Stone Crossing railway station
General information | |
---|---|
Location | Stone, Borough of Dartford England |
Coordinates | 51°27′5.03″N 0°15′50.13″E / 51.4513972°N 0.2639250°E |
Grid reference | TQ573749 |
Managed by | Southeastern |
Platforms | 2 |
Other information | |
Station code | SCG |
Classification | DfT category E |
History | |
Opened | 2 November 1908 |
Passengers | |
2018/19 | 0.236 million |
2019/20 | 0.252 million |
2020/21 | 82,318 |
2021/22 | 0.174 million |
2022/23 | 0.222 million |
Notes | |
Passenger statistics from the Office of Rail and Road |
Stone Crossing railway station is located on the North Kent line, north-east of the village of
Train services from the station run eastbound to
Before rail privatisation, a ticket office was provided here, on the 'up' side, in the signal cabin adjacent to the level crossing gates at the eastern end of the station. This became unstaffed thereafter. A PERTIS passenger-operated ticket machine was in due course installed and issued 'Permits to Travel' - exchanged on-train or at staffed stations for travel tickets. In October 2016 the PERTIS machine was removed and replaced with a new ticket machine. The ticket machine is of the newer secure design and only accepts Card Payments. A ticket office service is now provided for 3½ hours in the morning on weekdays.[1]
Layout
Planning applications were lodged by Network Rail in the autumn of 2016 for a footbridge to be built (replacing the level crossing) at a reported cost of over £2 million.[2] The level crossing permanently closed on 25 February 2018 and the following day an adjacent footbridge, with ramped access, was opened.[3]
Services
Services at Stone Crossing are operated by Southeastern and Thameslink using Class 376, 465, 466, 700 and 707 EMUs.
The typical off-peak service in trains per hour is:[4]
- 2 tph to London Charing Cross via Sidcup
- 2 tph to Luton via Woolwich Arsenal and Greenwich
- 2 tph to Gravesend
- 2 tph to Rainham via Chatham
Additional services, including trains to and from London Cannon Street via Woolwich Arsenal and Lewisham call at the station during the peak hours.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Southeastern | ||||
Thameslink |
References
- ^ "National Rail Enquiries - Station facilities for Stone Crossing".
- ^ "Application for prior approval for the construction of a new footbridge pursuant to Section 3, Part 18 Condition A of Schedule 2 the Town and Country Planning (General Permitted Development) Order 2015". Dartford Borough Council. 7 October 2016. Archived from the original on 23 December 2016. Retrieved 22 December 2016.
- ^ "Stories". Archived from the original on 19 September 2018. Retrieved 12 October 2019.
- ^ Table 200, 201 National Rail timetable, December 2023
External links
- Train times and station information for Stone Crossing railway station from National Rail