Worth Street station
Worth Street | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Former New York City Subway station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station statistics | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Address | Lafayette Street & Worth Street New York, NY | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Borough | Manhattan | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Civic Center | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 40°42′56″N 74°00′11″W / 40.7155°N 74.003°W | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Division | A (IRT)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | IRT Lexington Avenue Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | None (abandoned) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure | Underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 side platforms | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | October 27, 1904[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closed | September 1, 1962[3] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Traffic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2023 | [4] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rank | out of 423 Brooklyn Bridge–City Hall | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Worth Street station was a local
The Worth Street station was constructed for the
The Worth Street station contains two abandoned side platforms and four tracks. The station was built with tile and mosaic decorations. Many of these decorations have been covered with graffiti.
History
Construction and opening
Planning for a subway line in New York City dates to 1864.[5]: 21 However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature passed the Rapid Transit Act.[5]: 139–140 The subway plans were drawn up by a team of engineers led by William Barclay Parsons, the Rapid Transit Commission's chief engineer. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[6]: 3 A plan was formally adopted in 1897,[5]: 148 and all legal conflicts concerning the route alignment were resolved near the end of 1899.[5]: 161 The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[7] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[5]: 165 In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[6]: 4 Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[5]: 182
The Worth Street station was constructed as part of the route segment from Chambers Street to Great Jones Street. Construction on this section of the line began on July 10, 1900, and was awarded to Degnon-McLean Contracting Company.: 186
The first collision in the history of the New York City Subway system occurred at the station on January 11, 1905. On that date, the motorman of a southbound Lenox Avenue train did not obey a caution signal at the Spring Street station, which indicated that there was a train ahead between Canal Street and Worth Street, and collided into a Broadway train that was stopped at Worth Street, waiting for a signal to clear.[9] The accident shattered the glass in the rear car of the Broadway train, and the first two cars of the Lenox Avenue train. Six people were hurt by falling glass.[10] The accident could have been averted if the local tracks had automatic tripping devices, which were present on the express tracks.[11] The installation of these devices on the local tracks was considered to be impractical due to the high frequency of local service.[9] The accident only resulted in a ten minute delay in service, and after it was determined no people were killed, the trains proceeded in regular service.[12]
Service changes and station renovations
After the first subway line was completed in 1908,
On March 20, 1906, the IRT tested a vacuum cleaner connected to a portable wagon plant to clean the station. It found that it was very successful at removing dust from the station's tiling and woodwork, and at removing greasy dirt from girders.[15][16]
To address overcrowding, in 1909, the
In December 1922, the Transit Commission approved a $3 million project to lengthen platforms at 14 local stations along the original IRT line, including Worth Street and seven other stations on the Lexington Avenue Line. Platform lengths at these stations would be increased from 225 to 436 feet (69 to 133 m).[20][21] The commission postponed the platform-lengthening project in September 1923, at which point the cost had risen to $5.6 million.[22][23]
The city government took over the IRT's operations on June 12, 1940.[24][25] The downtown platform was lengthened in 1948 by the New York City Board of Transportation, providing for the full length of a ten-car, 514-foot-long (157 m) train.[26] The work was done only on the downtown side to save costs, and that platform was chosen for lengthening since it was the main unloading side in the business district.[citation needed]
Closure
On January 3, 1957, the New York City Transit Authority announced that this station would be closed within two years as part of a plan to improve the
The station was closed on September 1, 1962 with the completion of work at Brooklyn Bridge. While the opening of new entrance at the northwest corner of Reade Street and Lafayette Street was also scheduled for that date,[3] it ended up opening a week later.[28] After the Worth Street station's closure, Brooklyn Bridge–City Hall was renamed Brooklyn Bridge–Worth Street.[29] This name lasted until at least 1984,[30] though has since fallen out of use.[31]
Station layout
Ground | Street level | |
Platform level | Side platform, not in service | |
Northbound local | ← do not stop here (Canal Street) | |
Northbound express | ← do not stop here | |
Southbound express | do not stop here → | |
Southbound local | do not stop here (Brooklyn Bridge–City Hall) → | |
Side platform, not in service |
Like other local stations, Worth Street has four tracks and two abandoned
As with other stations built as part of the original IRT, the station was constructed using a
The decorative scheme consisted of blue/green tile tablets, buff tile bands, a green terracotta cornice, and buff terracotta plaques.[33]: 34 [40] The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[33]: 31 The decorative work was performed by tile contractor Manhattan Glass Tile Company and terracotta contractor Atlantic Terra Cotta Company.[33]: 34 The station walls had shields with the white letter "W".[41] The station's walls and columns have been heavily covered with graffiti.[42]
The station lies beneath the sidewalk on the west side of Foley Square. When the Federal Plaza Building was in the planning stages, it was found that, because of the existence of the station, the building could not extend out to Foley Square. As a result, that structure is set far back from the street, well beyond the station. The building's plaza and fountain lie directly above the station.[citation needed]
See also
- 18th Street (IRT Lexington Avenue Line)
- 91st Street (IRT Broadway – Seventh Avenue Line)
References
- ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- ^ ISSN 0362-4331. Retrieved April 21, 2020.
