Yongin–Seoul Expressway
(Redirected from
Yongin-Seoul Expressway
)Expressway No.171 | |
---|---|
Kyeong-su Expressway | |
Gangnam-gu, Seoul | |
Location | |
Country | South Korea |
Highway system | |
|
Yongin–Seoul Expressway | |
Hangul | 용인서울고속도로 |
---|---|
Hanja | 龍仁서울高速道路 |
Revised Romanization | Yongin Seoul Gosok Doro |
McCune–Reischauer | Yongin Sŏul Kosok Toro |
Yongin–Seoul Expressway (
Osan-Hwaseong Expressway either.[1] Plans have been made to connect the Busan side of Gyeongbu Expressway and Yongin-side Geumto Tollgate.[2]
History
The expressway was designed to reduce traffic on the
built to order and is operated by Kyeongsu Expressway Corporation for 30 years. 1.5 trillion won was spent to build this expressway, with Kyeongsu Expressway Corp investing 570 billion won.[4]
Timeline
- 16 September 2002: Proposal for BTO was submitted.[5]
- 23 December 2003: Kyeong-su Expressway Corp established.[5]
- 3 November 2004: Expressway number 141 is assigned for Yongin–Seoul Expressway.[6]
- 20 May 2005: Groundbreaking ceremony occurred.[5]
- 31 October 2005: Construction started for Heungdeok IC ~ Heonneung IC.[5]
- 3 January 2008: Expressway number 171 is reassigned.[7]
- 30 June 2009: Establishing ceremony occurred in Geumto Tollgate.[4]
- 1 July 2009: Heungdeok IC ~ Heonneung IC established.[8]
Toll
Yongin–Seoul Expressway was built and is operated by a private investment company. The toll collection system is different from how
Korea Expressway collects tolls. Toll fees were originally 1,800 won, but later raised to 2,000 won. 1,100 won is collected at W. Suji Tollgate, and 900 Won is collected at Geumto Tollgate. Traffic from Heungdeok interchange and Gwanggyo-Sanghyeon interchange leaving W. Suji Tollgate pay an additional 600 won. The same applies for vehicles entering W. Suji in the direction of Heungdeok.[9]
Composition
Lanes
- Godeung IC ~ Heonneung IC: 4 lanes
- Heungdeok IC ~ Godeung IC: 6 lanes[10]
Length
- 22.9 Km[10]
Speed limit
- All area Max. 100 km/h[11]
List of facilities
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(November 2021) |
- Number stands for IC and JC number, TG stands for Tollgate, SA for Service Area.
Number | Name | Korean name | Hanja name | Length between each other |
Length | Connection | Place | Note | ||
---|---|---|---|---|---|---|---|---|---|---|
Connected with Regional road no.311 | ||||||||||
Connected with Osan-Hwaseong Expressway through Bongyeong-ro
| ||||||||||
1 | Heungdeok | 흥덕 나들목 | 興德 | - | 0.00 | Bongyeong-ro |
Gyeonggi Province | Yongin | Direct connection with Local Route 311.[12] | |
2 | Gwanggyo-Sanghyeon | 광교상현 나들목 | 光敎上峴 | 3.20 | 3.20 | Suwon | Entrance/exit to Yongin is disallowed[12] | |||
3 | W. Suji | 서수지나들목 | 西水枝 | 2.10 | 5.30 | Yongin | Entrance on Yongin direction and exit on Seoul direction will pay on W. Suji TG.[12] | |||
TG | W. Suji TG | 서수지요금소 | 西水枝料金所 | Main Tollgate[12] | ||||||
4 | W.Bundang (Gogi) |
서분당 (고기) |
西盆唐 (古基) |
5.07 | 10.37 | Local Route 334 | [12] | |||
5 | W.Pangyo | 서판교 | 西板橋 | 2.83 | 13.20 | Local Route 84 | Seongnam | [12] | ||
TG | Geumto TG | 금토요금소 | 金土料金所 | Main Tollgate[12] | ||||||
5-1 | Geumto JC | 금토 분기점 | 金土分岐點 | Gyeongbu Expressway | ||||||
6 | Godeung | 고등나들목 | 高登 | 4.12 | 17.32 | Local Route 23 Cheonggyesan-ro |
Entrance and exit on Seoul direction is disallowed[12] | |||
7 | Heolleung | 헌릉나들목 | 獻陵 | 4.96 | 22.28 | Seoul City Route 41 (Heolleung-ro) |
Seoul | Seocho-gu
|
Gangnam-gu
|
[12] |
Seoul Endpoint | 0.62 | 22.90 |
See also
- Pyeongtaek-Hwaseong Expressway
- Osan-Hwaseong Expressway
Footnotes
- ^ Gwanggyo-Sanghyun IC connects to Yeongdong Expressway via other roads, but not directly.
- Seongnam City, but there is no direct connection.
- ^ Connected with National Route 43
References
- ^ Korea Expressway. Archived from the originalon 2014-11-07. Retrieved 7 November 2014.
- ^ Shin, Jeongyeon (2014-06-26). 경부-용인서울 고속도로 2018년 연결…이달 중 실시설계 [Kyeongbu- Yongin-Seoul Expressways connects in 2018…design starts this month] (in Korean). MBC. Archived from the original on 2014-11-02. Retrieved 6 November 2014.
- ^ Park, Ik-hee (2009-06-26). “용인~서울" 민자 고속도로 7월 1일 개통으로 ´씽씽´ ["Yongin-Seoul" Private Expressway established in July 1] (in Korean). Daylian. Archived from the original on 2014-11-06. Retrieved 6 November 2014.
- ^ a b Song, Kyeong-su (2009-06-30). 용인~서울 민자고속도로 내달 1일 개통 [Yongin~ Seoul Private Expressway establishes next month] (in Korean). Jaekyong News. Archived from the original on 2011-08-16. Retrieved 6 November 2014.
- ^ a b c d Gyeongsu Expressway Corp. 회사개요 (in Korean). Gyeongsu Expressway Corp. Archived from the original on 2014-11-04. Retrieved 4 November 2014.
- ^ President order no.18579 "Order in assignment of Expressway" (Revised 3 November 2004)
- ^ Korea Ministry of Government Legislation (2008-01-03). 고속국도 노선 지정령 [Order on assignment of Expressway route]. law.go.kr (in Korean). Korea Ministry of Government Legislation. Archived from the original on 18 October 2014. Retrieved 11 November 2014.
- ^ Lee, Eun-a (2009-05-31). 모습 드러낸 용인~서울 고속도로 [Yongin~ Seoul Expressway appeared] (in Korean). Maeil Economy. Archived from the original on 2012-07-16. Retrieved 6 November 2014.
- ^ Ohon, Hye-seon (2009-06-26). 서울~용인고속도로 통행료 1800원선 [Seoul~ Yongin Expressway toll will be approximately 1,800 Won] (in Korean). Archived from the original on 2015-09-24. Retrieved 6 November 2014.
- ^ a b "용인서울고속도로 노선상세정보 | 한국도로공사 포털홈페이지" [Yongin-Seoul Expressway information] (in Korean). 한국도로공사. Archived from the original on February 13, 2014. Retrieved 26 December 2014.
- ^ "고속도로속도 | 한국도로공사 포털홈페이지" [Speed limits | Korean Expressway] (in Korean). 한국도로공사. Archived from the original on 26 December 2014. Retrieved 26 December 2014.
- ^ a b c d e f g h i "용인-서울고속도로" [Kyung-su Expressway] (in Korean). 경수고속도로 (주). Archived from the original on 26 December 2014. Retrieved 26 December 2014.