Changchun–Jilin intercity railway
Changchun–Jilin intercity railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC (Overhead line) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 250 km/h (160 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Changchun–Jilin intercity railway (
Summary
The line connects, and terminates at, the cities of Changchun and Jilin. The entire line spans 111 km (69 mi) and was built at a cost of RMB 9.6 billion. Construction began on May 13, 2007, and the line was officially open to the public on January 11, 2011. The operational speed of the network is 250 km/h (160 mph), which means that travel between the two cities now takes about 29 minutes, down from the previous 1.5 hours. The line also services Changchun Longjia International Airport with Longjia railway station, which is nine minutes from Changchun station and 22 minutes from Jilin station.
At Jilin, the line continues as the Jilin–Hunchun intercity railway, terminating at Hunchun railway station.
Stations
The railway has seven stations, of which three are operational, two are scheduled to be operational and two are reserved for future operations. The stations are:
Station Name | Chinese Name | China Railway transfers/connections |
Metro transfers/connections | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Changchun | 长春 | Beijing–Harbin Railway
Harbin–Dalian high-speed railway |
4
| |||||||
Konggang (reserved) |
空港 | |||||||||
Longjia | 龙嘉 | |||||||||
Jiutai South | 九台南 | |||||||||
Xinhuapichang (reserved) |
新桦皮厂 | |||||||||
Shuangji | 双吉 | |||||||||
Jilin | 吉林 | Jilin–Hunchun intercity railway |
Ticketing
All operational stations have both staffed ticket booths and ticket vending machines. As of June 2011[update], the ticket vending machines can only accept cash (fourth and fifth series renminbi banknotes in denominations ¥5, ¥10, ¥20, ¥50 and ¥100 only, no coins) as payment.
References
- ^ "Railway Gazette: Northeast high speed opening". Retrieved 2011-02-13.