- ^ ISSN 0362-4331. Retrieved May 30, 2010.
- ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ a b c d e f g h Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
- ^ a b c d e "Interborough Rapid Transit System, Underground Interior" (PDF). New York City Landmarks Preservation Commission. October 23, 1979. Retrieved November 19, 2019.
- ^ a b Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
- ISSN 0362-4331. Retrieved May 10, 2022.
- ^ a b "Blames Motorman For Crash In The Subway. Superintendent Hedley Declares He Ran Past Signals—Clever Device to Guard Express Trains". New York Evening World. January 11, 1905. Retrieved July 6, 2020.
- ^ "Accident In The Subway". Fort Wayne Daily News. January 11, 1905. Retrieved July 6, 2020.
- ^ "First Collision On The New Subway. Fault of Motorman Who Disregarded Warning Signal". Albuquerque Journal. January 18, 1905. Retrieved July 6, 2020.
- ^ "Brooklynites In Crash. Subway Train, Carrying Party Home from Euchre, in Collision—Three Badly Hurt". Brooklyn Times Union. January 11, 1905. Retrieved July 6, 2020.
- ^ "Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now". The New York Times. August 2, 1908. p. 10. Retrieved November 6, 2016.
- ^ Brooklyn Daily Eagle Almanac. Brooklyn Daily Eagle. 1916. p. 119.
- ^ "Clean Subway By Vacuum. Plain Is Tried as an Experiment and Is Declared To Have Been Successful". The New York Herald. March 21, 1906. Retrieved July 6, 2020.
- ^ "Vacuum Cleaning Tried In Subway. Interborough Makes Practical Test of System at Worth Street Station". Compressed Air. 11 (3): 4049. May 1906.
- ^ a b Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
{{cite web}}
: CS1 maint: postscript (link) - ^ a b Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911.
- ^ "Open New Subway Lines to Traffic; Called a Triumph — Great H System Put in Operation Marks an Era in Railroad Construction — No Hitch in the Plans — But Public Gropes Blindly to Find the Way in Maze of New Stations — Thousands Go Astray — Leaders in City's Life Hail Accomplishment of Great Task at Meeting at the Astor" (PDF). The New York Times. August 2, 1918. p. 1. Archived (PDF) from the original on February 21, 2021. Retrieved November 6, 2016.
- ISSN 0362-4331. Retrieved June 21, 2022.
- ProQuest 573974563.
- ISSN 0362-4331. Retrieved June 21, 2022.
- ProQuest 1237290874.
- from the original on January 7, 2022. Retrieved May 14, 2022.
- ProQuest 1248134780.
- ^ a b Proceedings of the New York City Board of Transportation. New York City Board of Transportation. 1949. p. 1585.
- ISSN 0362-4331. Retrieved September 4, 2016.
- ^ ERA Headlights. Electric Railroaders Association. 1962.
- ^ "IRT Worth St. Station To Be Closed Reade-Lafayette Stairway To Open". Flickr. New York City Transit Authority. 1962. Retrieved July 6, 2020.
- ^ The Associated Press (April 21, 1984). "Repairs to Subway Track Force Rerouting of Lines". Newsday. Retrieved October 18, 2023.
- ^ Lam, Joyce (December 4, 2013). "The Abandoned Worth Street Subway Station in NYC". Untapped New York. Retrieved October 18, 2023.
- ^ OCLC 49777633 – via Google Books.
- ^ a b c d e f g h Framberger, David J. (1978). "Architectural Designs for New York's First Subway" (PDF). Historic American Engineering Record. pp. 1–46 (PDF pp. 367–412). Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
{{cite web}}
: CS1 maint: postscript (link) - ^ "Station To Open: $6-Million Subway Platform In Lower Manhattan". The Hackensack Record. August 29, 1962. Retrieved July 6, 2020.
- ISBN 9780390812957.
- ^ "Fare Control Area at Worth Street". guerrillaexploring.com. Retrieved July 6, 2020.
- ^ Scott, Charles (1978). "Design and Construction of the IRT: Civil Engineering" (PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283). Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
{{cite web}}
: CS1 maint: postscript (link) - ^ "Image of the southbound platform at Worth Street". nycsubway.org. 1960. Retrieved July 6, 2020.
- ^ "Worth Street sign on column". Abandoned Stations. Retrieved July 6, 2020.
- ^ "The Subway and its Stations". Harper's Weekly. 47 (2406): 176. January 31, 1903.
- ^ "Shield at Worth Street". Abandoned Stations. 2002. Retrieved July 6, 2020.
- ^ Anastasio, Joe (August 17, 2005). "Exploring the Abandoned Worth Street Subway Station (2005)". ltvsquad.com. Retrieved July 6, 2020.
External links
- nycsubway.org – IRT East Side Line: Worth Street
- Abandoned Stations — Worth Street
- Forgotten NY — Original 28 - NYC's First 28 Subway Stations