West Durham Wind Farm

Coordinates: 54°46′05″N 1°49′18″W / 54.7680°N 1.8216°W / 54.7680; -1.8216
Source: Wikipedia, the free encyclopedia.

West Durham Wind Farm
West Durham Wind Farm
Map
CountryEngland, United Kingdom
Locationnear Tow Law, County Durham
Coordinates54°46′05″N 1°49′18″W / 54.7680°N 1.8216°W / 54.7680; -1.8216
StatusOperational
Commission dateMay 2009
Owner(s)ESB Group
Power generation
Units operational26 × 2 MW
Make and model
REpower: MM82
Nameplate capacity24 MW
]

West Durham Wind Farm is a wind farm near Tow Law, County Durham, England.

History

Developed by County Durham-based company the

Electricity Supply Board[2]

Design and specification

The wind farm has a

MW, containing twelve Repower MM82 turbines each rated at 2MW.[3] It was the first wind farm containing turbines supported on driven steel tubular piles.[4]

References

  1. ^ Guy, Ben (11 July 2008). "BIGGEST SO FAR". The Journal. Retrieved 10 August 2011.
  2. ^ "Irish firm buys its first British wind farms".
  3. ^ "BWEA: Coupons, Promo Codes & Deals for Online Brands".
  4. ^ "Sweco UK | Engineering, Environment, Design & Regulatory Consultants".