Manitoba Highway 75
Lord Selkirk Highway French: Route Lord Selkirk | ||||
Route information | ||||
Maintained by Manitoba Infrastructure | ||||
Length | 93.6 km[1] (58.2 mi) | |||
Existed | 1949[2]–present | |||
Major junctions | ||||
South end | I-29 / US 81 at the Pembina–Emerson Border Crossing | |||
North end | PTH 100 (TCH) / Route 42 in Winnipeg | |||
Location | ||||
Country | Canada | |||
Province | Manitoba | |||
Rural municipalities | Emerson-Franklin, Montcalm, Morris, Ritchot | |||
Major cities | Winnipeg | |||
Towns | Morris | |||
Highway system | ||||
|
Provincial Trunk Highway 75 (PTH 75, also officially known as the Lord Selkirk Highway) is a major highway in the Canadian province of Manitoba. It is the main link between the city of Winnipeg and the United States border, where it connects with Interstate 29/U.S. Route 81 (I-29/US 81).
Route description
The
The entire route is a four-lane
Speed limits
On February 27, 2008, the Manitoba Highway Traffic Board approved a request by the Government of Manitoba to raise the speed limit on PTH 75 to 110 km/h (70 mph).[5] The speed limit change took effect on July 1, 2009, with the speed limit raised to 110 km/h (70 mph) from St. Jean Baptiste to the Canada-U.S. border. The remainder of the highway continues to have a speed limit of 100 km/h (60 mph) except in urban areas.[6]
- U.S. border to St. Jean Baptiste: 110 km/h (70 mph)
- Morris: 50–80 km/h (30–50 mph)
- Remainder of highway: 100 km/h (60 mph)
History
The PTH 75 route originated as the
The highway was originally designated as PTH 14 when Manitoba introduced the highway numbering system in 1920.[8] It was re-numbered to PTH 75 in 1949 as, at the time, it connected with US 75 at the Noyes–Emerson East Border Crossing and it was common practice for Manitoba to match highway numbers with connecting U.S. routes.[2] Coinciding with the renumbering, the section between Emerson and Letellier was replaced with a more direct route approximately three kilometres (1.9 mi) west of the original one along the Red River.[9] Further changes occurred in the 1950s when a more direct route was constructed in the Rural Municipality of Ritchot and bypasses were added around the communities of Ste. Agathe and St. Jean Baptiste.[9]
PTH 75 formerly extended into the city of Winnipeg. Prior to 1966, PTH 75 followed Pembina Highway (present-day Winnipeg Route 42) and Osborne Street (present-day Winnipeg Route 62) to PTH 1 (Broadway), continuing north as PTH 6.[10] When the Winnipeg Metro Routes were established in c. 1966, PTH 75 was decommissioned inside the Perimeter Highway,[11] with the section of highway between the Perimeter Highway and Winnipeg city limits cosigned as PTH 75 / Route 42.
PTH 75 was gradually converted to a divided four-lane highway between 1985 and 1994 except within the Town of Morris and a three-kilometre (1.9 mi) section between the Emerson East border station and (former) PTH 29 junction near the West Lynne (now Emerson) border station. The closure of the Noyes and Emerson East border stations (Canada in 2003; the U.S. in 2006) relegated PTH 75's southern terminus a dead-end at the border; thus, PTH 75 was re-routed to its present southern terminus (superseding PTH 29) in 2012. Most of the short decommissioned section of PTH 75 was added to Provincial Road 200. Motorists now wishing to travel US 75 are required to detour through Pembina, North Dakota via I-29, North Dakota Highway 59, and Minnesota State Highway 171.[12]
In 2020, the Canadian and Manitoba governments completed reconstruction of PTH 75's approach to the Emerson border crossing to accommodate future expansion at the port of entry. This included the removal of the old PTH 75/PR 200 (former PTH 29/75) intersection near the border and extending PR 200 to its new southern terminus further away from the border.[13] The Manitoba government also has future plans to reroute PTH 75 around the Winnipeg neighborhood of St. Norbert and connect it to Winnipeg Route 90 (Kenaston Boulevard).[14]
Flooding issues
PTH 75's proximity to the flood-prone Red River causes closures of the highway during spring flooding. The town of
Major intersections
