Schuylkill River Passenger Rail
Schuylkill River Passenger Rail is a proposed passenger train service along the Schuylkill River between Philadelphia and Reading, Pennsylvania, with intermediate stops in Norristown, King of Prussia, Phoenixville, and Pottstown.
Passenger trains previously ran on this route from 1838 to 1981, when SEPTA discontinued service past Norristown on what is now known as the Manayunk/Norristown Line. Since then, various proposals have been made to restore full service to Reading.
Interest around the route has grown in the 2020s. In 2021 Amtrak included the route in its 2035 expansion vision. In 2022 county governments formed the Schuylkill River Passenger Rail Authority to further the development of the project. In 2023 the Federal Railroad Administration accepted the route into its Corridor Identification and Development Program, which allocates money for planning and prioritizes the project for future funding.
History
Prior service
The
The City of Philadelphia and suburban counties began providing public funds under contract with the PRR and Reading Company for continuation and improvement of regional rail service. Because the Reading's Norristown line was considered the stronger of the two, PRR service was cut back to Manayunk in 1960.
Conrail assumed operations of both lines in April 1976, resulting in all freight activity shifting to the former Reading Main Line. Commuter service on the former PRR line was extended from Manayunk to Ivy Ridge station in order to serve a new park-and-ride lot. Service to Reading used electric multiple-unit cars between Philadelphia's Reading Terminal and Norristown, and diesel-electric "push-pull" cars from Norristown to Reading. This operation continued until SEPTA ceased funding for the diesel section in 1981, two years prior to taking direct control of Philadelphia's commuter rail routes from Conrail. In 1986 service on the former PRR line was cut back from Ivy Ridge to Cynwyd station in Lower Merion Township.
Schuylkill Valley Metro
From 2000 to 2002, the Delaware Valley Regional Planning Commission, SEPTA, and other regional stakeholders studied the possible return of passenger rail service between Philadelphia and Reading, a project known as the Schuylkill Valley Metro (SVM).[1]
The SVM would use both sides of the former SEPTA R6 lines; the former PRR Schuylkill Branch between
Unlike the RDG trains, the new SVM would be entirely electric, with power being supplied by
Planners intended to operate trains at 15-minute intervals during peak travel times, Mondays to Fridays, and at 30-minute intervals at all other times. Norfolk Southern Railway trains would have been able to use most of the system at all hours, but would have been restricted to overnight movements at some locations after SVM ceased operations at night between Midnight and 6 a.m.
In August 2006, Pennsylvania Governor
Greenline
Another approach, known as the
Norristown Extension
After the Schuylkill Valley Metro plan was rejected by
Recent efforts
In mid-2018, the borough of Phoenixville began a study to restore SEPTA passenger rail service between Norristown and Phoenixville along Norfolk Southern freight railroad tracks.[16] In 2018, The Berks Alliance commissioned a study on the restoration of Passenger Rail service between Reading and Philadelphia. This study indicated that there was sufficient ridership to make the service economically viable. The proposed extension would utilize existing Norfolk Southern freight railroad tracks. Some improvements may be required, but most of the line could handle passenger rail service at a maximum speed of 70 mph (110 km/h). Before service can be implemented, a study would need to take place.[17]
In 2020, the Pennsylvania Department of Transportation inspired by the work in Phoenixville and Reading created its own plan about the feasibility of extending passenger train service from Norristown to Reading along the Norfolk Southern freight line. The Berks Alliance report projected that proposed extension would cost $365 million, which includes buying the trains and paying Norfolk Southern to use the line, with an annual operating cost of $20 million. The PennDOT study projected a higher cost of around $800 million. Inclusion of this expansion in the State Rail Plan was important for the initiative to receive federal funding from the Federal Rail Authority. Amtrak has subsequently included this project in its plans, which in turn is also helpful for discussions with Norfolk Southern and the FRA.
