DND–KMP Expressway
DND–KMP Expressway | |
---|---|
(NH–148NA) KMP, Khalilpur, Nuh district, Haryana | |
Location | |
Country | |
Highway system | |
The DND–Faridabad–KMP Expressway, formally known as NH-148NA is a 59
The DND/
Route
The NH–148NA highway connects
NCT of Delhi (12 km)
- Begins in Delhi from the junction of Ring Road at Maharani Bagh
- Pass through Khizrabad, Batla House and Okhla Vihar on Yamuna river's west bank
- Starts moving exactly along the Agra Canal from Okhla Vihar metro station to Mithapur
- 2nd entry ramp near Kalindi Kunj metro station (towards Hari Nagar Badarpur-Mithapur) for traffic from Noida
- Exits Delhi and enters Haryana through MCD Toll Plaza at Mithapur Extension, Delhi.
Haryana (47 km)
- On Kalindi Kunj–Mithapur road, it will cross the Agra Canal at Sehatpur Bridge (Faridabad)
- Move on Faridabad bypass road from Sector-37, Faridabad to Kail Gaon near Ballabhgarh[6]
- At Sector-65 Faridabad bypass, there is a 31 km long link highway to Jewar Airport
- Interchange with Delhi–Agra (NH-2) near DPS Ballabhgarh school at Kail Gaon
- Passes under the Western DFC at Paroli village (Palwal district)
- Crosses Palwal–Sohna (NH-919) at Hajipur village (Gurgaon district)
- Toll Plaza at Kiranj (Nuh district). It is 56 km from the DND starting point
- KMP Expressway at Khalilpur (Nuh district).
KMP interchange
After reaching KMP interchange at Khalilpur, traffic coming from Maharani Bagh (Delhi) and Faridabad bypass has 2 options:
1. They can turn south towards Dausa and Mumbai, or turn north towards Gurgaon and Sohna.
2. They can also use
.Construction
The construction work of the 'DND–Faridabad–KMP' section was awarded by the National Highways Authority of India (NHAI) to Dineshchandra R. Agrawal Infracon Private Limited (DRA Infracon) in August 2020.[7] This project will reduce congestion on Ashram to Ballabhgarh route (via Badarpur). In Haryana it will have multiple Flyovers and a 3-lane service road on either side of Faridabad bypass road.
7 km out of 9 km route of Package-1 in Delhi state will be elevated with two-level crossings at 4 locations of the Delhi Metro rail line (near Okhla Vihar and Kalindi Kunj metro station), making it the 1st expressway in India to cross above elevated metro rail line. NH-148NA exits Delhi at MCD Toll Plaza (near Mithapur) which is 12.5 km from the DND starting point.
Packages
The
Sr No | Package | Length in km
|
Value in crores | State |
---|---|---|---|---|
1. | Junction of DND Flyway & Ring Road in Delhi to Jaitpur–Pushta road in Delhi | 09 | ₹ 1,881
|
Delhi |
2. | Jaitpur–Pushta road in Delhi to Sector-62/65 dividing road in Faridabad | 24 | ₹ 1,832
|
Delhi & Haryana |
3. | Sector-62/65 dividing road in Faridabad to KMP Expressway at Khalilpur in Nuh district | 26 | ₹ 1,619
|
Haryana |
Note:
- Package-2 starts at junction of Jaitpur–Pushta road and Kalindi Kunj–Mithapur road in Delhi (near NTPC Eco Park, Badarpur).
- The deadline of construction work of Package-2 and 3 (Haryana) is 24 months, while deadline of Package-1 (Delhi) is 30 months.
Delhi–Mumbai Expressway
The construction work of
Section | Length in km
|
No. of packages | State-wise packages |
---|---|---|---|
KMP
|
59 | 03 | 1 in Delhi and 2 in Haryana |
KMP–Vadodara
|
844 | 31 | 3 in Haryana, 13 in Rajasthan, 9 in Madhya Pradesh and 6 in Gujarat |
Vadodara–Virar | 354 | 13 | 10 in Gujarat and 3 in Maharashtra |
JNPT
|
92 | 05 | 5 in Maharashtra |
Jewar Airport link
The
Spur Package | Length in km
|
Value in crores | State |
---|---|---|---|
Faridabad bypass (Sector 65), via interchange with EPE at Mohna, to Yamuna Expressway at Dayanat Pur village, north of Jewar | 31 | ₹ 1,660
|
Haryana and UP |
Status updates
- Mar 2019: Foundation stone of NH-148NA was laid by Union Minister Nitin Gadkari on 1 March 2019 in Mithapur, Delhi.[11]
- Dec 2019: NHAI invited bids for construction in 3 packages under Bharatmala Pariyojana.[12]
- July 2020: Work awarded by NHAI to DRA Infracon Private Limited (Package-1 & Package-2).[9]
- Aug 2020: Work awarded by NHAI to DRA Infracon Private Limited (Package-3).
