Penarth railway station
This article needs additional citations for verification. (April 2012) |
General information | |
---|---|
Location | Penarth, Vale of Glamorgan Wales |
Coordinates | 51°26′08″N 3°10′28″W / 51.4355°N 3.1745°W |
Grid reference | ST184714 |
Managed by | Transport for Wales |
Platforms | 1 |
Other information | |
Station code | PEN |
Classification | DfT category E |
History | |
Original company | Cardiff, Penarth and Barry Junction Railway |
Pre-grouping | Taff Vale Railway |
Post-grouping | Great Western Railway |
Key dates | |
20 February 1878 | Opened |
1968 | Down buildings and platform removed |
1984 | Buildings replaced |
Passengers | |
2018/19 | 0.655 million |
2019/20 | 0.619 million |
2020/21 | 69,056 |
2021/22 | 0.262 million |
2022/23 | 0.367 million |
Notes | |
Passenger statistics from the Office of Rail and Road |
Penarth railway station is the
Station history
Heyday
Penarth Station (or Penarth Town as it was originally known) was built for the Cardiff, Penarth and Barry Junction Railway, and opened in 1878 as part of that company's new line to Lavernock.[2] This was a continuation of the Taff Vale Railway's Penarth Extension Railway, which had been completed in February 1878 and gave the town its first rail link to Cardiff.
The Taff Vale took over the CP&BJR in 1889 and had the line completed from Lavernock to Biglis Junction (east of
After the Beeching review
After
Parts of the disused trackbed through Lower Penarth and towards Sully have been blocked and built on. Other parts have been turned into a rural railway walk and cycle path from north of Alberta Place (south of Penarth station) to Brockhill Rise road overbridge, approximately one half-mile north-east of the former Lavernock station.
Until 1968 Penarth station had two platforms, one on each side of the tracks for down and up traffic, with a gated foot crossing. After the branch was singled and the line on towards Sully and Biglis Junction closed, the platform buildings on the Plymouth Road side were sold and used as a garden centre until they were demolished in the 1980s and a new Government Jobcentre plus and private offices were built in their place.[citation needed] The loss of the down platform and its station building also effectively closed the station's main car parking area in the specially widened eastern end of Plymouth Road.
Closure of the coastal rail line removed the direct link between Penarth and Barry, Barry Island, Rhoose or Llantwit Major. Completion of the journey from Penarth by rail today entails first travelling north as far as Grangetown, before catching a connecting train in the reverse direction to Barry or any of the stations mentioned above, thus increasing the journey time and distance travelled.
Original buildings
BR had most of the original 19th-century station buildings demolished and replaced with modern ones in a major remodelling in 1984. Since 1971 the station's original ticket office building, built in 1887, has been let as a fast food outlet.
The original Railway Hotel no longer provides accommodation but is still a
Facilities
The station has a small "drop off and pick up only" car park in Station Approach. The current ticket office in the station building is open early morning to mid-afternoon six days per week. A self-service ticket machine is provided for use and for collecting pre-paid tickets. Train running information is offered via digital CIS displays and timetable poster boards. Step-free access is available from the entrance to the ticket hall and platform.[10]
All services on this line are currently operated by
Services
The usual service pattern is four trains per hour to Bargoed from Mondays to Saturdays during the day, of which one continues to Rhymney.[11] In the evenings, services terminate at either Ystrad Mynach or Caerphilly and the frequency pattern decreases to two trains per hour. There are several evening services to Treherbert, one combined with a Rhymney departure and a second with one to Caerphilly (both split at Cardiff Central).
On Sundays there is only one train every two hours, totalling seven trains all day, there is no late evening service, and trains run only as far as Cardiff Central.[12]
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Dingle Road | Rhymney Line
|
Terminus | ||
Disused railways | ||||
Dingle Road | Great Western Railway Taff Vale |
Alberta Place Halt |
Barry connections
Since 1968 Penarth has had no direct rail link to Barry Island, although travel between the two towns remains popular. Rail passengers for Barry must travel in the opposite direction and change at Grangetown, before heading back to Barry. Alternatively, passengers may walk about 20 minutes from Penarth to Cogan railway station.
See also
References
- ISBN 978-0-9549866-6-7.
- ISBN 978-1-85794-251-4.
- ^ Crawford, Ewan (7 August 2011). "Chronology for Cardiff Penarth and Barry Junction Railway". A History of Britain's Railways. Railscot. Retrieved 28 February 2013.
- ^ Page, p.82
- ^ Penarth Town Signal Box diagramSignalling Record Society; Retrieved 2013-09-13
- ^ Page, p.178
- ^ "Train Service Anniversary Brings Back Memories" Keitch, B - Penarth Times website news article; Retrieved 2013-09-13
- ^ Photo of buffer stop at the "country" end of Penarth station www.geograph.org ; Retrieved 2013-09-13
- ^ "The Taff Vale Railway by D.S.M Barrie" www.trackbed.com; Retrieved 2013-09-12
- ^ Penarth station facilities National Rail Enquiries
- ^ Table 130 National Rail timetable, May 2017
- ^ "New Sunday train service to run to and from Penarth". Penarth Times. Retrieved 6 October 2019.
Bibliography
- Body, G. (1983), PSL Field Guides - Railways of the Western Region, Patrick Stephens Ltd, Wellingborough, ISBN 0-85059-546-0
- Page, J. (1988), Forgotten Railways: Volume 8 - South Wales (2nd Ed), David & Charles Publishers, Newton Abbott, ISBN 0-946537-44-5