Stations would be located in Reading, Pottstown, Royersford, Phoenixville, and Norristown; from where the train will follow the existing Manayunk/Norristown Line to Philadelphia.[18]
Rail service between Reading and Philadelphia along the Norfolk Southern line is included in
In May 2022, Berks, Chester, and Montgomery counties formed the Schuylkill River Passenger Rail Authority for the purpose of furthering the project.[24] The authority's first meeting was held in July 2022.[25] The Rail Authority applied to the Corridor Identification and Development Program, the mechanism for the Federal Railroad Administration to develop new train routes funded by the Infrastructure Investment and Jobs Act. The route was accepted by the FRA in December 2023, granting $500,000 toward route development and prioritizing the project for future federal funding.[26]
References
- ^ "Schuylkill Valley Metro". www.dvrpc.org. Delaware Valley Regional Planning Commission. Retrieved 11 July 2022.
- ^ "Rail link to Philadelphia won't occur, Rendell says". Reading Eagle. 2006-08-24.
- ^ "Metro project gets lukewarm support". Archived from the original on 2007-03-11. Retrieved 2008-02-25.
- ^ "Community log: Transportation study". Retrieved 2008-02-25.
- ^ "Congressman meets with borough officials". Retrieved 2011-04-27.
- ^ Citizens for the Train Archived 2009-09-29 at the Wayback Machine
- ^ phoenixville.patch.com "Greenline not moving forward"
- ^ "R6 Extension Study". Archived from the original on 28 August 2009.
- ^ Hambright, Brett (August 10, 2010). "Technology is making tolls (almost) painless". Reading Eagle. Retrieved December 12, 2010.
- ^ Hambright, Brett (December 12, 2010). "Decision near on Route 422 tolls". Reading Eagle. Retrieved December 12, 2010.
- ^ PA-TEC 422 Corridor Transportation Improvements Proposal
- ^ PA-TEC news: Sept 2011
- ^ "Crowd gives 422 tolling plan unwelcome reception". The Mercury. September 13, 2011.
- ^ "REPORT: Tolls not the 'best option' for Route 422". newsworks.org/. Journal Register News Service. October 5, 2011.
- ^ "Report backs off 422 tolling plan". newsworks.org/. Daily Local News. October 6, 2011. Archived from the original on January 2, 2013.
- ^ "Phoenixville Regional Rail Plan Moving Forward". Patch. May 9, 2018. Retrieved June 20, 2018.
- ^ Brelje, Beth (August 21, 2018). "Panel hopes to revive Reading to Norristown passenger train service". Reading Eagle. Archived from the original on August 25, 2018. Retrieved August 26, 2018.
- ^ Herman, Holly (November 27, 2020). "PennDOT plans to finalize a study on using Norfolk Southern freight tracks to restore rail passenger service to Reading". Reading Eagle. Retrieved November 27, 2020.
- ^ Vasil, Jim (April 1, 2021). "Reading, Philly train travel part of Amtrak's 2035 vision". Allentown, PA: WFMZ-TV. Retrieved April 1, 2021.
- ^ "Amtrak reveals 'vision' for service between Reading, NYC". Allentown, PA: WFMZ-TV. August 20, 2021. Retrieved August 20, 2021.
- ^ "New York-Philadelphia-Reading". Amtrak. Retrieved August 20, 2021.
- ^ Brandt, Evan (February 11, 2022). "Amtrak eyes express bus between Reading and Philadelphia". The Pottstown Mercury. Retrieved February 11, 2022.
- ^ "Amtrak launches bus service from Philadelphia to Reading, Pottstown". Allentown, PA: WFMZ-TV. June 3, 2022. Retrieved June 3, 2022.
- ^ Cooper, Kenny (2 May 2022). "Move over SEPTA. Meet SRPRA — a new transportation authority is inbound". WHYY. Retrieved 11 July 2022.
- ^ Rearden, Caitlin; Kostival, David (6 July 2022). "Schuylkill River Passenger Rail Authority conducts inaugural meeting". WFMZ.com. Retrieved 12 July 2022.
- ^ "Houlahan: Reading on track to restore rail service". Berks Weekly. 5 December 2023. Retrieved 6 December 2023.