Interstate 481 (I-481) is an

auxiliary Interstate Highway that serves as an eastern bypass of Syracuse, New York, in the US. It begins at its parent, I-81, in the city's southern end and travels through the eastern Syracuse suburbs of Jamesville, DeWitt, and Cicero before rejoining I-81 in the suburb of North Syracuse. Upon crossing I-81 in North Syracuse, I-481 continues northwest to Fulton and Oswego as New York State Route 481 (NY 481). I-481 is part of the Veterans Memorial Highway
, which extends northward onto NY 481. Future plans call for I-481 to be decommissioned by a reroute of I-81 onto the freeway.

Route description

I-481 begins at

I-481 northbound nearing I-81 in North Syracuse

After exit 2, I-481 makes a bend to the north, crossing east of Butternut Creek Golf Course as it crosses into the town of

CR 53).[3]

After the interchange with CR 53, I-481 continues northward through DeWitt, paralleling Fly Road (

CR 82). A short distance to the west in the town of North Syracuse, I-481 enters exit 9, a cloverleaf interchange with I-81. At this junction, the designation of I-481 ends while NY 481 continues northwestward toward Oswego.[3]

History

What is now I-481 was originally proposed as parts of two separate highways bypassing the city of

limited-access highway extending from NY 57 in Fulton to the thruway in DeWitt via North Syracuse. All of I-281 and the segment of Relocated Route 57 east of I-81 in North Syracuse were redesignated as I-481 on January 1, 1970.[2]

The first section of the highway to be constructed was the portion between Jamesville Road and NY 5. Work on this portion of the freeway began c. 1963[5] and was completed and opened to traffic by 1965.[6] Construction of I-281, and later I-481, initially progressed northward from NY 5. The segment between Lyndon and I-690 was opened to traffic in the early 1970s,[7][8] while the piece between I-690 and the thruway was completed by 1977.[9] To the southwest, the section of I-481 from I-81 to Jamesville Road was finished in the early 1980s, finally connecting I-481 to its parent.[10][11] The last portion of the route from the thruway to I-81 in North Syracuse was completed south of NY 298 by 1985[12] and finished by 1990.[13]

Future

As part of the demolition and replacement of I-81 through Downtown Syracuse, I-481 will be redesignated as I-81, while the current route of I-81 will be redesignated as I-81 Business (I-81 Bus). As part of the project, both interchanges between I-81 and I-481 would be reconstructed. The ramps would be expanded to carry more traffic to account for the increased traffic. Also as part of the project, I-481 would be expanded to three lanes each way between exits 4 (I-690) and 5 (Kirkville Road); to three lanes northbound between exits 5 and 6 (I-90); and to three lanes southbound between exits 9 (I-81) and 8 (Northern Boulevard). Construction was expected to start in mid-2020 and take five years to complete.[14][15][16] However, in May 2021, Governor Andrew Cuomo announced the project would not commence until the following year. At this time, the New York state government allocated $800 million to the "community grid" plan.[17] In preparation for the reconstruction/relocation of I-81 around Syracuse, the American Association of State Highway and Transportation Officials (AASHTO), at its annual Spring Meeting in May 2021, conditionally approved the New York State Department of Transportation (NYSDOT)'s application to reroute I-81 over I-481 around the east side of Syracuse and redesignate I-81 through Syracuse as I-81 Bus, pending concurrence from the Federal Highway Administration (FHWA). The I-481 designation will be eliminated once these route changes have been completed. The Exit 16A ramp to I-481 North from I-81 south closed on September 11, 2023. The next ramp closure is the exit from I-481 south to I-81 south which happened on September 25, 2023. Both of those ramps will stay closed until spring 2025.[18]

Exit list

The entire route is in Onondaga County.

Locationmi[19]kmExitDestinationsNotes
I-81 – Syracuse, Binghamton
Exit 16A on I-81
1Brighton Avenue / Rock Cut RoadNo southbound signage for Rock Cut Road
DeWitt3.335.362Jamesville Road – Jamesville
5.148.273 NY 5 / NY 92 – DeWitt, FayettevilleSigned as exits 3E (east) and 3W (west)
6.4010.304
Fairgrounds
Eastern terminus of I-690
8.3213.395Kirkville RoadSigned as exits 5E (east) and 5W (west)
9.4515.216
I-90 Toll / New York Thruway – Albany, Buffalo
Exit 34A on I-90 / Thruway
10.2016.427 NY 298 – Bridgeport
Cicero13.4821.698Northern Boulevard
15.0824.279
I-81 – Watertown, Syracuse
Signed as exits 9N (north) and 9S (south); exit 29 on I-81

NY 481 north – Oswego
Continuation north
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ "Table 1: Main Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. December 31, 2021. Retrieved July 20, 2022.
  2. ^
    State of New York Department of Transportation (January 1, 1970). Official Description of Touring Routes in New York State
    (PDF). Retrieved July 13, 2010.
  3. ^ a b c Microsoft; Nokia (June 2, 2012). "overview map of Interstate 481" (Map). Bing Maps. Microsoft. Retrieved June 2, 2012.
  4. ^ New York Happy Motoring Guide (Map) (1963 ed.). Cartography by General Drafting. Esso. 1963.
  5. ^ New York with Sight-Seeing Guide (Map) (1962 ed.). Cartography by General Drafting. Esso. 1962.
  6. Rand McNally and Company. Mobil
    . 1965.
  7. ^ New York State Highways (Map). Cartography by Rand McNally and Company. State of New York Department of Commerce. 1969.
  8. Shell Oil Company
    . 1973.
  9. Exxon
    . 1977.
  10. ^ New York (Map). Cartography by General Drafting. Exxon. 1979.
  11. State of New York
    . 1981.
  12. .
  13. .
  14. ^ Lohmann, Patrick (April 22, 2019). "Exclusive: New York selects 'community grid' alternative for I-81 in Syracuse". Syracuse.com. Retrieved April 22, 2019.
  15. ^ McMahon, Julie (April 22, 2019). "I-81 timeline: Community grid will take 5 years of construction, NY says". Syracuse.com. Retrieved October 10, 2019.
  16. ^ CNYCentral (April 23, 2019). "I-81 Timeline: What happens next?". CNYCentral. WSTM-TV. Retrieved October 10, 2019.
  17. ^ Weaver, Teri (April 9, 2021). "Syracuse's I-81 project gets $800M in NY budget, with latest plan coming this summer". syracuse. Retrieved May 28, 2021.
  18. ^ "US Route Number Applications" (PDF). American Association of State Highway and Transportation Officials. Archived from the original (PDF) on April 20, 2023. Retrieved September 8, 2021.
  19. ^ "2008 Traffic Volume Report for New York State" (PDF). New York State Department of Transportation. June 16, 2009. p. 238. Archived from the original (PDF) on September 27, 2012. Retrieved February 1, 2010.

External links

KML is from Wikidata