Armenian Nuclear Power Plant
Armenian Nuclear Power Plant | |
---|---|
VVER-440 Model V-270 | |
Thermal capacity | 1,375 MWt |
Power generation | |
Units operational | 1 x 440 GW·h |
External links | |
Website | armeniannpp |
Commons | Related media on Commons |
] |
The Armenian Nuclear Power Plant (ANPP) (Armenian: Հայկական ատոմային էլեկտրակայան), also known as the Metsamor Nuclear Power Plant, (Armenian: Մեծամորի ատոմային էլեկտրակայան) is the only nuclear power plant in the South Caucasus, located 36 kilometers west of Yerevan in Armenia.
The ANPP complex consists of two
The plant supplied approximately 40 percent ofAs with other early VVER-440 plants, and unlike Western
History
The ANPP complex consists of two units. The first unit was activated on 22 December 1976, and the second on 5 January 1980.[1] Following public pressure after the
ANPP is operated by CJSC HAEK (Closed Joint Stock Company Armenian Atomic Power Plant), according to the ratification of the Republic of Armenia on the usage of nuclear energy. The principal goal of this company has been stated to be the ability to produce safe and cost-efficient energy.[5]
Earthquake resistance
The plant lies close to an area prone to earthquakes with magnitudes up to 8. However, the plant was only constructed to resist earthquakes with a magnitude of up to 7.[1][6]
Main technical and economical performance indicators
2003 | 2004 | 2005 | 2006 | 2007 | |
---|---|---|---|---|---|
Power generation (bln. KWh) | 1,997 | 2,402 | 2,716 | 2,640 | 2,553 |
Capacity factor (%) | 60,80 | 72,94 | 82,69 | 80,37 | 77,73 |
Availability factor (%) | 83,09 | 76,87 | 84,24 | 84,60 | 80,97 |
Recent unit 2 developments
The
In December 2008, the Armenian government's progress in meeting international safety standards regarding its use of nuclear energy at the Metsamor NPP was praised by Council on Nuclear Energy Safety Chairman Adolf Birkhofer, who also praised the overall development of the energy system in the country.[9]
In the wake of Japan's
In October 2015 a life extension of unit 2 was agreed, to take place in 2017 and 2018, permitting it to operate until 2027. The work will include modernization of the turbine hall equipment enabling unit 2's power output to increase by 15-18%.[11]
In August 2021 the reactor pressure vessels underwent thermal annealing procedure by Rosatom with the goal to extend its service life until 2026, possibly followed by another 10-year extension.[12] The capacity was boosted to 440 MW in a $40 million deal.[13]
Discussions on possible third unit
On 23 April 2007 Director
Armen Movsisyan has also announced that a decision to build a new unit at the operating nuclear power plant to replace the one to be decommissioned has been taken. The new unit would support 1,000 MW, which would "not only meet the needs of Armenia and reduce the country's dependence on organic energy [gas, oil, etc.] considerably but will also have certain energy importance in the region."[14] A feasibility study for building a new reactor at the Metsamor nuclear power plant is underway with the assistance of foreign specialists. This work is expected to be completed within 1–2 years. Another proposed idea would be to have the unit support 1,200 MW.[15] The cost of the project will go upwards from $4 billion to 5.2-7.2 billion depending on the power of the plant. Armenian Deputy Minister of Energy and Natural Resources Areg Galstyan said that the construction of the new nuclear power plant may start in 2011. The new NPP was expected to be commissioned in 2017.[15] The United States has backed plans for a new Armenian Nuclear Plant and has pledged to help the Armenian government conduct feasibility studies needed for the implementation of the multimillion-dollar project.[16] On 29 November 2007, the Armenian government approved a plan to shut down the nuclear power plant, but gave no specific date. According to Energy Minister Armen Movsisyan, the shutdown could cost up to $280 million.
