Raipur–Visakhapatnam Expressway

Source: Wikipedia, the free encyclopedia.

Raipur–Visakhapatnam Expressway
Route information
Maintained by National Highways Authority of India (NHAI)
Length464 km (288 mi)
ExistedQ4 2024 (expected)[1]–present
Major junctions
North endAbhanpur, Raipur district, Chhattisgarh
South endVisakhapatnam Port, Visakhapatnam, Andhra Pradesh
Location
Country
Sabbavaram and Visakhapatnam
Highway system

Raipur–Visakhapatnam Expressway (NH-130CD), part of Raipur–Visakhapatnam Economic Corridor (EC-15), is an under-construction, six-lane, 464 km (288 mi) long

Sabbavaram before terminating at Visakhapatnam Port
.

It will reduce the current travel time and distance, from 13 hours to only 8-9 hours, and from 595 km (370 mi) to 464 km (288 mi). It is a part of the

national highways NH-30-NH-34-NH-539-NH-44-Yamuna Expressway, thus connecting Raipur and Visakhapatnam directly to central and north Indian cities, such as Delhi, Agra, Gwalior, Jhansi and Jabalpur.[2]

History

To improve connectivity, tourism, development and economic growth in

Ministry of Road Transport and Highways (MoRTH) planned to build an expressway from Raipur to Visakhapatnam in 2014. It will reduce both travel time and distance, from 13 hours to only 8-9 hours, and from 595 km to 464 km. It will pass through the regions of Dandakaranya and the Eastern Ghats. Once completed, these regions will see exponential growth with the growth of industries and socio-economic development by promoting employment among people living in the regions, which the regions currently lack altogether. The plan was approved by the Government of India in 2017, and Prime Minister Narendra Modi laid the foundation stone for the construction of the expressway in November 2022. The project is being built at a cost of ₹ 20,000 crore, and construction is ongoing on most parts of the expressway's route. The expressway is expected to become operational by the end of 2024.[3][4]

Route

Chhattisgarh

In Chhattisgarh, it will pass through 4 south-eastern districts at between NH-30 and NH-130C:

Odisha

In Odisha, it will pass through 2 south-western-most districts on eastern and western side of NH-26 in Nabarangpur and Koraput districts, respectively:

Andhra Pradesh

In Andhra Pradesh, it will pass only through one district in northeast Andhra Pradesh, on the western side of NH-26:

Construction

The expressway will be fully six-lane, access-controlled and a greenfield project. It is being built using the Hybrid Annuity Model (HAM) mode of construction. The land acquisition and the bidding process for the project is fully completed, except three packages in the Odisha section, and construction is ongoing on most of the expressway's route. The Detailed Project Report (DPR) of the project was made by the South Korean firm, YONGMA Engineering Co. Ltd. – Arkitechno Consultants. The project has been divided into 19 packages. The following table lists the packages, contractors and their statuses.[5]

Chhattisgarh

Packages Chainages[a] Contractor Status
Package-1 Abhanpur to Magerlod (Dhamtari district) (km 0.000 km to 42.852 km) Shalimar Corporation Under construction
Package-2 Sargi to Basanwahi (Kanker district) (42.800 km to km 99.500 km) Dilip Buildcon Ltd. Under construction
Package-3 Basanwahi to Marangpuri (Chhattisgarh-Odisha border) (99.500 km to km 124.661 km) KMV Projects Under construction

Odisha

Packages Chainages Contractor Status
Package-1 Dhanara (Odisha-Chhattisgarh Border) to Hatibena (Nabarangpur district) (124.611 km to 146.500 km) NKC Projects Under construction
Package-2 Hatibena to Badakumari (146.500 km to 179.000 km), Nabarangpur district Barbrik Under construction
Package-3 Badakumari to Karki (179.000 km to 226.500 km), Nabarangpur district Adani Transport Under construction
Package-4 Karki to Kaliagura (226.500 km to 249.000 km), Nabarangpur district NKC Projects Under construction
Package-5 Borigumma to Dasamantpur (249.000 km to 293.000 km), Koraput district HG Infra Engineering Under construction
Package-6 Koraput to Pottangi (293.000 km to 338.500 km), Koraput district HG Infra Engineering Under construction
Package-7 Baraja to Kandili, Koraput district DRA Infracon Under construction
Package-8 Kandili to Tumbiguda, Koraput district Max Infra Under construction
Package-9 TBD TBD Pending notice
Package-10 TBD TBD Pending notice
Package-11 TBD TBD Pending notice

Andhra Pradesh

Packages Chainages Contractor Status
Package-1 Aluru to Jakkuva (365.033 km to 396.800 km), Parvathipuram Manyam district HG Infra Engineering Under construction
Package-2 Jakkuva to Korlam (Vizianagaram district) (396.800 km to km 421.100 km) NKC Projects Under construction
Package-3 Korlam to Kantakapalle (421.100 km to 445.100 km), Vizianagaram district PSK Infrastructures and Projects Under construction
Package-4 Kantakapalle to ) (445.100 km to 464.662 km) NKC Projects Under construction

Benefits

The expressway will benefit Central India along with the entire country as follows:[6]

Proposed future connectivity

Following additional connectivity has been proposed by constructing new links with the expressway:

NCR-CMC hubs of Bhatinda-Hisar-Jaipur-Gwalior

There is a proposal to link this corridor to north-western India by a combination of constructing greenfield stretches and upgrading existing roads through

Joura
.

NCR-CMG hubs of Ludhiana-Patiala-Ambala-Narnaul-Alwar

There is another proposal to link this corridor to

Trans–Haryana Expressway and beyond to Delhi–Amritsar–Katra Expressway, Delhi–Mumbai Expressway and Delhi–Mumbai Industrial Corridor Project by a combination of constructing greenfield stretches and upgrading existing roads through Narnaul-Alwar-Karauli-Mohana-Datia
(and/or Gwalior). Detailed routes will see the upgrade of existing State Highways (SH) to National Highways (NH), such as:

Eastern Economic Corridor

There is a proposal to connect it to Eastern Economic Corridor (Paradeep in Odisha to Raxaul on Bihar-Nepal border), by constructing either a spur or a loop in Chhattisgarh.

Status updates

See also

Notes

  1. ^ Distances from the origin of the expressway, i.e., Raipur.

References

  1. ^ "Raipur-Visakhapatnam NH looks at timely completion by 2024". The New Indian Express. 19 April 2022. Retrieved 9 March 2023.
  2. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  3. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  4. ^ "Raipur-Visakhapatnam NH looks at timely completion by 2024". The New Indian Express. 19 April 2022. Retrieved 9 March 2023.
  5. ^ "Raipur Visakhapatnam Expressway Route Map, Cost, Progress, and More - Infra Info Hub". 28 January 2024. Retrieved 3 February 2024.
  6. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  7. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  8. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  9. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  10. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  11. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  12. ^ Rout, Kumar Hemant (5 September 2021). "NHAI to build first road tunnel in Odisha as part of Raipur-Vizag corridor". The New Indian Express. Retrieved 14 March 2023.
  13. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  14. ^ Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.

External links