USS Reindeer (ATA-189)
History | |
---|---|
United States | |
Name | Reindeer |
Builder | Levingston Shipbuilding Co., Orange, Texas |
Laid down | 11 September 1944 |
Launched | 19 October 1944 |
Commissioned | 20 December 1944 |
Decommissioned | 29 August 1947 |
Stricken | 1 September 1962 |
Fate | Sold by the Maritime Administration, 28 March 1975, for non-transportation use, Arctic Seafood Corp |
General characteristics | |
Class and type | Sotoyomo-class auxiliary fleet tug |
Displacement | 534 t.(lt) 835 t.(fl) |
Length | 143 ft (44 m) |
Beam | 33 ft (10 m) |
Draft | 13 ft (4.0 m) |
Propulsion | diesel-electric engines, single screw |
Speed | 13 knots (24 km/h; 15 mph) |
Complement | 45 |
Armament |
|
The third Reindeer (ATA-189), originally projected as ATR-116, was laid down by the Levingston Shipbuilding Co., Orange, Texas, 18 September 1944; launched 19 October 1944; and commissioned 20 December 1944.
Following shakedown in the
Kwajalein
.
Operating out of
James River, Virginia
, where she remained until 1970.
References
- This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.
- NavSource Online: Service Ship Photo Archive USS Reindeer (ATA-189)