CIÉ No. CC1

Source: Wikipedia, the free encyclopedia.

CIÉ No.CC1
Turf Burner
Type and origin
Power typeSteam
Designer
Córas Iompair Éireann
NumbersCC1
NicknamesTurf Burner
LocaleIreland
First run1957
Last run1958
Withdrawn1963
DispositionScrapped, 1965

articulated steam locomotive designed by Oliver Bulleid to burn turf (an Irish term for peat used as fuel) and built at CIÉ's Inchicore Works in Dublin. CC1 shared some, but not all, of the characteristics of Bulleid's previous attempt to develop a modern steam locomotive, the Leader. Like the one completed Leader, CC1 had a relatively short career and was never used in front-line service. It was the last steam locomotive to be constructed for an Irish railway.[1]

Background

Turf as locomotive fuel

Experiments with turf as a fuel for steam locomotives began in the early days of Irish railways. The first use of turf in a locomotive was on the

Listowel and Ballybunion Railways, but there is no evidence of routine use.[2] During the Emergency (World War II), shortages of imported coal led to the use of turf as one of several substitutes (others included loose coal dust and briquettes of anthracite dust bonded with pitch).[3][4]

The first locomotives designed specifically to burn turf were three

0-4-2T locomotive 7, Tom Rolt.[5]

The postwar years: turf development and fuel experiments

From the 1930s onwards (originally through the Turf Development Board), the Irish government aimed to encourage turf production for reasons of

winter of 1946–1947 saw severe coal shortages that led to the cancellation of most CIÉ rail services[6] and further strengthened the case for an alternative fuel. CIÉ had carried out limited experiments with oil firing in 1945 and later converted a total of 93 steam locomotives to this fuel in 1946–47; however, the oil-burning scheme was abandoned in late 1947 as coal supplies began to return to normal, although a further experiment was made in 1954.[7]
It was against this backdrop that Bulleid joined CIÉ.

Bulleid comes to Ireland

In July 1948, former

British Railways Southern Region, was amongst the latter. The resulting Milne Report, submitted in December, advised the rationalisation of the steam locomotive fleet and the construction of new, standardised steam locomotives; however, it saw diesel traction's advantages as unproven.[8]
Bulleid retired from BR in September 1949 and became consulting mechanical engineer to CIÉ, succeeding to the post of Chief Mechanical Engineer a year later. He indicated his interest in turf-burning locomotives at an early stage, and laboratory experiments and tests in stationary boilers were underway by 1950. Preparations for the conversion of an existing locomotive to burn turf began in early 1951.[9]

Experiments with converted locomotive

The former Great Southern and Western Railway

auger; there was no means of regulating this process.[12] Steaming trials with the modified 356 began in 1952.[11] Difficulties with steaming led to the addition of a forced-draught fan, which was mounted on a wagon behind the tender and driven by a Leyland bus engine. The results of trials with 356 were mixed,[13] and the locomotive was broken up in 1957;[14] however, some of the concepts were incorporated into CC1.[15]

Design of CC1

Discarded concepts

Bulleid rejected a number of variants before deciding on CC1's configuration. In addition to the 0-6-6-0 wheel arrangement ultimately chosen, he considered an

Sir Harry Ricardo on the matter.[19] However, he ultimately reverted to piston valves in the face of political pressure to make progress on the locomotive's development.[20]

The final design

CC1 was a double-ended

Double Fairlie, although CC1 differed in having only one boiler and in having its buffers and drawgear mounted on the locomotive frame, rather than on the bogies.[22]

CC1 and Leader designs compared

Several commentators have compared CC1 to Leader.

GG1 electric locomotive), whereas Leader's were located at the ends. CC1's double-ended boiler design contrasted with Leader's single-ended boiler; the boiler was also located in the middle of the locomotive, rather than towards one end, and was not offset from the locomotive's longitudinal centre line.[26] The fuel bunkers and water tanks were also located at one end of the locomotive in Leader but both ends in CC1.[25]
CC1's lack of sleeve valves has already been mentioned. Finally, there were changes associated with the difference in fuel; the coal-fired Leader did not require the augers, mechanical stokers and induced-draught fans fitted to CC1.