- Oct 2020: Soil testing work started in Faridabad district of Haryana[13]
- Feb 2021: Construction work is expected to start this year: NHAI.[14]
- May 2021: Construction work started in Package-3 on 14 May 2021. Schedule completion is 24 months.
- Aug 2021: Construction work started in Package-2 (Faridabad bypass) on 10 August. Schedule completion is 24 months.
- Oct 2021: RoW in Faridabad.[15]
- Jan 2022: Construction work started in Package-1 (Delhi) on 11 January. The deadline of Package-1 is June 2024 (30 months).
- Mar 2022: Segment Launcher started erection of concrete structures in Maharani Bagh on 21 March. 7 km out of 9 km long (Package-1) is elevated.[16]
- July 2022: Tender for
- Feb 2023: The
- Aug 2023: The Package-2 (Jaitpur in Delhi to Sector-65, Faridabad bypass) has missed it's 24 months deadline of 10 August 2023.
- Feb 2024: Union Minister Nitin Gadkari inspected Package-1 & 2 followed by a press conference at DND on 14 February. He said project will be completed by 2024 end.[20]
See also
- List of Expressways in India
- Delhi–Amritsar–Katra Expressway
- Delhi–Mumbai Expressway
- Highways in Haryana
References
- ^ "Faridabad bypass renamed as DND-KMP Expressway on Google Maps". Hindustan. 23 July 2023.
- ^ "59-km six-lane road to connect DND, Ring Road with Delhi-Mumbai expressway - delhi news". Hindustan Times. Retrieved 4 August 2020.
- ^ "Delhi-Mumbai Expressway will be linked to Jewar Airport". Times of India. 8 July 2022.
- ^ "Jewar Airport और Delhi-Mumbai एक्सप्रेसवे से लिंक रहेगा DND-Faridabad-KMP Expressway, रूट मैप देखिए". Navbharat Times. 25 March 2023.
- ^ "DND-Faridabad-KMP Expressway to be connected with Delhi-Mumbai Expressway, Jewar Airport, check routes". DNA India. 27 March 2023.
- ^ "दिल्ली-मुंबई एक्सप्रेस-वे पर हरियाणा के फरीदाबाद से आ रही खुशखबरी, जानें फायदा". Dainik Jagran. 8 April 2022.
- ^ "Work awarded for new Delhi-Mumbai e-way link". Times of India.
- ^ "Delhi NCR: Six-lane highway to connect ring road-DND junction with Delhi-Mumbai Expressway". Times Now. Retrieved 4 August 2020.
- ^ a b "Contract award status of Delhi–Mumbai Expressway as of May 2021" (PDF). NHAI. 28 May 2021.
- ^ "Jewar International Airport will be linked to Delhi-Mumbai Expressway". News18. 16 September 2021.
- ^ "Nitin Gadkari to lay foundation stone for Rs 3,580 crore project to decongest Delhi". Economic Times.
- ^ "NHAI invites bids for highways under Bharatmala Pariyojana". Construction Week Online. 22 December 2019.
- ^ "Soil testing for Delhi-Mumbai Expressway link begins in Faridabad". Times of India.
- ^ "NHAI to start work on crucial decongestion projects in Delhi this year". Hindustan Times. 10 February 2021.
- ^ "NHAI to raze 500 structures for Delhi-Mumbai Expressway". The Tribune. 9 October 2021.
- ^ "दिल्ली-मुम्बई एक्सप्रेसवे के पहले चरण का निर्माण शुरू, नोएडा से बनकर जा रहा प्री-कास्ट मैटेरियल". TriCity Today. 22 March 2022.
- ^ "Tender opens for Expressway to link Faridabad & Jewar Airport". The Tribune. 31 July 2022.
- ^ "Noida Airport: 2 साल में दिल्ली-मुंबई एक्सप्रेसवे से जुड़ेगा जेवर एयरपोर्ट, 6 लेन पर खर्च होंगे 16.60 अरब, NHAI ने निकाला टेंडर". Navbharat Times. 31 July 2022.
- ^ "Ballabhgarh: Delhi-MumbaiExpressway link opens this week". The Times of India. 20 February 2023.
- ^ "Entire stretch from DND Flyway to Delhi-Mumbai Expressway to be opened by year end: Nitin Gadkari". The Times of India. 15 February 2024.