East Square)".[1]
Around the station
See also
References
- ^ a b "来了!6号线二期明天开通,"证件照"抢先看". 2021-11-05. Archived from the original on 2021-11-05. Retrieved 2021-11-05.
- ^ 发展中的杭州东站 (in Chinese). Archived from the original on 2011-07-12.
- ^ a b Li Hui (26 January 2010). "Hangzhou railway renovation begins". China Daily. Retrieved 1 May 2012.
- ^ a b "Automatic Ticket Machines Installed in Hangzhou Railway Station". City News. Hangzhou Municipal People's Government. 19 October 2010. Archived from the original on 2 December 2012. Retrieved 1 May 2012.
- ^ "Railway station". Hi Center. Hangzhou Municipal People's Government. 2 March 2012. Archived from the original on 15 November 2013. Retrieved 1 May 2012.
Preceding station | China Railway High-speed | Following station | ||
---|---|---|---|---|
Deqing towards Nanjing South
|
Nanjing–Hangzhou high-speed railway | Terminus | ||
Terminus | Hangzhou–Ningbo high-speed railway | Hangzhou South towards Ningbo
| ||
Linping South towards Shanghai Hongqiao
|
Shanghai–Kunming high-speed railway | Hangzhou South towards Kunming South
| ||
Terminus | Hangzhou–Taizhou high-speed railway | Hangzhou South towards Yuhuan
| ||
Preceding station | China Railway | Following station | ||
Jianqiao towards Shanghai or Shanghai South
|
Shanghai–Kunming railway | Hangzhou South towards Kunming
|