In February 2009, the government announced a tender for a new 1000 MWe unit. In May 2009, Australian company Worley Parsons was chosen to administer the project, and a $460 million management contract was signed in June. Legislation providing for the construction of up to 1200 MWe of new nuclear capacity at Metsamor from one or more reactors was passed in June 2009. In December 2009, the government approved the establishment of JV Metzamorenergoatom, a 50-50 Russian-Armenian joint stock company set up by the Ministry of Energy and Natural Resources with Atomstroyexport, with shares offered to other investors. This will build a 1060 MWe AES-92 unit (with a VVER-1000 model V-392 reactor) with a service life of 60 years at Metsamor. In March 2010 an agreement was signed with Rosatom to provide the V-392 reactor equipment for it. In August 2010, an intergovernmental agreement was signed to provide that the Russian party will build at least one VVER-1000 reactor, supply nuclear fuel for it and decommission it. Construction was to commence in 2012 or early 2013 and is expected to cost US$5 billion. The customer and owner of new reactors, as well as electricity generated, will be Metzamorenergoatom, and Atomstroyexport will be the principal contractor. Armenia undertakes to buy all electricity produced at commercial rates, enabling investors' return on capital, for 20 years. Metzamorenergoatom is to fund not less than 40% of the construction, and early in 2012, Russia agreed to finance 50%. The latest date for commissioning is 2019–20.[17]
As of 2015, construction of a new nuclear unit was still being considered, though plans were delayed due to the Fukushima crisis. A medium power design of about 600 MWe is now the preferred option.[11]
By 2023, the Ministry of Territorial Administration and Infrastructure was weighing the choice of Russian dual 1200MW, 1000/1400MW South Korean, French, or American small modular reactor designs. The Armenian government intends to select a capacity by year-end 2023. Under an agreement with Russia, construction work is likely to begin by the end of 2024 or early 2025.[18]
Reactors
Unit[19] | Type | Net El. Output (MW) | Gross El. Output (MW) | Start of project | First criticality | Shut down |
---|---|---|---|---|---|---|
Armenia-1 | VVER-440 Model V270 | 376 MW | 407.5 MW | 1 July 1969 | 22 December 1976 | 25 February 1989 |
Armenia-2 | VVER-440 Model V270 | 376 MW | 407.5 MW | 1 July 1975 | 5 January 1980 | expected in 2036 |
The International Atomic Energy Agency (IAEA) contributed to the developments and improvements of the plant. Armenia signed a contract with Russia to modernize the plant and extend the lifespan until 2036.[20]
Concerns regarding environment
As the Metsamor Plant is near Turkey, 16 km from the border, its environmental issues are of great significance for Turkey as well. Moreover, the European Union is also concerned with this issue. Previously, there were various proposals to shut down the plant, but as it is of great importance for Armenia, the Armenian government decided that it will continue operating until a new one is built.[21]
Hakob Sanasaryan, an Armenian chemist and environmentalist campaigner and head of the Green Union of Armenia, claimed in 1996 that the Metsamor Nuclear Power Plant did not meet internationally accepted nuclear safety standards, due to the lack of a containment vessel.[22]
Military threats by Azerbaijan
On 16 July 2020, during the
Armenia's Ministry of Foreign Affairs responded that the threats "indicate the level of desperation and the crisis of mind of the political-military leadership of Azerbaijan" and called it a "flagrant violation of the
See also
- Energy in Armenia
- Electricity sector in Armenia
- List of nuclear reactors
- Nuclear energy policy by country
- Nuclear power by country
References
- ^ ISBN 978-92-0-112604-7. Archivedfrom the original on 9 June 2020. Retrieved 2 November 2017.
- ISBN 9789201011015. Archivedfrom the original on 9 June 2020. Retrieved 2 November 2017.
- ^ "Is Armenia's Nuclear Plant the World's Most Dangerous?". Archived from the original on 12 April 2011. Retrieved 12 April 2011.
- ^ ISBN 978-90-481-3504-2. Archivedfrom the original on 9 June 2020. Retrieved 2 November 2017.
