Asrama Haji LRT station
P02 Asrama Haji | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Line 1 | |||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | none | ||||||||||
Bicycle facilities | none | ||||||||||
Accessible | Available | ||||||||||
Other information | |||||||||||
Station code | ASH | ||||||||||
History | |||||||||||
Opened | 7 September 2018[1] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Location in Palembang |
Asrama Haji Station is a
Palembang LRT Line 1. The station began operations on 7 September 2018, after the 2018 Asian Games had concluded.[2]
Nearby the station is Palembang Hajj Dormitory (Asrama Haji Palembang), hence its name.
Station layout
2F Platforms |
Side platform, doors will open on the right | |
Platform 1 | LRT Line 1 towards DJKA →
| |
Platform 2 | ← LRT Line 1 towards SMB II
| |
Side platform, doors will open on the right | ||
1F | Concourse | Faregates, Ticket Booths, Station Control, Shops, Musalla |
G | Street Level | Parking (plan) |
References
- ^ Siemen Martin (ed.). "Jadwal LRT Palembang Terbaru, Stasiun Asrama Haji Operasional, Catat Agar tak Telat" (in Indonesian). Retrieved 7 September 2018.
- ^ "Pascasimulasi, LRT Palembang Kini Fungsikan 7 Stasiun". KOMPAS (in Indonesian). 7 September 2018. Retrieved 20 November 2018.