Testing

CC1 was first steamed in July 1957 and began main line trials the following month.

former Midland Great Western main line, but ride quality suffered on this route's sharp curves.[29] A review of the trial results by Bulleid's assistant, John Click (a secondee from BR) showed that the generally performed well, with excellent riding (apart from the above exception) at speeds up to 70 mph (113 km/h); much of the test running was at high speeds. Turf consumption and noise levels were also very favourable.[30]

Problems experienced

Like Leader, CC1 experienced a variety of problems during testing, some of which were addressed through modifications; for example, the installation of the spark arrestors mentioned above cured problems of spark emission. The locomotive's water consumption was high and the boiler's double-ended nature and sectional construction gave rise to various difficulties, as did the locomotive's twin regulators and its reversing gear.[31] When operating with CC1's number 2 end leading, the driver and fireman were on the same side of the locomotive, posing problems in signal sighting; steam and smoke exacerbated the problem until smoke deflectors were fitted. Issues also arose with leakage of the drive chains' oil baths, a problem common to multiple Bulleid designs.[32]

Proposed successors

It was intended that CC1 would be the forerunner of a class of fifty eight locomotives, which would normally burn oil but would be capable of using turf in emergencies.[33] On the basis of the trial results, John Click developed a design for a single-ended version of CC1, which would address space, weight and other problems experienced with the CC1 configuration. This locomotive would have had a single-ended boiler barrel (still of square section) with a cab located at the firebox end of the boiler; water tanks would be located at either end of the locomotive and a bunker at the cab end. Click believed that the design had export potential, but the entire project was to come to an end shortly thereafter.[34]

Post-testing use, withdrawal and disposal

After the end of the testing programme, CC1 reportedly made a few trips hauling transfer freight trains in the Dublin area. Bulleid himself is reported to have driven the locomotive on trips between Inchicore and

EMD.[35] Several sources describe CC1 as having been broken up in 1965.[1][23][37] However, the boiler was "retained for possible stationary use"[35] and the chassis appears to have survived into the 1970s, having been described as "still surviving at Inchicore" in 1975[38] and photographed at least once in this period. Later, a retired CIÉ executive commented that the scrapping was "a pity" because "such an oddity deserved preservation."[37]

Notes

  1. ^ a b c Ferris, p. 99
  2. ^ Shepherd, p. 7
  3. ^ Doyle and Hirsch, p. 96
  4. ^ Shepherd, p. 9
  5. ^ a b Shepherd, p. 27
  6. ^ Shepherd, pp. 11–2
  7. ^ Shepherd, pp. 15–7
  8. ^ Shepherd, pp. 25–7
  9. ^ Shepherd, pp.29–30
  10. ^ Shepherd, p. 30
  11. ^ a b Doyle and Hirsch, p. 122
  12. ^ Shepherd, p. 31
  13. ^ Shepherd, p. 42
  14. ^ Shepherd, p.73
  15. ^ Shepherd, p.42
  16. ^ Shepherd, pp. 47–8
  17. ^ Shepherd, p. 44
  18. ^ Shepherd, pp. 43–4
  19. ^ Shepherd, pp. 42–3
  20. ^ Shepherd, p. 45
  21. ^ Shepherd, pp. 59–62
  22. ^ Shepherd, p. 70
  23. ^ a b Doyle and Hirsch, p. 124
  24. ^ Shepherd, p. 49
  25. ^ a b Shepherd, p. 59
  26. ^ Shepherd, p. 60
  27. ^ Shepherd, pp. 54, 63
  28. ^ Shepherd, pp. 90–1
  29. ^ Shepherd, p. 67
  30. ^ Shepherd, p. 69
  31. ^ Shepherd, pp. 59–74
  32. ^ Shepherd, p. 64
  33. ^ Shepherd, p. 54
  34. ^ Shepherd pp. 76, 78
  35. ^ a b c Shepherd, p. 76
  36. ^ Ó Riain, p. 162
  37. ^ a b Ó Riain, p. 77
  38. .

References

External links