- ^ a b "Official site". armeniannpp.am. Archived from the original on 25 March 2020. Retrieved 9 July 2017.
- ISBN 978-1-4020-8317-4.
- ^ "Armenia Presses Ahead with Nuclear Power Plant Construction". Archived from the original on 5 June 2011. Retrieved 5 June 2009.
- ^ a b Harutyunyan, Sargis (2 June 2011). "International Experts Find Adequate Safety At Armenian Nuclear Plant". «Ազատ Եվրոպա/Ազատություն» Ռադիոկայան. Archived from the original on 18 June 2011. Retrieved 2 June 2011.
- ^ Adolf Birkhofer Gives Armenian Atomic Energy Plant a Clean Bill of Health[permanent dead link] Hetq Daily, 2 December 2008
- ^ "IAEA Leads Operational Safety Mission to Armenian Nuclear Power Plant". IAEA. 2 June 2011. Archived from the original on 22 December 2015. Retrieved 25 October 2015.
- ^ a b "Armenian NPP life extension goes ahead". World Nuclear News. 20 October 2015. Archived from the original on 21 October 2015. Retrieved 25 October 2015.
- ^ "Reactor vessel annealed in Armenia". World Nuclear News. 10 August 2021. Retrieved 13 August 2021.
- ^ "Modernization of Armenian nuclear power plant to boost its performance and bring its capacity to 440 MW, Rusatom Service JSC CEO says". arka.am. 13 September 2021. Retrieved 14 September 2021.
- ^ Itar-Tass Archived 30 October 2007 at the Wayback Machine
- ^ a b Russian Academic: New NPP to Give Armenia Geopolitical Advantage Archived 31 May 2011 at the Wayback Machine
- ^ "www.armenialiberty.org ] Wednesday 21, November 2007". Archived from the original on 19 April 2008. Retrieved 23 November 2007.
- ^ "Nuclear Power in Armenia". Archived from the original on 1 May 2013. Retrieved 28 April 2013.
- ^ "Armenia considers nuclear options". Nuclear Engineering International. 12 June 2023. Archived from the original on 16 June 2023. Retrieved 15 June 2023.
- ^ Power Reactor Information System Archived 11 February 2012 at the Wayback Machine International Atomic Energy Agency: „Armenia, Republic of: Nuclear Power Reactors"[permanent dead link]
- ^ "Armenia / Country Signs Contract with Russia on Nuclear Plant Lifetime Extension :: NucNet | the Independent Nuclear News Agency". 30 May 2023.
- ^ "Nuclear Power in Armenia". world-nuclear.org. Archived from the original on 24 March 2016. Retrieved 12 December 2015.
- ^ Armenia: Reopening Metsamor Archived 27 September 2007 at the Wayback Machine
- ^ "Azerbaijan threatens nuclear 'catastrophe' after border clash with Armenia worsens". The Times. 17 July 2020. Archived from the original on 9 August 2020.
- ^ Hambling, David (17 July 2020). "Azerbaijan Threatens Chernobyl-Style 'Catastrophe' In Caucasus Drone War". Forbes. Archived from the original on 4 August 2020.
- ^ Cole, Brendan (17 July 2020). "Azerbaijan Threatens Missile Strike on Armenian Nuclear Power Plant". Newsweek. Archived from the original on 4 August 2020.
- RFE/RL. 17 July 2020. Archived from the originalon 4 August 2020.
- ^ "Baku, Yerevan exchange statements on possibility of striking critical infrastructure". tass.com. TASS. 17 July 2020. Archived from the original on 4 August 2020.
- ^ "Statement by the MFA of Armenia on threats of the Ministry of Defence of Azerbaijan to launch a missile strike at the Armenian Metsamor Nuclear Power Plant". mfa.am. Ministry of Foreign Affairs of Armenia. 16 July 2020. Archived from the original on 4 August 2020.