Division | Location | km[1] | mi | Exit | Destinations | Notes |
---|---|---|---|---|---|---|
United States border | 0.0 | 0.0 | I-29 south / US 81 south – Grand Forks | Continuation into North Dakota | ||
Pembina–Emerson Border Crossing | ||||||
US 75 and northern terminus of PTH 29 (1949–2012); intersection closed in 2019 | ||||||
1.8 | 1.1 | Dominion City | Realigned PR 200[20] | |||
Montcalm | | 8.7 | 5.4 | PR 421 west – Sommerfeld | ||
Dominion City | ||||||
| 22.7 | 14.1 | PTH 14 west – Winkler | |||
St. Jean Baptiste | 29.8 | 18.5 | Caron Street north | St Jean Baptiste access; former PTH 75 alignment; to PR 246 east; no access to PR 246 north of St. Jean Baptiste | ||
32.5 | 20.2 | Caron Street south | ||||
Town of Morris | 40.9 | 25.4 | PTH 23 east (Montreal Avenue) – La Rochelle | South end of PTH 23 concurrency | ||
41.3 | 25.7 | PTH 23 west (Boyne Avenue) – Roland | North end of PTH 23 concurrency | |||
Morris | | 44.7 | 27.8 | PR 330 north – Domain, La Salle | ||
| 54.6 | 33.9 | St. Pierre-Jolys | |||
Brunkild, Niverville | ||||||
Glenlea | 77.4 | 48.1 | Glenlea Road | Former PR 420 north | ||
| 82.3 | 51.1 | PR 429 east | |||
Howden | 82.3 | 51.1 | PR 247 west – La Salle | |||
Winnipeg | 90.8 | 56.4 | Route 42 begins / Turnbull Drive | Winnipeg city limits; Route 42 southern terminus; south end of Route 42 concurrency | ||
93.6 | 58.2 | 94 | PTH 100 (TCH) (Perimeter Highway) – Brandon, Kenora | Interchange; PTH 75 northern terminus; north end of Route 42 concurrency; signed as exits 94A (east) and 94B (west); PTH 100 exit 18 | ||
100.9 | 62.7 | McGillivray Boulevard (Route 155 west) | Former PTH 3 eastern terminus | |||
104.7 | 65.1 | Donald Street (Route 42 north) Osborne Street (Route 62 south) Corydon Avenue (Route 95 west) | Confusion Corner; former PTH 75 followed Osborne Street | |||
106.2 | 66.0 | Osborne Bridge crosses Assiniboine River | ||||
106.7 | 66.3 | Broadway (PTH 1) Osborne Street (Route 62 north) | Former PTH 75 northern terminus; former PTH 6 southern terminus[10] | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ a b Google (August 11, 2023). "Manitoba Highway 75" (Map). Google Maps. Google. Retrieved August 11, 2023.
- ^ a b "Winnipeg–Emerson Highway to Become #75" (PDF) (Press release). Province of Manitoba. March 14, 1949. Retrieved November 4, 2014.
- ^ "The National Highway System (NHS) Map". tc.gc.ca.
- ^ "Modern, Developed Infrastructure". Province of Manitoba.
- ^ "Manitoba to raise speed limit". Archived from the original on September 24, 2015. Retrieved July 12, 2008.
- ^ "Speed Limit to Increase on Certain Sections of Twinned Highway" (Press release). Province of Manitoba. Archived from the original on March 3, 2016. Retrieved September 4, 2017.
- ^ Henderson, Anne Matheson. "Manitoba Pageant: The Lord Selkirk Settlement at Red River, Part 3". mhs.mb.ca.
- ^ "Roads and Highways". The Canadian Encyclopedia. Retrieved November 10, 2014.
- ^ a b "Historical Highway Maps of Manitoba". Manitoba Infrastructure. Retrieved June 20, 2020.
- ^ a b Province of Manitoba. Manitoba Official Highway Map (PDF) (Map) (1964-1965 ed.). Winnipeg inset. Archived from the original (PDF) on September 14, 2015.
- ^ Province of Manitoba. Manitoba Official Highway Map (PDF) (Map) (1966-1967 ed.). Winnipeg inset. Archived from the original (PDF) on September 13, 2016.
- ^ Highway 75 at Canhighways.com
- ^ "Border Highway Redesign Displayed At Emerson Open House". Pembina Valley Online. March 6, 2015.
- ^ "Province to Redesign South Perimeter Highway, Create St. Norbert Bypass". ChrisD.ca. August 1, 2017.
- ^ "Hwy. 75 reopens, truckers happy". Winnipeg Free Press. May 17, 2011. Retrieved August 21, 2012.
- ^ "Red River flooding closes key Manitoba highway". Reuters. April 18, 2011. Retrieved August 21, 2012.
- ^ "Hwy 75 Flood Plans Expected". Steinbach Online. Retrieved August 21, 2012.
- ^ "Highway 75 revisited: Four ideas to keep road open". Winnipeg Free Press. April 9, 2009. Retrieved August 21, 2012.
- ^ "Groening 'Pleased' with Decision to Upgrade PR 246". Steinbach Online. June 6, 2020.
- ^ "Manitoba Infrastructure Monitoring New Access to Emerson Crossing". Pembina Valley Online. January 15, 2020.