Zhiguli Hydroelectric Station
Zhiguli Dam | |
---|---|
GWh |
The Zhiguli Hydroelectric Station or Zhigulyovskaya Hydroelectric Station (
. It is the sixth stage of the Volga-Kama Cascade of dams, and the second of them by installed power.General data
Construction started in 1950 and was completed in 1957. The complex consists of earth-fill dam, 2800 m long, 750 m wide and 52 m high, concrete spillway dam, 980 m long, power plant house, 700 m long, and two-lane navigable locks. Installed power is 2,488 MW, average annual production is 11,700 GWh. The power house has 20 generator units with Kaplan turbines, 4 of 120 MW and 16 of 125.5 MW at 22.5 m head. The dam forms Kuybyshev Reservoir.
Economic value
The station covers peak loads and maintains frequency stability in the
History
The idea of hydroelectric station on the Volga near Samara Bend was proposed by Gleb Krzhizhanovsky in 1910. Ten years later K. V. Bogoyavlensky proposed a hydroelectric station near Perevoloki, utilizing naturally existing water level difference. The disrupted economic system of the time did not allow this project to be realized.
In the early 1930s the Volga near Samara Bend and Yaroslavl was surveyed, and some dam projects were proposed. In 1937 the project of a dam near the villages of Perevoloki and Krasnaya Glinka was approved. Forced labour from Kuybyshev Camp was used (up to 40,000 people). In the autumn of 1940, oil fields were found near the construction site, causing a halt in construction.
The
Locks
In July 1955 the first steamer vessel passed through the lower locks. The main stream of the Volga was shut off in November of that year, and the first turbine was put under load on 29 December 1955. In less than a year, by October 1956, 1000
During construction the main stream of the Volga was shut in record time – in 19.5 hours during the period of minimal discharge ( 3800 m³/s ). Each turbine unit was mounted in an average of one month, half the usual time needed for that type of hydroelectric stations at that time. Later it was revealed that the turbines were actually able to run at an output of 115