Expressway S2 is a short
History of construction
Construction of the first phase of the project was divided into two sections. Work on a 3.9 km stretch between Warszawa Lotnisko junction (linking to expressway S79) and Puławska junction at the eastern end of this phase of the project began in September 2009,[1] while construction of the other, 11.1 km long section between the western Konotopa junction (linking the motorway A2 and the western portion of the ring road, expressway S8) and Warszawa Lotnisko junction, began in the Summer of 2010.[2]
Both sections were scheduled to be completed in mid 2012 in time for the
The second phase of the project took the expressway S2 east of Puławska across the
The contracts were:[citation needed]
- Contract A (4.6 km) including tunnel under Ursynów : AstaldiS.p.A., price about 1 222 mln zł.
- Contract B (6.45 km) including a bridge over the Vistula river: Gülermak Ağır Sanayi İnşaat ve TaahhütA.S. and PBDiM Mińsk Maz. , price about 757.6 mln zł.
- Contract C (7.45 km) including overpasses in Masovian Landscape Park: Warbud S.A. price about 561.7 mln zł.
- Oversight: Egis Polska Inżynieria Sp. z o.o., price about 53.4 mln zł.
Route description
Country | Voivodeship | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|---|
Praga Północ | • West end of S2 road designation, expressway continues as motorway A2 towards Poznań
• Kilometrage continues from motorway A2 • Centrum means center • North-west end of S8 and E 67 overlap • West end of E 30 overlap | |||||||
collector-distributor road
Incomplete junction, the only exit/entry ramps:
| ||||||||
461.4 | 286.7 | — | Opacz | S 7 / E77 – Kraków S 8 / E67 – Wrocław, Katowice Warszawa-Centrum | Part of Opacz interchange, accessible only from collector-distributor road
Centrum means center South-east end of S8 and E 67 overlap | |||
Warsaw | 463 | 288 | — | Opacz | al. Krakowska – Centrum / Raszyn, Janki | Part of Opacz interchange, accessible only from collector-distributor road
Centrum means center Access to Krakowska Avenue (Polish: Aleja Krakowska) | ||
468.2 | 290.9 | — | Warszawa Lotnisko interchange | S 7 – (under construction) S 79 – Mokotów, Warsaw Chopin Airport, ul. Marynarska | S7 under construction; access to Marynarska Street (Polish: ulica Marynarska) through expressway S79
West end of S79 overlap | |||
470.2 | 292.2 | R12 | Puławska | DK 79 – Piaseczno / Sandomierz | East end of S79 overlap; access to Puławska Street (Polish: ulica Puławska) | |||
470.7 | 292.5 | R13 | Instytut Onkologii , ul. Gandhi, ul. Płaskowickiej | Incomplete junction, the only exit/entry ramps:
access to Institute of Oncology, Gandhi Street (Polish: ulica Gandhi) and Płaskowickiej Street (Polish: ulica Płaskowickiej) | ||||
474 | 295 | R13 | Ursynów Wschód | local road – Ursynów | Incomplete junction, the only exit/entry ramps:
Access to Branickiego Street (Polish: ulica Branickiego) | |||
475.5 | 295.5 | R14 | Warszawa Wilanów | DW 724 – Wilanów, Centrum / Góra Kalwaria | Access to Przyczółkowa Street (Polish: ulica Przyczółkowa)
Centrum means center | |||
477.1 | 296.5 | — | Czerniakowska-bis | local road – Mokotów | Proposed junction with planned section of Polski Walczącej Avenue (Polish: Aleja Polski Walczącej), known informally as Czerniakowska-bis Street (Polish: ulica Czerniakowska-bis) | |||
481 | 299 | R15 | Wał Miedzeszyński | DW 801 – Wawer, Praga Południe / Puławy | Access to Wał Miedzeszyński Street (Polish: ulica Wał Miedzeszyński) | |||
483.5 | 300.4 | R16 | Patriotów | ul. Patriotów – Otwock | Access to westbound Patriotów Street (Polish: ulica Patriotów) | |||
484.1 | 300.8 | R16 | Patriotów | ul. Patriotów – Centrum Zdrowia Dziecka, Rembertów | Access to eastbound Patriotów Street (Polish: ulica Patriotów) | |||
Majdan, Otwock County | 489.7 | 304.3 | R17 | Lubelska | DK 17 – Warszawa S 17 / E372 – Lublin | Upgrade works on national road 17 | ||
Izabela, Masovian Voivodeship | 490.7 | 304.9 | — | A 2 / E30 – Terespol | East end of S2 road designation, expressway continues as motorway A2
• Kilometrage continues on motorway A2 • East end of E 30 overlap | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ http://www.drogi.waw.pl/index.php?p=odcinek&nr=9
- ^ http://www.drogi.waw.pl/index.php?p=odcinek&nr=8
- ^ "Wszystkie ekspresówki opóźnione. Kiedy skończą budowy?". Gazeta Wyborcza. April 10, 2012.
- ^ "GDDKiA document for tender". Archived from the original on 2019-07-12. Retrieved 2013-12-19.
- ^ www.gddkia.gov.pl
- ^ Poland’s longest road tunnel opens in Warsaw